Total Tenders: 1397
| 951 |
603043 |
Periodic Maintenance work (PMP Major) by HBB work with Base Type-II from Ch.00+000m to 03+000m of Bhatiapara-Kalna-Lohagara-Narail-Jessore (N-806) Road under Gopalgonj Road Division during the financial year 2021-2022. |
2021-2022 |
Gopalgonj Circle |
Gopalganj Division |
Revenue |
Not Available |
| 952 |
601815 |
Rehabilitation work by overly with 40mm DBS wearing course including slope protection, Road marking, Sign Signal & Kilometer- Post at Ch.32+500 (Aynabaj Kalaiya) to 47+000 (Kapula Kachare) of Lebukhali-Bauphal-Golachipa-Amragachia Road (Z-8806) Under Patuakhali Road Division During the year 2021-22. |
2021-2022 |
Patuakhali Circle |
Patuakhali Division |
Revenue |
Not Available |
| 953 |
606899 |
Periodic Mointenonce Program (PMP) of Sonohat Landport-Madarganj-Bhitorbandh-Nageshwoai Road (Z-5624) through Strengthening with Aggregate BaseType-1, Surfacing (DBS Wearing Course- 40mm)and Earth work from Ch. 0+150 (BDR Camp Moor) to 11+000 (Subolpar) under Kurigram Road Division during the year 2021-2022. |
2021-2022 |
Rangpur Circle |
Kurigram Division |
Revenue |
Not Available |
| 954 |
555702 |
Improvement of Sirajganj Bagbati-Dhunot Sonamukhi Road Z-5405 at Ch. 10750 to 21500 km by Construction of new Flexible Pavement Widening and Strengthening of pavement 3.70 m to 5.50 m DBS Surfacing 1x5.50 m Construction of RCC Box Culvert Concrete slope protection Construction of RCC U-Drain Cross Drain Saucer drain Toe wall Widening of road embankment Earth work Grass Turfing General & Site Facilities Sign Signal Km post Road marking etc. under Road Division Sirajganj during the year 2020-2021. WP-07 |
2020-2021 |
Rajshahi Zone |
Sirajgonj Division |
Development |
Not Available |
| 955 |
603171 |
Periodic Maintenance works under PMP-Major (Road) providing Aggregate base Type-1, DBS-Base course and DBST at Ch. 0+000 to 16+500 Km of Ullapara-Bellkuchi Road (Z-5058) under Sirajganj Road Division during the year 2021-2022. |
2021-2022 |
Rajshahi Zone |
Sirajgonj Division |
Revenue |
Not Available |
| 956 |
601855 |
Periodic Maintenance works under PMP-Major (Road) at Ch. 100+040 to 127+500 of Dhaka(Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandh Road (N-5) and Ch. 0+000 to 2+310 of Baderhat-Kazirhat (Latifpur) Road (N-505) under Pabna Road Division during the year 2021-2022. |
2021-2022 |
Rajshahi Zone |
Pabna Division |
Revenue |
Not Available |
| 957 |
604469 |
Periodic Maintenance works under PMP-Major(Road) providing Aggregate Base Type-I, DBS Wearing Course and Rigid Pavement from Ch. 7+880 to Ch. 18+720 km of Bonpara-Gopalpur-Lalpur Road (Z 6014) under Natore Road Division during the year 2021-2022. |
2021-2022 |
Rajshahi Zone |
Natore Division |
Revenue |
Not Available |
| 958 |
600947 |
Surfacing work with DBS-Base Course, DBS-Wearing Course, necessary repair, Earthwork & Protective work at different location of Gariarpar-Banaripara-Sawrupkati-Kawkhali-Naikati Road (Z-8033) & Barishal (Dinarerpool)-Laxmipasha-Dumki Road (Z-8044) under Barishal Road Division during the year 2021-2022. |
2021-2022 |
Barisal Circle |
Barishal Division |
Revenue |
Not Available |
| 959 |
599137 |
Slope Protection of Road Against Wave Action of Meghna River from Km 7+000 to Km 7+310 = 310 m (Betua Lunchghat) of Charfession-Betua Zilla Highway (Z-8909) Under Road Division, Bhola during
the year 2021-2022 |
2021-2022 |
Barisal Circle |
Bhola Division |
Revenue |
Not Available |
| 960 |
603216 |
Periodic Maintenace Program (PMP) of Ulipur-Nazimkhan-Razarhat(Khedabag) Road (Z-5618) through Strengthening with Aggregate Base Type-I and Surfacing (DBS Wearing course- 40mm) from Ch. 7+000(Bosher Bazar) to 18+100 (Razarhat) under Kurigram Road Division during the year 2021-2022. |
2021-2022 |
Rangpur Circle |
Kurigram Division |
Revenue |
Not Available |
| 961 |
606039 |
Periodic Maintenance Program (PMP) of Strengthening & surfacing work at Ch. 15+600 to 20+610 Km of Rangpur-Barobari-Kurigram (N-506) Road under Road Division, Rangpur during the year 2021-2022. |
2021-2022 |
Rangpur Circle |
Rangpur Division |
Revenue |
Not Available |
| 962 |
615600 |
Periodic Maintenance of Narail (Tularampur)-Maijpara Road (Z-7504) with Strengthening, Dense Bituminous Surfacing-DBS Wearing Course work, Earth Work, Road Marking, Traffic Sign, Sign Post & Protective work (R.C.C Palisiding) from Ch. 0+000m to 07+150m under Road Division, Narail during the year 2021-2022. |
2021-2022 |
Jeshore Circle |
Narail Division |
Revenue |
Not Available |
| 963 |
600404 |
Overlay works (DBSW) under periodic Maintenance Programme (PMP) of Navaron-Illisopur-Satkhira Road (R-765) (Satkhira Part)at Chainage : 16+877m to 17+377m and Ch: 31+500m to 33+000m (Jhaudanga) under Road Division, Satkhira During the year 2021-2022. |
2021-2022 |
Khulna Circle |
Satkhira Division |
Revenue |
Not Available |
| 964 |
591434 |
Development WP-01 & Widening, Strengthening, Raising, Straightening of existing roads and Construction of Hard Shoulder, Bus-Bays, Intersections, Re-construction, New-construction and extension of culverts, earth
work, Protective work, drainage work and Miscellaneous Item work of Shariatpur-Janjira-Nawdoba (Padma Bridge Approach) Road (R-863) From Ch. 0+000 to 11+500 & Monohar More to Shariatpur (Premtola) Road (R-861) Ch. 4+839 to6+903 under Shariatpur Road Division, during the year 2020-2021 (WP-01). |
2020-2021 |
Gopalgonj Zone |
Shariatpur Division |
Development |
Not Available |
| 965 |
565808 |
Estimate for Rigid Pavement and Toe Wall (PMP) at Pakuria Bazar, Jahanarabadh,Kutibari & Madarigonj of Mohonpur-Bagmara -Bhobanigonj Road (Z-6853) under RHD Road Division Rajshahi during the year 2020-2021. |
2020-2021 |
Rajshahi Circle |
Rajshahi Division |
Revenue |
Not Available |
| 966 |
562042 |
Construction of hard shoulder at ch. 455thp Km to 457thp Km and ch. 459th p Km to 460th p Km of DhakaMirpur-Utholi-Paturia-Notakhola-Bogra-Rangpur-Beldanga-Banglabandha N5 Road under Road Division Panchagarh during the year 2020-2021 |
2020-2021 |
Dinajpur Circle |
Panchagarh Division |
Revenue |
Not Available |
| 967 |
539154 |
providing Widening of Pavement from Ch. 39+000m to 44+630m, Strengthening the Existing Pavement with Surfacing by DBS-Base Course, DBS-Wearing Course, 1(One) Nos RCC Box Culvert & Providing Sign-Signal, km post, Guide post, Protective Works at different Km of Tekerhat-Gopalgonj(Horidaspur)-Mollahhat(Gonapara) Road (Road No.R-850) under Road Division, Gopalgong during the year 2020-2021. (Package No.PW-06) |
2020-2021 |
Gopalgonj Circle |
Gopalganj Division |
Development |
Not Available |
| 968 |
568073 |
Construction of 50.120 m (1x 48.78m) Long P.C. Girder Bridge(Hanshama Bridge) at 8th KM ch:07 KM +138.50m) of Bandarban-Rowangchari-Ruma Road (Z-1813) under Bandarban Road Division during the Year 2020-2021. |
2020-2021 |
Rangamati Circle |
Bandarban Division |
Revenue |
Not Available |
| 969 |
539152 |
providing New Construction from Ch.32850m to Ch. 33300m Ch. 37680m to 37760 Widening of Pavement from Ch. 32000m to 32850m Ch. 33300m to 37680m & Ch. 37760m to 39000m Strengthening the Existing Pavement with Surfacing by DBS-Base Course DBS-Wearing Course & Providing Sign-Signal Km post Guide post Protective Works at different Km of Tekerhat-GopalgonjHoridaspur-MollahhatGonapara Road Road No.R-850 under Road Division Gopalgong during the year 2020-2021. |
2020-2021 |
Gopalgonj Circle |
Gopalganj Division |
Development |
Not Available |
| 970 |
539146 |
providing New Construction from Ch.18+720m to Ch. 18+900m & Ch.21+650m to Ch.22+150m, Widening of Pavement from Ch. 16+000m to 16+175m, Ch. 16+375m to 18+720m, Ch. 18+900m to 21+650m & Ch. 22+150m to 24+000m, Rigid Pavement from Ch.16+175m to 16+375m, Strengthening the Existing Pavement with Surfacing by DBS-Base Course, DBS-Wearing Course, 2(Two) Nos RCC Box Culvert & Providing Sign-Signal, Km post, Guide post, Protective Works at different Km of Tekerhat-Gopalgonj(Horidaspur)-Mollahhat(Gonapara) Road (Road No.R-850) under Road Division, Gopalgong during the year 2020-2021. (Package No.PW-03) |
2020-2021 |
Gopalgonj Circle |
Gopalganj Division |
Development |
Not Available |
| 971 |
539144 |
providing New Construction from Ch.10+200m to Ch. 10+300m, Ch.12+375m to Ch. 12+525m & Ch.13+080m to Ch.13+400m, Widening of Pavement from Ch. 8+000m to 10+200m, Ch. 10+300m to 12+375m, Ch. 12+525m to 13+080m & Ch. 13+400m to 16+000m Strengthening the Existing Pavement with Surfacing by DBS-Base Course, DBS-Wearing Course, 3(Three) Nos RCC Box Culvert & Providing Sign-Signal, Km post, Guide post, Protective Works at different Km of Tekerhat-Gopalgonj(Horidaspur)-Mollahhat(Gonapara) Road (Road No.R-850) under Road Division, Gopalgong during the year 2020-2021. (Package No.PW-02) |
2020-2021 |
Gopalgonj Circle |
Gopalganj Division |
Development |
Not Available |
| 972 |
539148 |
Providing New Construction from Ch.26030m to Ch. 26230m Ch. 26280m to 26380m & Ch. 27950 to 28100m Widening of Pavement from Ch. 24000m to 26030m Ch. 26230m to 26280m Ch. 26380m to 27700 & Ch. 28100m to 32000m Rigid Pavement from Ch.27700m to 27950m Strengthening the Existing Pavement with Surfacing by DBS-Base Course DBS-Wearing Course 1One Nos RCC Box Culvert & Providing Sign-Signal km post Guide post Protective Works at different Km of Tekerhat-GopalgonjHoridaspur-MollahhatGonapara Road Road No.R-850 under Road Division Gopalgong during the year 2020-2021. Package No.PW-04 |
2020-2021 |
Gopalgonj Circle |
Gopalganj Division |
Development |
Not Available |
| 973 |
539111 |
Providing New Construction from Ch.1300m to Ch. 1480m Ch.5350m to Ch. 5600m & Ch.6420m to Ch.6720m Widening of Pavement from Ch. 0400m to 1300m Ch. 1480m to 5350m Ch. 5600m to 6270m & Ch. 6720m to 8000m Rigid Pavement from Ch.0000m to 0400m & Ch.6270m to 6420m Strengthening the Existing Pavement with Surfacing by DBS-Base Course DBS-Wearing Course 3Three Nos RCC Box Culvert & Providing Sign-Signal Km post Guide post Protective Works at different Km of Tekerhat-GopalgonjHoridaspur-MollahhatGonapara Road Road No.R-850 under Road Division Gopalgong during the year 2020-2021. Package No.PW-01 |
2020-2021 |
Gopalgonj Circle |
Gopalganj Division |
Development |
Not Available |
| 974 |
523770 |
Periodic Maintenance Programme Bridge/Culvert for Construction of 94.274m
3x30.488 long P.C Girder Boyrela Bridge at 26th Km Ch. 25796m of
Netrokona-Madon-Khaliajuri Road Z-3701 under Netrokona Road Division
during the year 2020-2021 |
2020-2021 |
Mymensingh Circle |
Netrokona Division |
Revenue |
Not Available |
| 975 |
560793 |
Periodic Maintenance Programme PMP providing strengthening by Aggregate Base Type-I repairing by Sub-base and surfacing by DBS work & protective work at Ch.18200 to 25410 Km. of Cumilla-Salda-Koshba Sayadabad Road N-114 under Road Division Cumilla during the year 2020-2021. |
2020-2021 |
Cumilla Circle |
Cumilla Division |
Revenue |
Not Available |
| 976 |
561073 |
Periodic Maintenance Programme PMP Providing Surfacing by DBS Wearing Course Rigid Pavement & Protective work at. Ch. 0000 to 1700 Ch.2000 to 3000 Ch.3275 to 3500 Ch. 3800 to 4020 Choddagram to Chatiany & Ch.17145 to 21320 Dainerdora to Laksham Km of Choddagram-Laksham Road Z-1045 under Road Division Comilla during the year 2020-2021. |
2020-2021 |
Cumilla Circle |
Cumilla Division |
Revenue |
Not Available |
| 977 |
537487 |
Construction of RCC U Drain at Ch. 11080m Bata Shoe Gate to 11320m Estema Road 240m of Dhaka Banani-Joydebpur-Mymensing N-3 Road 2 Outfall Drain Tongi Thana Gate to Main Road 282m and
Bata Shoe Gate to Turag River 1150m 3 Ch. 0000 Station Road to 0573m Ahsan Ullah Master Flyover Both Side 828m of 4-Lane Part of Tongi-Kaliganj-Ghorashal Road R-301 under Gazipur Road Division during the year 2020-2021. |
2020-2021 |
Dhaka Circle |
Gazipur Division |
Revenue |
Not Available |
| 978 |
549962 |
Periodic Maintenance Programme Road-Major for Providing Double Bituminous Surface Treatment-DBST including other necessary repair works from Ch. 0000 K.M Signboard to Ch. 20988 K.M Majhi Bari of Signboard-Morelgonj-Raynda-Shorankhola-Bogi Road R-773 under Bagerhat Road Division during the year 2020-2021. |
2021-2022 |
Khulna Circle |
Bagerhat Division |
Revenue |
Not Available |
| 979 |
564756 |
Periodic Maintenance Programme providing DBS Wearing course works at Ch. 0000to 6000 Ch. 8800 to 11200 of Chinakhora-Sujanagar Road and Ch. 0000 to Ch. 6817 of Ataikula-Sujanagar Road underPabna Road Division during the year 2020-2021. |
2020-2021 |
Rajshahi Zone |
Pabna Division |
Revenue |
Not Available |
| 980 |
542952 |
Periodic Maintenance Programme by providing DBS-Base Course DBS-Wearing Course and Construction of Rigid Pavement work at Ch. 0.000 to14.300 km of Kernil-Piyarpur Road Z-4104 under Jamalpur Road Division During the year 2020-2021 |
2020-2021 |
Mymensingh Zone |
Jamalpur Division |
Revenue |
Not Available |
| 981 |
524722 |
Construction of 6 nos i 25.74 m long P.C Girder Lalpur Bridge at 54TH KM ii 31.828 m long P.C Girder Kandapara Bridge at 57TH KM iii 31.828 m long P.C Girder Barak Bridge at 58TH KM iv 31.828 m long P.C Girder Kacowakora Bridgeat 62 th KM v 25.74 m long P.C Girder Gobrakura Bridgeat 66TH KM and vi 25.74 m long P.C Girder Telikhali Bridge at 74TH KM of Border Road Mymensingh Portion Z-2834 Under Mymensingh road division during the year 2019-2020 PW-16 |
2019-2020 |
Mymensingh Zone |
Mymensingh Division |
Revenue |
Not Available |
| 982 |
550857 |
Periodic Maintenance Programme Road - major for Widening of Existing Pavement with strengthening & DBS Wearing Course work from Ch 00000 Km to 11300 Km of Chagalnaiya-Muhurigonj Road Z-1032 Under Feni Road Division. |
2020-2021 |
Cumilla Zone |
Feni Division |
Revenue |
Not Available |
| 983 |
548905 |
Rehabilitation of Pavement by Double Bituminous Surface TreatmentDBST
DBS Wearing Caurse and Construction of Rigid Pavement work at Ch 9250 to
Ch 41000 of Fatulla Panchabati - Munshiganj Muktarpur - Lahajanj- Mawa
Road R- 812 under Munshiganj Road DivisionMunshiganj.PMP during the FY
2020 2021. |
2021-2022 |
Narayangonj Circle |
Narayanganj Division |
Revenue |
Not Available |
| 984 |
539470 |
Providing Strengthening & Dense Bituminous Surfacing Work Under Periodic
Maintenance Programme PMP Of Shariatpur-Janjira-KawrakandiKathalbari
Road R-863 at ch15330 to 15440 15720 to 25030 & construction of Rigid
Pavement Work at ch15440 to 15720 under Road Division Shariatpur during
the year 2020-2021. |
2020-2021 |
Gopalgonj Zone |
Shariatpur Division |
Revenue |
Not Available |
| 985 |
540351 |
Construction of U-Turn (Ch.0+000m to Ch.0+650m)
along with others ancillary works for community
communication at 68th km(p) of Dhaka(jatrabari)-
Mawa-Bhanga-Barisal-Patuakhali (n-8) National
highway under Madaripur Road Division, During the
Year 2020-2021. |
2020-2021 |
Gopalgonj Zone |
Madaripur Division |
Revenue |
Not Available |
| 986 |
530903 |
Construction of 22.68 m 1x21.34 Long RCC Girder Chowrapara Bridge at 46th Ch45304 KM on Godagari-Nachole-Niamatpur Z-6813 Road under Road Division Naogaon during the year 2019-2020. |
2019-2020 |
Rajshahi Circle |
Naogaon Division |
Revenue |
Not Available |
| 987 |
530899 |
Construction of 22.68 m 1x21.34 Long RCC Girder Niamatpur Bridge at 59th Ch58574 KM on Godagari-Nachole-Niamatpur Z-6813 Road under Road Division Naogaon during the year 2019-2020. |
2019-2020 |
Rajshahi Circle |
Naogaon Division |
Revenue |
Not Available |
| 988 |
521056 |
Extension of Existing PC Girder Bridge on both sides with 2 Span 2x1x36.58m & Bank revetment work of Kernal Bridge at 31st K.M Ch30362m on Ujanchar-Bajitpur-Austagram Road Z-3601 under Kishorgonj Road Division during year 2020-2021 |
2020-2021 |
Mymensingh Zone |
Kishoreganj Division |
Revenue |
Not Available |
| 989 |
521057 |
Extension of Existing PC Girder Bridge on both sides with 4 Span 2x2x30.488m & Bank revetment work of Bahadurpur Bridge at 33rd K.M Ch32689m on Ujanchar-Bajitpur-Austagram Road Z-3601 under Kishorgonj Road Division during year 2020-2021 |
2020-2021 |
Mymensingh Zone |
Kishoreganj Division |
Revenue |
Not Available |
| 990 |
526535 |
Widening Surfacing of existing pavement Construction of Rigid pavement & RCC UDrain from ch0000 to 3500 Km Octroy more to Noyagola more of Nawabganj-Uttermallick-Gomastapur Road Z-6806 under Nawabganj Road Division during the year 2020-2021. |
2020-2021 |
Rajshahi Circle |
Chapainawabganj Division |
Revenue |
Not Available |
| 991 |
500457 |
Periodic Maintenance Programme by Providing Aggregate Base Type-I DBS-Base Course and Wearing Course work at Ch. 69000m to Ch. 73000m of Mymensingh DC Office- Raghurampur- Netrakona-Mohangonj- Dharmapasha- Jamalgonj- Sunamgonj Netrakona Portion Road R-370 under Netrakona Road Division during the year 2020-2021 |
2020-2021 |
Mymensingh Circle |
Netrokona Division |
Revenue |
Not Available |
| 992 |
502889 |
Construction of 1 x 2.00 meter Clear Length 3.00 meter Clear Height RCC Box Culvert with U Type wing wall at Ch. 800m Tabujure 1 x 3.00 meter Clear Length 2.00 meter Clear Height RCC Box Culvert with U Type wing wall at Ch.1800m Chatarkhai of Shahbazpur-Daulatpur road Z-2816 2 nos 1 x 4.00 meter Clear Length 2.00 meter Clear Height RCC Box Culvert with U Type wing wall at Ch. 4100m Golsha & 4700m Taradharan of Barlekha-Shahbazpur-Latu road Z-2815 3 x 5.00 meter Clear Length 4.00 meter Clear Height RCC Box Culvert with U Type
wing wall at Ch.10200m Jora of Moulvibazar Rajnagar-Sylhet Balaganj road Z-2017 1 x 2.00 meter Clear Length 3.00 meter Clear Height RCC Box Culvert with U Type wing wall at Ch.2612m Ranimura 2 x 6.00 meter Clear Length 5.00 meter Clear Height RCC Box Culvert with U Type wing wall at Ch.10232m Boradahar of Juri - Fultola - Batuli road Z-2823 & 3 x 6.00 meter Clear Length 4.00 meter Clear Height RCC Box Culvert with U Type wing wall at Ch. 4526m Noyabazar of Juri - Lathitila road R-282 under Road Division Moulvibazar During the Year 2020-2021. |
2020-2021 |
Moulvibazar Circle |
Maulvibazar Division |
Revenue |
Not Available |
| 993 |
533579 |
Surfacing Work providing DBS-Wearing Course at different km. of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patuakhali Road (N- 8) under Barishal Road Division during the year 2020-2021. |
2020-2021 |
Barishal Zone |
Barishal Division |
Revenue |
Not Available |
| 994 |
510807 |
Periodic Maintenance Programme PMP-Bridge for Construction of 37.92 Meter 1 x 36.58m long Berajali PC Girder Bridge at 8th Km Ch.7758.73m on Jamalganj-Sunamganj Road R-370 under Sunamganj Road Division of Sylhet Road Circle during the year 2020-2021. |
2020-2021 |
Sylhet Circle |
Sunamganj Division |
Revenue |
Not Available |
| 995 |
496391 |
Construction of RCC Drain at Ch. 43000m to 43230m Wapda Point to Kodalipul Ch 45600m to 46500m Barohat to Jugidor Right Side Ch 45600m to Ch 46940m Barohat to Jugidor Left Side of Mirpur-Sreemongal- Moulvibazar-Sherpur N-207 Road. Ch 500m to 600m Raghunandanpur Both Side Ch 3350m to 3410m
Chowmuhuni Right Side of Moulvibazar Rajnagar-Fenchuganj-Sylhet N-208 & 300m to 700m Saiyarpur to Shah Mostafapur Both Side of Moulvibazar-Shamshernagar-Chatla Check Post Z-2002 under Road Division Moulvibazar during the year 2020-2021. |
2020-2021 |
Moulvibazar Circle |
Maulvibazar Division |
Revenue |
Not Available |
| 996 |
511115 |
Periodic Maintenance Programme for Re-construction of 2 vent 6.00m. Clear length x 6.00 m. Clear height RCC Box Culvert with U-Type wing wall at Ch.51544 of CumillaMainamati-BrahmanbariaSarail Road N-102 and Re-construction of 22.68 m. long RCC Bridge Aliabad Bridge at 28th Km. Ch.27950.20 m. of Companigonj-Nabinagar Road Z-1206 under Road Division Brahmanbaria during the year 2020-2021 |
2020-2021 |
Cumilla Circle |
Brahmanbaria Division |
Revenue |
Not Available |
| 997 |
505166 |
Construction of 6Six Nos. R.C.C Box Culvert as per attached design at 4th 5th 11th 16th & 17th Km. of Senbag-Begumgonj Gas Field-Sonaimuri Road Z-1446 by PMP Major-Bridge&Culvert under Noakhali Road Division during the year 2020-2021. |
2020-2021 |
Noakhali Circle |
Noakhali Division |
Revenue |
Not Available |
| 998 |
493958 |
Construction of RCC Rigid Pavement from Ch. 14800m to 16700m Chander Hasi Hospital to Chowdhury Bazar Under Periodic Maintenance Program on Shaistagonj-Habiganj-Nabigon-Sherpur Aushkandi R-240 Road under Road Division Habiganj of Moulvibazar Road Circle during the year 2020-2021. |
2020-2021 |
Moulvibazar Circle |
Habiganj Division |
Revenue |
Not Available |
| 999 |
493618 |
Strengthening of existing Pavement & Providing DBS Wearing Course from Ch. 0300 Km. to Ch. 6750 Km. 6450.00 M. Construction of Rigid Pavement from Ch. 0000 Km. to Ch. 0300 Km. 300.00 M. Temuhoni Bazar Portion of Feni-Temuhoni-Biroli Bazar-Gazirhat-Sonaimuri Road Z-1444 and Partial Strengthening of
existing Pavement & Providing DBS Wearing Course work from Ch. 0000 to 2750 of Feni Old Airport Road Z-1083 under Feni Road Division during the year 2020-2021. |
2020-2021 |
Noakhali Circle |
Feni Division |
Revenue |
Not Available |
| 1000 |
493403 |
Strengthening of existing pavement & Overlay work at 174thp to 178thp km Ch.173584 to 177260 of DhakaJatrabari-Mawa-Bhanga-Barishal-Patuakhali National Highway Road Jhalokati portion N-8 Through PMP under Jhalokati Road Division during the Year 2020-2021. |
2020-2021 |
Barisal Circle |
Jhalokati Division |
Revenue |
Not Available |