RTHD Banner

Total Tenders: 1522 · Showing 50 entries
SL e-GP Tender ID Tender Details Financial Year PE Office Division Budget Contractor
1051 605616 PMP-Road & Providing Strengthening, Dense Bituminous Surfacing (DBS), Protective work & Earth work under Periodic Maintenance Programme (PMP Major) at ch. 9+550 to 14+200, 14+300 to 15+800 & Construction of Rigid Pavement ch. 14+200 to 14+300 & 15+800 to 16+000 of Shariatpur (Burirhat)-Goshairhat Road (Z-8601) under Shariatpur Road Division, during the year 2021-2022. 2021-2022 Gopalgonj Zone Shariatpur Division Revenue Not Available
1052 604409 Periodic Maintenance Program (PMP) with Rigid Pavement at Ch. 22+470 Km to 22+670 Km (Aditmari Bazar), Ch. 22+800 Km to 23+040 Km (Aditmari Rail station) Ch. 47+630 Km to 47+830Km (Vullarhat Bazar), Ch. 56+600 Km to 56+950 Km (Parulia Bazar), Ch. 60+500 Km to 60+650 Km (Petrol pump Bazar), Ch. 72+200 to 72+800 Km (Borokhata Bazar), Ch. 79+400 Km to 79+800 Km (Boura Bazar) and strengthening work at Ch. 27+750 Km to Ch. 28+050Km, Ch, 29+000 Km to 30+000 Km and DBS-wearing Course at Ch. 23+000 to 28+400 Km (Tulun Bazar), Ch. 29+400 Km to 30+000 Km (Palashi Grave Yand) (Deduction 37 m) of Barabari-Lalmonirhat-Burimari National Highway (N-509) under Road Division, Lalmonirhat during the year 2021-2022. 2021-2022 Rangpur Zone Lalmonirhat Division Revenue Not Available
1053 599113 Construction of 31.828m (30.488m x 1) Long P.C. Girder Madrasha Bridge at 2nd Km. (Ch. 1+627m) of Lebukhali-Bauphal-Golachipa- Amragachia Road (Z-8806) Under Patuakhali Road Division during the year 2021-22 2021-2022 Patuakhali Circle Patuakhali Division Revenue Not Available
1054 601784 Periodic Maintenance work under PMP(Road-Major) providing DBST Work including Road Marking , Traffic Sign & Sign Post at Different Location ch.191+935(Sherpur Toll Plaza) to Ch. 192+251;Ch.192+379)to Ch. 192+697 ; Ch. 193+381 to Ch.193+566 ; Ch. 194+250 to Ch.194+475; Ch 194+587 to Ch.195+396 ; Ch 195+706 to Ch. 195+984; Ch. 197+832 to Ch.197+982 ; Ch, 198+108 to Ch. 198+313; Ch 198+433 to Ch, 198+763; Ch 198+880 to 199+034; Ch 199+760 to Ch, 200+526 ; Ch 201+046 to Ch 201+080; Ch 201+280 to Ch 201+383; Ch 201+606 to Ch 201+712,Ch 202+542 to Ch 203+651 , Ch 204+336 to Ch 205+516 , Ch 207+300 to Ch 207+743, Ch 207+763 to Ch, 208+163 , Ch 208+900 to Ch, 209+692, Ch 210+725 to Ch 210+815 , ch 210+870 to Ch 211+388 , Ch 211+800 to Ch 212+000 , Ch 212+000 to Ch 213+347, Ch 213+643 to Ch 214+145, Ch 215+564 to Ch 216+032, Ch 216+392 to Ch 216+854 , Ch 216+854 to Ch 218+468, Ch 221+460 to Ch 222+015 , Ch 222+080 to Ch 225+300,Ch 232+500 to Ch 233+000, ch 236+600 to Ch 237+300 , Ch 238+800 to Ch 239+586,Ch,240+383 to 241+000, Ch 259+797 to Ch 262+900, Ch 263+900 to Ch 264+980 , Ch 265+090 to Ch 265+180 , Ch 265+228 to Ch 267+052 (Highway Police Station), Ch 267+552 (Badrukha) to Ch 268+600(Puraton Ferighat) of Dhaka(katchpur)-Bhairab-Jagadishpur-Shaistaganj-Sylhet-Tamabil-Jaflong Road (N-2) under Road Division Sylhet of Road Zone, Sylhet during the year 2021-2022 2021-2022 Sylhet Zone Sylhet Division Revenue Not Available
1055 604273 Construction of Rigid Pavement at 5th km(p), 14th km(p), 21th km(p) and 23th km(p) and DBS Wearing course at 1st km(p), 2ndkm (p), 3rd km(p), 4th km (p), 21th km(p) & 22th km(p) of Rohonpur-Bholahat-BDR Camp Road(Z-6805) under RHD Road division, Nawabganj during the year 2021-2022. 2021-2022 Rajshahi Circle Chapainawabganj Division Revenue Not Available
1056 611326 DBS Wearing Course with Partial Strengthening and Rigid Pavement Work under Periodic Maintenance Programme (PMP) at 13th Km to 23rd Km (Ch.13+000 To 23+000 = 10000.00) of Eliotgong-Muradnagor-Ramchandrapur-Bancharampur (Z-1042) Road under Road Division, Cumilla during the year 2021-2022. 2021-2022 Cumilla Circle Cumilla Division Revenue Not Available
1057 608159 Periodic Maintenance Programme Providing Double Bituminous Surface Treatment (DBST), Aggregate Base type- l, DBS -Base Course and DBS- Wearing Course work from LRP Ch. 33+297 to Ch.44+924 Km of Itakhola -Mothkhola -Katiade Road (R-211) and DBS- Wearing Course from Ch.0+000 to Ch.3+570 Km of Battali (R-360)- Kishoreganj Road (R-364) Under Kishoreganj Road Division during the year 2021-2022. 2021-2022 Mymensingh Circle Kishoreganj Division Revenue Not Available
1058 599163 Periodic Maintenance Programme (PMP) Providing DBS-Wearing Course from Ch:97+062 km (Faltita) to Ch: 109+233 km (Noapara) of Bhanga-Bhatiapara-Mollahat-Fakirhat-Noapara Road (N-805) under Road Division, Bagerhat during the year 2021-2022. 2021-2022 Khulna Zone Bagerhat Division Revenue Not Available
1059 604276 Periodic Maintenance Program (PMP) for Construction of Hard Shoulder at 425th(P),426th(P), 427th(P), 428th(P), 429th(P), 430th(P), 431st(P), 432nd(P), 439th(P), 440th(P) Km of Dhaka ( Mirpur) -Utholi-Paturia- Natakhola-Kashinathpur- Bogra-Rangpur-Beldanga-Banglabandha (N-5) Road under Road Division, Thakurgaon during the year 2021-2022. 2021-2022 Rangpur Zone Thakurgaon Division Revenue Not Available
1060 604309 Periodic Maintenance Program (PMP) for Construction of Rigid Pavement at 364th(P) (Ch.363+200 to 363+500m = 300.00m) Km of Dhaka (Mirpur) -Utholi-Paturia- Natakhola-Kashinathpur- Bogra-Rangpur- Beldanga- Banglabandha (N-5) and Strengthening and overlay by DBS-Wearing Course of existing pavement, Sign signal, Km post installation & Road marking work from Ch. 8+077m to 17+087m of Jharbari (Bigonj)-Joygonj-Bhabangonj-Nilphamari (Police Line)-Pachmatha-Panchapukur-Kishoregonj (Sadurarpool) Road (Z-5027) under Road Division,Nilphamari during the year 2021-2022. 2021-2022 Rangpur Zone Nilphamari Division Revenue Not Available
1061 585578 Pavement Widening, Strengthening, Earthwork, Protective work, R.C.C Box Culvert Construction, Drain construction, Road Marking, Sign-Signal etc work at 8th(P) km to 17th(P) km (Ch.07+000 to 16+885) under Raising of Road Embankment with Pavement Reconstruction & Widening at Singra portion of Singra-Gurudaspur-Chatmohor (Z-5209) Road Project under Road Division, Natore during the year 2020-2021. (WP-2) 2020-2021 Rajshahi Zone Natore Division Development Not Available
1062 584998 Improvement of Sirajganj-Kazipur-Dhunat-Sherpur road (Z-5401) at Ch.00+000 to 4+000 km by Widening and Strengthening of pavement (5.50 m to 21.80 m), DBS Surfacing (2x9.40 m), Development of intersection, Construction of,Bridge, RCC Box Culverts ,Concrete slope protection, Construction of RCC U-Drain, Cross Drain, Saucer drain, Bus-Bay, Brick masonry toe wall, Widening of road embankment (Earth work), Grass Turfing, General & Site Facilities, Sign, Signal, Km post, Road marking etc. under Road Division Sirajganj during the year 2019-2020 (WP-01). 2021-2022 Rajshahi Zone Sirajgonj Division Development Not Available
1063 606870 Surfacing works under Periodic Maintenance Programme (PMP) (Roads-Major)Providing by Aggregate Base Type-I, DBS-Base Course, DBS-Wearing Course & Rigid Pavement work at Ch: 1st (p), 2nd (P), 3rd (P), 5th (P), 7th (P), 8th (P), 9th (P), 10th, 11th, 12th,13th and 14th (P) km of Bogura Town 2nd Bypass Road (N-515) under Road Division Bogura during the year 2021-2022. 2021-2022 Rangpur Zone Bogura Division Revenue Not Available
1064 600403 Periodic Maintenance Programme (PMP) providing DBS-Base course and DBS-Wearing course including necessary repair works from Ch. 224+315m to Ch. 225+815m (Shambagat to Metro Brick), Ch. 234+000m to Ch. 235+785m (Bimanbondor to Foyal Bazar End), Ch. 239+315m to Ch. 240+000m (Chairman Bari More Start to Chairman Bari More End) and Ch. 241+268m to Ch. 243+165m (Bogura Baidge Approach to Belai Bridge Approach) (Total Working Length =5867.00m) of Daulatdia-Faridpur(Goalchamot)-Magura-Jhenaidah-Jessore-Khulna-Mongla (Digraj) Road (N-7) National Highways under Road Division, Bagerhat during the year 2021-2022. 2021-2022 Khulna Circle Bagerhat Division Revenue Not Available
1065 609208 PMP work for Strengthening, Surfacing by DBS, sign- signal and Road marking at different KM of Sonapur -Kabirhat -Companigonj(Bashurhat) - Dhagoanbhuiyan Road ( R-148) Under Noakhali Road Division during the year 2021-2022. 2021-2022 Noakhali Circle Noakhali Division Revenue Not Available
1066 603003 Construction of 34.88m Long P.C Girder Bridge at 7th (Ch.6+712.04m Fakirhat Bridge) Km of Tazumuddin-Kunjerhat Road (Z-8943) under Road Division Bhola during the year 2021-22. 2021-2022 Barisal Circle Bhola Division Revenue Not Available
1067 607867 Periodic Maintenance Program (PMP) of the damaged road pavement by providing Surfacing work of DBS-Wearing Course, Earth work, Protective work in Kachua By Pass - Akania More Road (Z-1442 ) from Chainage: 0+000 to 2+400 & Kaliapara-Kachua Road (Z-1050) from Ch: 0+000 to 13+305 under Road Division Chandpur during the year 2021- 2022. 2021-2022 Cumilla Circle Chandpur Division Revenue Not Available
1068 601986 Periodic Maintenance Program (PMP) with DBST work including repairing & earth work at Ch. 18+600 to 35+000 Km of Mithapukur-Shahebganj-Madhyapara-Phulbari (R-556) (Dinajpur part) Road, at Ch. 0+000 to 4+440 Km of Moheshpur-Barapukuria (R-558) Dinajpur-Road, at Ch. 1+182 to 9+932 Km of Phulbari-Parbatipur (Z-5857) Road, at Ch. 0+000 to 2+950 Km of Parbotipur By-Pass (Z-5026) Road & Ch. 4+345 to 12+700 Km of Saidpur-Parbatipur Road (Z-5011) (Dinajpur Part) under Road Division, Dinajpur, during the year 2021-2022. 2021-2022 Rangpur Zone Dinajpur Division Revenue Not Available
1069 606853 Repair of Pavement and surfacing by DBS Wearing Course at Chainage 37+410 to 48+000 Km of Chattogram-Rangamati National Highway (N 106) under Road Division Rangamati during the Year 2021-2022. 2021-2022 Rangamati Circle Rangamati Division Revenue Not Available
1070 606850 Repair of Damaged Pavement and surfacing by DBS Wearing Course at 59 th(p)KM,60th(P) KM ,61th(p) KM,62th(P ) KM ,63th(P) KM ,64th(P) KM ,65th(P) KM ,66th(P) KM ,67th(P) KM ,68th(P) KM .69th(P)KM ,70th(P) KM ,71th(P) KM ,72th(P) KM ,73th(P) KM ,74th(P) KM ,75th(P) KM ,76th(P) KM ,77th(P) KM ,78th(P) KM ,79th(P)KM ,80 th(P)KM ,81th(P)KM ,82th(P)KM ,83th(P)KM ,84th(P)KM ,85th(P)KM ,86th(P)KM ,87th(P)KM ,88th(P) KM ,89th(p) KM and 90th(p) KM of Hathazari-Fatikchari-Matiranga-Khagrachari Road (R-160) under Khagrachari Road Division during The Year 2021-2022. 2021-2022 Rangamati Circle Khagrachari Division Revenue Not Available
1071 613747 Providing DBS-Base Couse and DBSâ??Wearing Course including Strengthening by Aggregate Base Type-I from Ch. 0+000 to 1+400, 4+000 to 5+300 and 12+000 to 12+800 Total Length=3500.00m of Jashore (Daratana More)-Magura (Vaina More) National Highway (N-702) and Widening & Strengthening of Existing Pavement including Earth Work, Sign Signal, KM Post, Guide Post, Road Marking work of Vaina More-Mirpara More Zilla Road (Z-7010) under Periodic Maintenance Programme PMP (Major-Roads) under Road Division, Jashore & Magura during the FY 2021-2022. 2021-2022 Jeshore Circle Jessore Division Revenue Not Available
1072 604411 (a) Scarify, Partial Strengthening with DBS Base Course and DBS Wearing Course work at Ch. 0+980 to 1+500 (Chanpara), Ch. 2+750 to 5+200 (Chorkajura), Ch. 6+840 to 6+930 (Vatoi), Ch. 7+700 to 7+800 (Ahsannagar), Ch. 12+200 to 13+050 (Garagonj), Ch. 13+354 to 14+000 (Garagonj Bazar), and Ch. 21+230 to 21+515 (Shekpara to EB Gate) of Jhenaidah-Kushtia-Pakshi Feri-Dasuria Road (N-704) under Jhenaidah Road Division. (b) Repair of Existing Pavement with Double Bituminous Surface Treatment (DBST) from Ch. 0+000 (Bottoli) to 6+600 (Trimohoni) of Kushtia Town By-Pass Road (N-713) under Kushtia Road Division. (c) Strengthening by Aggregate Base Type-II and DBS Wearing Course from Ch.0+000 to Ch. 5+100 (Nayanipara to Jululi) of Nayanipara-Joluli-Jadabpur-Gopalpur Road (Z- 7488) under Jhenaidah Road Division. 2021-2022 Khulna Zone Jhenaidah Division Revenue Not Available
1073 607632 PMP-Road & Estimate for PMP (Roads) Programme providing Dense Bituminous Surfacing-Wearing Course from Ch. 0+553(Bhanga Intersection) to 3+154 km, 4+360 to 4+430 km, 9+496 to 10+941 km, 12+539 to 19+554 km, 20+383 to 20+496 km, 21+740 to 21+850 km & 22+420 to 24+634 km (Kafura, Munsibazar) of Bhanga- Faridpur Road (N-804) under Road Division, Faridpur during the year 2021-2022. 2021-2022 Gopalgonj Zone Faridpur Division Revenue Not Available
1074 607495 Pavement widening by flexible pavement & rigid pavement with Road divider at zero point of Bangladesh chainage 526th(P) Km to 527th(P) Km of Dhaka (Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha (N-5) Road under Road Division, Panchagarh during the year 2021-2022 2021-2022 Dinajpur Circle Panchagarh Division Revenue Not Available
1075 599117 Overlay work of DBS Wearing Course including Road Marking at Ch. 0+000 (Udaypur ) to Ch. 2+589 (Hakimuddin Bazar) of Borhanuddin (Udaipur)-Tazumauddin-Manpura-Sikdarhat Road (Z-8905) & Agreegate Base type-1 with DBS Wearing Course including Road Marking at Ch. 11+500 (Chowkigata More) to Ch. 15+660 (Daulatkhan Bazar) of Bagmara-Banglabazar-Daulatkhan Zilla Road (Z-8915) under Bhola Road Division during the year 2021-2022 2021-2022 Barisal Circle Bhola Division Revenue Not Available
1076 603043 Periodic Maintenance work (PMP Major) by HBB work with Base Type-II from Ch.00+000m to 03+000m of Bhatiapara-Kalna-Lohagara-Narail-Jessore (N-806) Road under Gopalgonj Road Division during the financial year 2021-2022. 2021-2022 Gopalgonj Circle Gopalganj Division Revenue Not Available
1077 601815 Rehabilitation work by overly with 40mm DBS wearing course including slope protection, Road marking, Sign Signal & Kilometer- Post at Ch.32+500 (Aynabaj Kalaiya) to 47+000 (Kapula Kachare) of Lebukhali-Bauphal-Golachipa-Amragachia Road (Z-8806) Under Patuakhali Road Division During the year 2021-22. 2021-2022 Patuakhali Circle Patuakhali Division Revenue Not Available
1078 606899 Periodic Mointenonce Program (PMP) of Sonohat Landport-Madarganj-Bhitorbandh-Nageshwoai Road (Z-5624) through Strengthening with Aggregate BaseType-1, Surfacing (DBS Wearing Course- 40mm)and Earth work from Ch. 0+150 (BDR Camp Moor) to 11+000 (Subolpar) under Kurigram Road Division during the year 2021-2022. 2021-2022 Rangpur Circle Kurigram Division Revenue Not Available
1079 555702 Improvement of Sirajganj Bagbati-Dhunot Sonamukhi Road Z-5405 at Ch. 10750 to 21500 km by Construction of new Flexible Pavement Widening and Strengthening of pavement 3.70 m to 5.50 m DBS Surfacing 1x5.50 m Construction of RCC Box Culvert Concrete slope protection Construction of RCC U-Drain Cross Drain Saucer drain Toe wall Widening of road embankment Earth work Grass Turfing General & Site Facilities Sign Signal Km post Road marking etc. under Road Division Sirajganj during the year 2020-2021. WP-07 2020-2021 Rajshahi Zone Sirajgonj Division Development Not Available
1080 603171 Periodic Maintenance works under PMP-Major (Road) providing Aggregate base Type-1, DBS-Base course and DBST at Ch. 0+000 to 16+500 Km of Ullapara-Bellkuchi Road (Z-5058) under Sirajganj Road Division during the year 2021-2022. 2021-2022 Rajshahi Zone Sirajgonj Division Revenue Not Available
1081 601855 Periodic Maintenance works under PMP-Major (Road) at Ch. 100+040 to 127+500 of Dhaka(Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandh Road (N-5) and Ch. 0+000 to 2+310 of Baderhat-Kazirhat (Latifpur) Road (N-505) under Pabna Road Division during the year 2021-2022. 2021-2022 Rajshahi Zone Pabna Division Revenue Not Available
1082 604469 Periodic Maintenance works under PMP-Major(Road) providing Aggregate Base Type-I, DBS Wearing Course and Rigid Pavement from Ch. 7+880 to Ch. 18+720 km of Bonpara-Gopalpur-Lalpur Road (Z 6014) under Natore Road Division during the year 2021-2022. 2021-2022 Rajshahi Zone Natore Division Revenue Not Available
1083 600947 Surfacing work with DBS-Base Course, DBS-Wearing Course, necessary repair, Earthwork & Protective work at different location of Gariarpar-Banaripara-Sawrupkati-Kawkhali-Naikati Road (Z-8033) & Barishal (Dinarerpool)-Laxmipasha-Dumki Road (Z-8044) under Barishal Road Division during the year 2021-2022. 2021-2022 Barisal Circle Barishal Division Revenue Not Available
1084 599137 Slope Protection of Road Against Wave Action of Meghna River from Km 7+000 to Km 7+310 = 310 m (Betua Lunchghat) of Charfession-Betua Zilla Highway (Z-8909) Under Road Division, Bhola during the year 2021-2022 2021-2022 Barisal Circle Bhola Division Revenue Not Available
1085 603216 Periodic Maintenace Program (PMP) of Ulipur-Nazimkhan-Razarhat(Khedabag) Road (Z-5618) through Strengthening with Aggregate Base Type-I and Surfacing (DBS Wearing course- 40mm) from Ch. 7+000(Bosher Bazar) to 18+100 (Razarhat) under Kurigram Road Division during the year 2021-2022. 2021-2022 Rangpur Circle Kurigram Division Revenue Not Available
1086 606039 Periodic Maintenance Program (PMP) of Strengthening & surfacing work at Ch. 15+600 to 20+610 Km of Rangpur-Barobari-Kurigram (N-506) Road under Road Division, Rangpur during the year 2021-2022. 2021-2022 Rangpur Circle Rangpur Division Revenue Not Available
1087 615600 Periodic Maintenance of Narail (Tularampur)-Maijpara Road (Z-7504) with Strengthening, Dense Bituminous Surfacing-DBS Wearing Course work, Earth Work, Road Marking, Traffic Sign, Sign Post & Protective work (R.C.C Palisiding) from Ch. 0+000m to 07+150m under Road Division, Narail during the year 2021-2022. 2021-2022 Jeshore Circle Narail Division Revenue Not Available
1088 600404 Overlay works (DBSW) under periodic Maintenance Programme (PMP) of Navaron-Illisopur-Satkhira Road (R-765) (Satkhira Part)at Chainage : 16+877m to 17+377m and Ch: 31+500m to 33+000m (Jhaudanga) under Road Division, Satkhira During the year 2021-2022. 2021-2022 Khulna Circle Satkhira Division Revenue Not Available
1089 591434 Development WP-01 & Widening, Strengthening, Raising, Straightening of existing roads and Construction of Hard Shoulder, Bus-Bays, Intersections, Re-construction, New-construction and extension of culverts, earth work, Protective work, drainage work and Miscellaneous Item work of Shariatpur-Janjira-Nawdoba (Padma Bridge Approach) Road (R-863) From Ch. 0+000 to 11+500 & Monohar More to Shariatpur (Premtola) Road (R-861) Ch. 4+839 to6+903 under Shariatpur Road Division, during the year 2020-2021 (WP-01). 2020-2021 Gopalgonj Zone Shariatpur Division Development Not Available
1090 565808 Estimate for Rigid Pavement and Toe Wall (PMP) at Pakuria Bazar, Jahanarabadh,Kutibari & Madarigonj of Mohonpur-Bagmara -Bhobanigonj Road (Z-6853) under RHD Road Division Rajshahi during the year 2020-2021. 2020-2021 Rajshahi Circle Rajshahi Division Revenue Not Available
1091 562042 Construction of hard shoulder at ch. 455thp Km to 457thp Km and ch. 459th p Km to 460th p Km of DhakaMirpur-Utholi-Paturia-Notakhola-Bogra-Rangpur-Beldanga-Banglabandha N5 Road under Road Division Panchagarh during the year 2020-2021 2020-2021 Dinajpur Circle Panchagarh Division Revenue Not Available
1092 539154 providing Widening of Pavement from Ch. 39+000m to 44+630m, Strengthening the Existing Pavement with Surfacing by DBS-Base Course, DBS-Wearing Course, 1(One) Nos RCC Box Culvert & Providing Sign-Signal, km post, Guide post, Protective Works at different Km of Tekerhat-Gopalgonj(Horidaspur)-Mollahhat(Gonapara) Road (Road No.R-850) under Road Division, Gopalgong during the year 2020-2021. (Package No.PW-06) 2020-2021 Gopalgonj Circle Gopalganj Division Development Not Available
1093 568073 Construction of 50.120 m (1x 48.78m) Long P.C. Girder Bridge(Hanshama Bridge) at 8th KM ch:07 KM +138.50m) of Bandarban-Rowangchari-Ruma Road (Z-1813) under Bandarban Road Division during the Year 2020-2021. 2020-2021 Rangamati Circle Bandarban Division Revenue Not Available
1094 539152 providing New Construction from Ch.32850m to Ch. 33300m Ch. 37680m to 37760 Widening of Pavement from Ch. 32000m to 32850m Ch. 33300m to 37680m & Ch. 37760m to 39000m Strengthening the Existing Pavement with Surfacing by DBS-Base Course DBS-Wearing Course & Providing Sign-Signal Km post Guide post Protective Works at different Km of Tekerhat-GopalgonjHoridaspur-MollahhatGonapara Road Road No.R-850 under Road Division Gopalgong during the year 2020-2021. 2020-2021 Gopalgonj Circle Gopalganj Division Development Not Available
1095 539146 providing New Construction from Ch.18+720m to Ch. 18+900m & Ch.21+650m to Ch.22+150m, Widening of Pavement from Ch. 16+000m to 16+175m, Ch. 16+375m to 18+720m, Ch. 18+900m to 21+650m & Ch. 22+150m to 24+000m, Rigid Pavement from Ch.16+175m to 16+375m, Strengthening the Existing Pavement with Surfacing by DBS-Base Course, DBS-Wearing Course, 2(Two) Nos RCC Box Culvert & Providing Sign-Signal, Km post, Guide post, Protective Works at different Km of Tekerhat-Gopalgonj(Horidaspur)-Mollahhat(Gonapara) Road (Road No.R-850) under Road Division, Gopalgong during the year 2020-2021. (Package No.PW-03) 2020-2021 Gopalgonj Circle Gopalganj Division Development Not Available
1096 539144 providing New Construction from Ch.10+200m to Ch. 10+300m, Ch.12+375m to Ch. 12+525m & Ch.13+080m to Ch.13+400m, Widening of Pavement from Ch. 8+000m to 10+200m, Ch. 10+300m to 12+375m, Ch. 12+525m to 13+080m & Ch. 13+400m to 16+000m Strengthening the Existing Pavement with Surfacing by DBS-Base Course, DBS-Wearing Course, 3(Three) Nos RCC Box Culvert & Providing Sign-Signal, Km post, Guide post, Protective Works at different Km of Tekerhat-Gopalgonj(Horidaspur)-Mollahhat(Gonapara) Road (Road No.R-850) under Road Division, Gopalgong during the year 2020-2021. (Package No.PW-02) 2020-2021 Gopalgonj Circle Gopalganj Division Development Not Available
1097 539148 Providing New Construction from Ch.26030m to Ch. 26230m Ch. 26280m to 26380m & Ch. 27950 to 28100m Widening of Pavement from Ch. 24000m to 26030m Ch. 26230m to 26280m Ch. 26380m to 27700 & Ch. 28100m to 32000m Rigid Pavement from Ch.27700m to 27950m Strengthening the Existing Pavement with Surfacing by DBS-Base Course DBS-Wearing Course 1One Nos RCC Box Culvert & Providing Sign-Signal km post Guide post Protective Works at different Km of Tekerhat-GopalgonjHoridaspur-MollahhatGonapara Road Road No.R-850 under Road Division Gopalgong during the year 2020-2021. Package No.PW-04 2020-2021 Gopalgonj Circle Gopalganj Division Development Not Available
1098 539111 Providing New Construction from Ch.1300m to Ch. 1480m Ch.5350m to Ch. 5600m & Ch.6420m to Ch.6720m Widening of Pavement from Ch. 0400m to 1300m Ch. 1480m to 5350m Ch. 5600m to 6270m & Ch. 6720m to 8000m Rigid Pavement from Ch.0000m to 0400m & Ch.6270m to 6420m Strengthening the Existing Pavement with Surfacing by DBS-Base Course DBS-Wearing Course 3Three Nos RCC Box Culvert & Providing Sign-Signal Km post Guide post Protective Works at different Km of Tekerhat-GopalgonjHoridaspur-MollahhatGonapara Road Road No.R-850 under Road Division Gopalgong during the year 2020-2021. Package No.PW-01 2020-2021 Gopalgonj Circle Gopalganj Division Development Not Available
1099 523770 Periodic Maintenance Programme Bridge/Culvert for Construction of 94.274m 3x30.488 long P.C Girder Boyrela Bridge at 26th Km Ch. 25796m of Netrokona-Madon-Khaliajuri Road Z-3701 under Netrokona Road Division during the year 2020-2021 2020-2021 Mymensingh Circle Netrokona Division Revenue Not Available
1100 560793 Periodic Maintenance Programme PMP providing strengthening by Aggregate Base Type-I repairing by Sub-base and surfacing by DBS work & protective work at Ch.18200 to 25410 Km. of Cumilla-Salda-Koshba Sayadabad Road N-114 under Road Division Cumilla during the year 2020-2021. 2020-2021 Cumilla Circle Cumilla Division Revenue Not Available