Repair of potholes and Seal Coat work at 1stkm(p),2nd km(p),3rdKm(p),4thKm(p),9thKm(p),10thKm(p) & 12thkm(p)of Kapasia-Papur-Fuldi-Kaligonj Road (Z-3025) under Gazipur Road Division during the year 2025-2026.
Repairing of the Existing Damaged Road Pavement by Providing Premix Bituminous Carpeting & Seal Coat Work at 22nd km (p), 23rd km of Chandpur(Nanupur)-Chandra-Kamtabazar-Ramganj Road (Z-1412) Road under Road Division,Chandpur during the year 2025-2026.
Repairing of the Existing Damaged Road Pavement by Providing Premix Bituminous Carpeting (Profile Correction) & Seal Coat Work at 7th km (P) & 8th km (P) of Chandpur(Nanupur)-Chandra-Kamtabazar-Ramganj Road (Z-1412) Road under Road Division,Chandpur during the year 2025-2026.
Supplying of Asphalt Materials for Departmental Routine Maintenance Work of Different Roads in Road Sub-Division Chandpur under Road Division Chandpur during the year 2025-2026..
Supplying, fitting, fixing & installation of Cable & Street Light at 39th (p) km of Dhaka (Jatrabari)-Cumilla (Mainamati)-Chattagram-Teknaf Road (N-1) under Narayanganj Road Division during the FY 2025-2026
Carpeting & Seal Coat work with necessary repairing by potholes and Aggregate Base Type-I at Ch. 6th km (p), 7th km (p), 8th km (p), 10th km (p), 12th km (p), 14th km (p) & 15th km (p) of Nayapur (Bostrol)-Araihazar-Narshingdi-Raypura road (R-114) under Narayanganj Road Division during the year 2025-2026
Plantation of Ornamental Seasonal Plant with Soil, Cow-Dung, Fertilizer at Cox's Bazar Road Division Office Compound, Road Sub-Division-1 & Kolatoly Sagor Bilash (RHD Rest House) under Cox's Bazar Road Division during the year 2025-2026
Supplying of Stone Chips, Bricks, Local Sand, Fire Wood, Gunny Bag & Geo Bag for use in Road Maintenance work at different roads at Cox`s Bazar Road Sub-Division-2 Stack Yard under Cox`s Bazar Road Division during the year 2025-2026.
Repair of Damaged Pavement by Aggregate Base Type-II, Carpeting, Repair Seal Coat, Brick Flat Soling, HBB Pavement Work at 1st(P), 2nd(P) 3rd(P), 4th(P) & 5th(P) & Construction of 1.5mx1.5m RCC Cross Drain, Protective work by Bullah Palisiding at 31th(P) KM of Dulahazra- Garzania- Kossopia- Baisari Road (Z-1130) under Cox's Bazar Road Division during the Year 2025-2026.
32/e-GP/2025-2026/JRD Repairing and Painting the Residence of Executive Engineer, RHD, Jhalakathi Under Jhalakathi Road Division during the year 2025-2026.
Installation of Warning-Mandatory and Informative Sign with Post, Chevron with Sign Post. Road Marking.Concrete Guide Post at Different Chainage from 1st Km (Keranihat) to 19th Km (Gunagori) Keranihat- Satkania- Gunagori Road (Z-1019) Under Chatttogram South Road Division During the year of 2025-2026.
eGP-77/EE/SRD/Syl/2025-26 Repair of Existing Pavement by Uni-Block Work at different Location of Shahbazpur-Daulatpur Road (Z 2816) under Road Division, Sylhet during the year 2025-2026
Supplying and Laying Asphalt Materials for Repair of Surface Depression at Ch. 42+900 to Ch. 43+500, Ch. 43+900 to Ch. 44+100 & Ch. 44+270 to Ch. 44+500 of Ahaladipur-Rajbari-Pangsha-kumarkhali-Kushtia (R-710) Road under Road Division, Rajbari during the year 2025-2026.
Supplying and Laying Asphalt Materials for Repair of Surface Depression at Ch. 10+000 to Ch 10+400, Ch. 10+600 to Ch. 11+000 & Ch. 11+280 to Ch. 11+500 of Ahaladipur-Rajbari-Pangsha-kumarkhali-Kushtia (R-710) Road under Road Division, Rajbari during the year 2025-2026.
Repair works of Propulsion Unit (SL. No: 200:102H) and Gear box (SL. No: 20007434) for 200 HP Cummins Engines reserved at Divisional workshop under RHD ferry sub-division, Barisal during the financial year 2025-2026.
Repair of the pontoon no P.I.-159/2004 at Daser hat Ferry Ghat under RHD, Ferry Sub- Division, Barishal during the financial year 2025-2026.
Repair works of 200 HP Cummins Engine's fuel pump (SL. No: Q09126307) , 200 HP Dossan Engine's fuel pump (SL. No: 105A0047), 190 K.W MAN Engine's fuel pump (SL. No: 0.4020487702-7663) & 315 HP MAN Engine's fuel pump (SL. No: 11103-7074) reserved at Divisional workshop under RHD ferry sub-division, Barisal during the financial year 2025-2026.
Repair of damaged portion of deck and Body including painting of ferry no UT-2(Imp)-40/99 at Banaripara Ferry ghat under RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Repair works of Both Side Gear box & Other Necessary works for 175 HP Cummins Engines of ferry no UT-2(Imp)-41/2000 at Nehalgonj Ferry ghat under RHD ferry sub-division, Barisal during the financial year 2025-2026.
Overhauling works of 190 K.W MAN Engine (Engine No: 39091300434301) reserved at workshop under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Repair works of Propulsion Unit (SL. No: 175/109H) and Gear box (SL. No: 20084990) for 200 HP Cummins Engines reserved at Divisional workshop under RHD ferry sub-division, Barisal during the financial year 2025-2026.
Repair works of Propulsion Unit (SL. No: 150226H) and Gear box (SL. No: 20086484) for 200 HP Cummins Engines reserved at Divisional workshop under RHD ferry sub-division, Barisal during the financial year 2025-2026.
Repair of Passenger shade, Engine shade, damaged portion & Ferryâ??s Body including painting of ferry no UT-1-077/2020 at Hizla-Mehendigonj ferry ghat under RHD Ferry Sub-Division, Barishal, during the financial year 2025-2026.
Repair of Passenger shade, Engine shade, damaged portion & Ferryâ??s Body including painting of ferry no UT-1-057/2020 at Mirgonj ferry ghat under RHD Ferry Sub-Division, Barishal, during the financial year 2025-2026.
Supply of M.S Plate (9mm), M.S Pipe, M.S Angle & M.S Pulley for repairing different Pontoon and Gangways under, RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Overhauling works of 200 HP Cummins Engine (Engine block No: 50) reserved at workshop under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Overhauling works of 200 HP Cummins Engine of ferry no UT-2(imp)-071/2005 (Right side) at Nehalgonj ferry ghat under RHD, ferry Sub- Division, Barishal during the financial year 2025-2026.
Overhauling and other repair works of 315 HP MAN Engine ((Engine No: 37093391914301) reserved at workshop under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Overhauling works of 315 HP MAN Engine of Ferry no UT-1-033/04 (Right side) at Swrupkathi Ferry ghat under, RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Fuel pump plunger, Injector nozzle and other Spare Parts for 324 HP Doosan Engines & 375 HP Doosan Engines Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of M.S Plate (4mm), M.S Pipe & Welding Electrode for repairing of different ferry under RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Ring-Piston, Bearing-Main, Gasket & other spare parts for 375 H.P. CATTERPILLAR (catterpillar-C9.3) Engines under RHD, ferry sub-division, Barishal during the financial year 2025-2026.
Supply of M.S Plate (6mm) & Welding Electrode for different ferry & pontoon under RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Fuel pump plunger & Remote Control Spare Parts for 315 HP MAN Engines Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Delivery valve, Injector nozzle and other Spare Parts for 200 HP Cummins Engines Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Fuel pump plunger, Clutch pack repair kit and other Spare Parts for 200 HP Doosan Engines Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Remote Control and Electrical Spare Parts for 200 HP Doosan Engines Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of filter Element for 375 H.P. MAN ZF (MANâ??D2676LE441) Engines under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of filters for 190 KW MAN & 315 HP MAN Engines under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply, fitting & Calibration works of UR Unit XENTA (Star board side)/Busber (Right side) for 375 HP catterpiller (c-9.3) Engine of Ferry no UT-1-84/2020 at Sriramkathi Ferry ghat under, RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply, fitting & Calibration works of UR Unit XENTA (Star board side)/Busber (Right side) for 375 HP catterpiller (c-9.3) Engine of Ferry no UT-1-58/2020 at Amrajhuri Ferry ghat under, RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply, fitting & Calibration works of Throttle Lever for 375 HP catterpiller (c-9.3) Engine of Ferry no UT-1-67/2020 at Amrajhuri Ferry ghat under, RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Repair of damaged portion Ferryâ??s Body including painting of ferry no UT-1-063/2020 at Chorkhali ferry ghat under RHD Ferry Sub-Division, Barishal, during the financial year 2025-2026.
Supply, fitting & Calibration works of Azimuthal Sensor/Rotational Sensor (both side) for 375 HP catterpiller (c-9.3) Engine of Ferry no UT-1-86/2020 at Bora Machua Ferry ghat under, RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Morse Control & Cross bearing for 375 HP Doosan Engine Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Fitting and Calibration work of Rudder Angle Sender, Oparatin Switch & other Spear parts for 400 HP Doosan Engines of Ferry no UT-1-012/1984 at Hizla-Mehendiganj Ferry ghat under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Fitting fixing work of Radiator core & other accessory for 324 HP Doosan Engine of Ferry no UT-1-18/2000 (both side) at Sonakur Ferry ghat under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Fitting fixing work of Radiator core & other accessory for 375 HP Doosan Engine of Ferry no UT-1-76/2020 (both side) at Chorkhali Ferry ghat under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Electrical Spare Parts for 375 HP Doosan Engines Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of Engine Spare Parts for 375 HP Doosan Engines Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Fitting & Calibration work of Remote control system Spare Parts for 315 HP MAN Engine (both side) of ferry no UT-1-33/04 at Swrupkathi ferry ghat Under RHD, ferry Sub-Division, Barishal during the financial year 2025-2026.
Supply of M.S Aike & M.S Pin repairing for differents Pontoon & Gangway under RHD, Ferry Sub-Division, Barishal during the financial year 2025-26.
Supply of Different types filter for 375 H.P. CATTERPILLAR (catterpillar-C9.3) Engines under RHD, ferry sub- division, Barisal during the financial year 2025-2026.
Repair works of the pontoon no PI-277/2019 at Mirgonj Ferry Ghat under RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Repair works of Propulsion Unit (SL. No: 499503200404), Gear box and Hydraulic System for 315 HP MAN Engines reserved at Divisional workshop under RHD ferry sub-division, Barisal during the financial year 2025-2026.
Repair works of Propulsion Unit (SL. No: 33U1.3.04.01.01.06) and Gear box for 315 HP MAN Engines reserved at Divisional workshop under RHD ferry sub-division, Barisal during the financial year 2025-2026
Supply, fitting & Calibration works of UR Unit XENTA (Star board side)/Busber (Right side) for 375 HP catterpiller (c-9.3) Engine of Ferry no UT-1-86/2020 at Bora-Machua Ferry ghat under, RHD, Ferry Sub-Division, Barishal during the financial year 2025-2026.
Repair works of suspension system, brake system, Denting painting and other repair works for Maintenance vehicle Mitsubishi pickup no Dhaka metro tha-11-1907 (model: L-200 4D56) under RHD, ferry sub division, Barishal during the financial year 2025-2026.
Engine overhauling and other repair works of JM Roller-05(Romiti) under RHD, ferry Sub-Division Barishal during the financial year 2025-2026.
Repair work of brake system, clutch system & other repair works of Kobelco Crane (6D14) under RHD, ferry Sub-Division Barishal during the financial year 2025-2026.
Engine overhauling and other repair works of China Roller under RHD, ferry Sub-Division Barishal during the financial year 2025-2026.
Repair works of Motor Grader under RHD, ferry Sub-Division Barishal during the financial year 2025-2026.
Repair works of Parkins welding Generator-01 under RHD, ferry Sub-Division Barishal during the financial year 2025-2026.
Repair works of Parkins welding Generator-03 under RHD, ferry Sub-Division Barishal during the financial year 2025-2026.
Construction of Munigonj Bridge Toll Plaza (Partial) at 4th km of Bagerhat-Chitolmary-Tungipara(Patgati) Road (R-774) under Road Division, Bagerhat during the year 2025-2026.
Supply of Materials for Routine Maintanance work of Different Road of Road Sub-Division-2 under Bandarban Road Division during the year 2025-2026.(P-2)
Estimate for construction of Semi pacca Tin Shed Building at old Division Office-Compound area under Road Division Bandarban during the year 2025-2026.
Estimate for Renovating and interior work at Girinibas Inspection Banglow, Bandarban & Chimbuk under Bandarban Road Division during the year 2025-2026.
Repair of RHD Quality Control Laboratory, Rangamati under the Rangamati Road Circle and a police box installation to ensure the security of the RHD Lake View Garden and other public facilities, at 65th Km of Chittagong-Hathazari-Rangamati Road (N-106) Under Road Division Rangamati during the year 2025-2026.
Installation of electrical equipment for the security of the RHD Lake View Garden at 65th Km of Chittagong-Hathazari-Rangamati Road (N-106) Under Road Division Rangamati during the year 2025-2026.
Supply of Materials for Routine maintenance work of Different Road of Road Sub-Division-1 under Bandarban Road Division during the year 2025-2026 (P-2).
Supplying of Stone Chips, Pea Gravels, Paint (Road Marking), Thiner, Sand, Reflecting sheet & synthetic Bag at RHD Stackyard Phulbari under Road Division, Dinajpur during the year 2025-2026
35/e-GP/2025-2026/JRD Repair Seal Coat Work at ch.3+000 to ch.5+000 km of Centrehat-Paikkhali Road (Z-8706) under Jhalakathi Road Division during the year 2025-2026.
Surfacing Work by Carpeting and Seal Coat at Ch. 00+000 (Bangalhalia) to Ch. 09+000 (Islampur) km of Bangalhalia-Rajasthali-Farua-Bilaichhari-Barkal Road (Z-1814) under Rangamati Road Division during the year 2025-2026
Repairing of Different Worksheds at different Location under Ferry Division, Sylhet during the year 2025-2026.
Supply of various electrical equipment for maintenance of electrical installations in office and workshop under RHD, Ferry Division, Sylhet during the financial year 2025-2026.
Procurement of Various Tools and equipment for Emergency Pontoon and Gangway Adjustment, Heavy-Duty Works for new Kushiyara ferry ghat and Auto Workshop in RHD Ferry Division, Sylhet during The Fiscal Year 2025-2026.
Supply and installation of different fitting and fixtures for workshops and office buildings under RHD, ferry division, sylhet during the financial year 2025-2026.
Supply of different raw materials and spare parts for repair of ferry, pontoon and gangway etc. under RHD, Ferry Division, Sylhet during the financial year 2025-2026.
Repair work of Lister Arc Welding generator (3-Cylinder-Diesel) with necessary spare parts of Ferry Division, Sylhet during the financial year 2025-2026.
Construction of 12.75m (1x12.00 m) Long RCC Slab Bridge (Pukhuria Bridge) at 62nd Km ( Ch. 61+267m) on Dhaka (Mirpur)-Uthuli-Paturia National Highway Road (N-5) under Manikganj Road Division during the year 2025-2025.
Providing different type of Labour for Emergency Repairign of potholes, Large holes, damaged Pavement, due to heavy traffic,rain and other road Maintenance works by laying Asphalt materials at Different road under Manikganj Road Sub-division under Manikganj Road division during the year of 2025-2026.
Construction of 12.75 m ( 1x12.00m ) Long RCC Slab Bridge ( Joka Bridge - 1) at 61st Km ( Ch. 60+123m) of Dhaka ( Mirpur) - Uthuli - Paturia National Highway Road ( N- 5) under Manikganj Road Division during the year 2025-2026.
Replacement of Bearing Plate and other ancillary works of Kalia Bridge at 30th Km (p) of Dhaka ( Mirpur)- Uthuli- Paturia- ( N-5) Road under Road Division Manikganj during the year 2025-2026.
33/e-GP/2025-2026/JRD Repair Seal Coat Work at ch.8+900 to ch.11+885 km of Bhandaria-Paikkhali-Kathalia (Z-8705) under Jhalakathi Road Division during the year 2025-2026.
34/e-GP/2025-2026/JRD Repair Seal Coat Work at ch.1+500 to ch.2+800 km of Centrehat-Paikkhali Road (Z-8706) under Jhalakathi Road Division during the year 2025-2026.
Supplying Skilled & Un-skilled Labour for Routine Maintenance Works at different Roads, Bridge & Ferry Approaches of Barishal Road Sub-Division-2, Barishal under Barishal Road Division during the year 2025-2026.
Repair & maintenance works of ACE quarters Residential Building under Road Division Rangpur During the FY 2025-2026.
Periodic Maintenance Programme (PMP Road-Major) for Providing Strengthening & Surfacing by DBS Wearing Course & Rigid Pavement Work from Ch. 0+000 to 8+200 of Lalmai-Barura-Jhalam-Adda-Jagatpur Road (Z-1401) under Road Division Cumilla during the year 2025-2026.
Supplying of Asphalt materials (Wearing Course) for Routine Maintenance Work at Kalurghat-Monosartek Road (N-107) of Patiya Road Sub-Division Under Chattogram South Road Division during the Year 2025-2026.
Supplying of Asphalt materials (Wearing Course) for Routine Maintenance Work at Patiya-Monosartek-Anowara-Kosturighat Road (Z-1070) (6th to 19th(P) km) & Patiya-Anowara-Banshkhali-Toitong Road (R-170 (7th to 23rd km)of Patiya Road Sub-Division Under Chattogram South Road Division during the Year 2025-2026.
24/e-GP/2025-2026/JRD Topographical Survey, Cross Section, Land Acquisition Plan, Earth Work Calculation, Drone Video Survey & Geometric Design at 1st km. Ch.-00 +000 m. to 19th km. Ch.- 18+570 m. of Jhalakathi-Nabagram-Gava-Eksarapara Road (Z-8704) under Road Division, Jhalakathi during the year 2025-2026.
Supplying of different materials for routine maintenance work for different Road of Road Division Gopalganj at Bhatiapara Road Sub Division, Gopalganj RHD Stack yard under Gopalganj Road Division during the year 2025-2026.
Emergency saucer drain & cross drain works at culvert approaches at 23th Km (Ch. 22+094), 24th Km (Ch. 23+364), 26th Km (Ch. 25+570). 29th Km (Ch. 28+266), 31th Km (Ch. 30+029), 31th Km (Ch. 30+249), 33th Km (Ch. 32+878), 34th Km (Ch. 33+463) of Bhanga-Bhatiapara-Mollahat-Fakirhat-Noapara Road (N-805) under Road Division, Gopalganj during the year 2025-2026.
Emergency Supply & Fitting, Fixing of Overhead Cantilever Gantry of Arm 2.5 m, Two Stand (Size 6' x 5') Sign Board (For Location Identification), Directional Sign Board with reflecting sheet at different Roads under Road Division, Gopalganj during the year 2025-2026
Supplying of Broken stone chips (25mm and 20mm down graded), 1st Class Bricks, Sand & Fire Wood at RHD Stackyard (Barapara, Laksham & Lalmai) for Departmental Routine Maintenance work of different Roads (Cumilla Road Sub-Division) under Road Division, Cumilla during the year 2025-2026.
Supplying required necessary Electric Equipment/Materials of different sections (Petrol, Diesel, Electric, Heavy & Ancillary).
Supply of spare parts for repair work of Mitsubishi Truck Dhaka Metro-U-02-0120 & Mitsubishi Truck Dhaka Metro-U-11-0693.
Supplying the required heavy duty hydraulic floor jack, tool cabinet, spray gun, impact wrench, Electric Drill machine for using the inspection vehicle repairing & maintenance work of Petrol, Diesel, Ancillary and Electric Section.
Supplying the engineering & others equipment of different section through Workshop Sub-Divisio.
Repairing, servicing & maintenance work for VRF system air condition of RHD Head Quarter Tejgoan, Dhaka Block A (2 Plant), Block B (1 plant) & Block C (1 plant) by fitting-fixing of required spare parts.
Supplying and fitting fixing of required necessary Spare Parts for maintenance work for VRF air condition of RHD Headquarter, Tejgaon, Dhaka Block A(2 Plant), Block B(1 Plant) & Block C(1 Plant).
Supply and fitting fixing works of required spare Parts for maintenance work for VRF system air condition of DTCA Head Quarter Complex-Ground to 7th (RHD Part) inside the RHD Headquarters Compound, Tejgoan, Dhaka.
Periodic Maintenance Programme (PMP Road-Major) for Widening of Existing Pavement & DBS Wearing Course with Partial Strengthening at Chainage 00+000 (Mainamati) to Chainage 5+000 (Devpur) of Cumilla (Mainamati)-Brahmanbaria (Sarail) Road (N-102), under Road Division, Cumilla during the year 2025-2026.
Periodic Maintenance Programme (PMP Road-Major) for Widening of Existing Pavement & DBS Wearing Course with Partial Strengthening at Chainage 5+000 (Devpur) to Chainage 10+000 (Kangshanagar) of Cumilla (Mainamati)-Brahmanbaria (Sarail) Road (N-102), under Road Division, Cumilla during the year 2025-2026.
Periodic Maintenance Programme (PMP Road-Major) for Widening of Existing Pavement & DBS Wearing Course with Partial Strengthening at Chainage 10+000 (Kangshanagar) to Chainage 15+200 (Chorbakor) of Cumilla (Mainamati)-Brahmanbaria (Sarail) Road (N-102), under Road Division, Cumilla during the year 2025-2026.
Periodic Maintenance Programme (PMP Road-Major) for Widening of Existing Pavement & DBS Wearing Course with Partial Strengthening at Chainage 15+200 (Chorbakor) to Chainage 20+800 (Debidwar) of Cumilla (Mainamati)-Brahmanbaria (Sarail) (N-102) Road, under Road Division, Cumilla during the year 2025-2026.
Supply and laying of Asphalt Materials for Emergency Repairing Repairing at Different km at Different Road of Road Sub-Division-II, Section-III, Under Road Division, Faridpur during the Year 2025-2026.
Supply and laying of Asphalt Materials for Emergency Repairing Repairing at Different km at Different Road of Road Sub-Division-II, Section-II, Under Road Division, Faridpur during the Year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at May-26 to June-26 Under Road-Sub Division-1, Section-I Under Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at March-26 to Appril-26 Under Road-Sub Division-1, Section-I Under Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at May-26 to June-26 Under Road-Sub Division-1, Section-II Under Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at March-26 to Appril-26 Under Road-Sub Division-1, Section-II Under Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at May-26 to June-26 Under Road-Sub Division-1, Section-III Under Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at March-26 to Appril-26 Under Road-Sub Division-1, Section-III Under Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at March-26 to Appril-26 Under Road-Sub Division-2, Section-I, Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at May-26 to June-26 Under Road-Sub Division-2, Section-I, Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at March-26 to Appril-26 Under Road-Sub Division-2, Section-III, Road division, Faridpur During the Financial year 2025-2026.
Providing Skilled & Semi Skilled Labour for Executing Road repairing Branch Triming, Clearing & Grubbing of Roadway Embankment at May-26 to June-26 Under Road-Sub Division-2, Section-III, Road division, Faridpur During the Financial year 2025-2026.
Clearing and Grubbing at different Chainage of Daulatdia-Faridpur(Goalchamot)-Magura-Jhenaidah-Khulna-Mongla(Digraj) National Highway (N-7) Under Road Division, Faridpur during the year 2025-2026.
Periodic Maintenance Program (Roads) Providing Partial strengthening and Single Bituminous Surfacing Treatment Work at Ch: 29+700m to 31+200m and Ch: 32+170m to Ch: 33+670m of Faridpur-Hatgazaria-Charbhadrasion-Sadarpur Road (Z-8402) under Road Division Faridpur, during the FY 2025-2026.
Construction of RCC U-Drain at 16th KM (ch:15+680) of Gaibandha-Fulchari-Bharatkhali-Shaghata Road (Z-5552) under Road Division Gaibandha during the year 2025-2026.
Supplying Road Marking Paint, synthetic enamel Paint, T-4, T-6 Thinner, Reflectig Sheet, Geo-Bag and 1st Class Bricks for departmental emergency repair & maintenance works under Road Division Panchagarh during the year 2025-2026.
Supplying of Plant Produced Asphalt Materials for routine maintenance of Broken edge, Undulation, Surfacing and Hard Shoulder for Rigid Pavement of different roads under Road Division Panchagarh during the year 2025-2026.
Construction of Brick masonary Drain & Drain relevant works at RHD Gaibandha office campus under Road Division Gaibandha during the year 2025-2026.
21/e-GP/2025-2026/JRD Providing Installation & refitment of Road directional overhead Gantry, Road Instruction Sign at Jhalakathi section under Jhalakathi Road division during the year 2025-2026.
22/e-GP/2025-2026/JRD Providing Installation & refitment of Road Directional Overhead Gantry, Road Instruction Sign at Nalcity Section under Jhalokathi Road Division during the year 2025-2026.
Construction of RCC U-Drain at CH 18+450 to CH 18+660 KM of Palashbari-Gaibanda (R-555) Road under Road Division Gaibandha during the year 2025-2026.
Supplying of Skilled Labour, Semi-Skilled & Un-Skilled Labour for Routine Maintenance works (repair of Potholes, HBB Work, repair of Soft Shoulder, repair of Sign Signal & cutting of Jungle at Different Roads at Road Sub-Division-1 under Road Division, Khulna during the year 2025-2026.
Supplying of Stone chips (20mm down), Local Sand (FM = 0.5), Sylhet Sand (FM = 2.5), Fire wood, different dia Wire Rope & U- Clamp at RHD Khulna Stackyard for Repairing of different roads & different Ferry Ghat of Road â?�Sub-Division-2, Khulna under Road Division, Khulna during the year 2025-2026.
Supplying of Skilled Labour, Semi-Skilled & Un-Skilled Labour for Routine Maintenance works (repair of Potholes, HBB Work, repair of Soft Shoulder, repair of Sign Signal & cutting of Jungle at Different Roads at Road Sub-Division-2 under Road Division, Khulna during the year 2025-2026.
Installation of Surveillance System to protect CCTV, VDS, VMS, Speed Enforcement Camera, Transformer and other ancillary equipments installed on Dhaka (Jatrabari)-Mawa-Bhanga-Barisal-Patuakhali Highway (N8) for "Improving the Reliability and Safety on National Highways Corridors of Bangladesh by Introduction of Intelligent Transport System (ITS)" project under Road Safety Division during the fiscal Year 2025-2026.
Digital Topographical Survey with Long & Cross Section Survey at Different Road under Road Division Jhenaidah during the year 2025-2026.
Construction of Vehicle Parking Shade with industrial zinc alum color coated profile sheet Roofing at RHD Compound under Road Division Jhenaidah, during the year 2025-2026.
Sub-Soil Investigation by Rotary Method drilling Construction of Kaharol-Dhukurjhari-Birol Road (Z-5017) at College More Culvert at Ch. 1+300 Km and Shashwan Ghat Culvert at Ch. 1+900 Km under Road Division, Dinajpur during the year 2025-2026
Raising From Existing Road pavement At Ch.9+305.00 m to 9+405.00m & Soling / HBB work at Ch.9+743.00 m to 9+790.00m L/S Ch.9+305.00 m to 9+790.00m R/S at Jhenaigati Bazar of Jhulgaon-Jhenaigati-Shandhakura (Z-4605)Road Under Sherpur Road Division during the Year 2025-2026.
Single Bituminous Surface Treatment (SBST) work at Ch.7+300 to 8+800 of Bongaon-Nunni-Hatipagar Road (Z-4603) under Sherpur Road Divsion during the year 2025-2026.
Supplying Skilled and unskilled Labour for routine maintenance work Jungle Cutting ,Earthen Shoulder Repair,Rain Cut Repair & Potholes repair at Differents Road of Sub-Division-1 ( Section-2) Under Sherpur Road Division During the Year 2025-26.
Periodic Maintenance Programme Providing Widening, Strengthening & Surfacing with DBS-Base Course & DBS-Wearing Course including Construction of Rigid Pavement at Ch. 5+150 (Demra Shohid Minar More) to Ch. 8+150 (Shimrail Chattogram Sarak More) of Jatrabari-Demra-Shimrail-Narayangonj (Chasara) Road (R-110) under Dhaka Road Division during the year 2025-2026.
Supplying for1st class Bricks (Auto Machine made),Stone Chips Stone Chips 6mm downgraded) Coarse Sand (F.M-1.80) & Local Sand (F.M-0.80) for the Maintenance works of different Roads at Sherpur Road Division during the year 2025-2026.
Supplying Skilled and unskilled Labour for routine maintenance work Jungle Cutting,Earthen Shoulder Repair,Rain Cut Repair & Potholes repair at Differents Road of Sub-Division-1 (Section-2) Under Sherpur Road Division During the Year 2025-26
Construction of 8.00m (1x8.00m) College Mor RCC Slab Bridge at 2nd km (Ch. 1+300m) on Kaharol - Dhukurjhari -Birol road Zilla Highway (Z-5017) under Dinajpur Road Division, during the year 2025-2026
Construction of 20.00m (2x10.00 m) Shashanghat RCC Slab Bridge at 2nd km (Ch.1+900m) on Kaharol - Dhukurjhari - Birol road Zilla Highway (Z-5017) under Road Division Dinajpur, during the year 2025-2026
Improvement of connecting roads of Lakshmipur, Noakhali and Feni district with National Special Economic Zone (NSEZ) of Feni-Sonagazi-Muhuri Project Road (Z-1034) from 20th (p) km to 30th (p) km & Sonagazi-Olamabazar-Chardarbeshpur-Companiganj Road (Z-1434) from 1st (p) km to 6th km (p) to appropriate standard with different ancilliary works including Construction of 44.00m RCC Box Culvert under Feni Road Division during the year 2024-25.
Upgradation of the Muhuriganj-Chattogram Beri Band Road (from Jorarganj Bazar to Project Bazar to Chittagong Economic Zone Link Road) including construction of 18-meter RCC box culvert, construction of 20-meter bridge and other ancillary works under Road Division Chattogram-During the year 2024-2025. (Ch: 00+000 Km to 17+288 Km) (WP-08).
04/e-GP/PMP-Roads/JRD/2025-2026 Strengthening by Base Type-I & Dense Bituminous Surfacing - Wearing Course Work at Ch.15+000 (Manosita Womens College) to Ch.30+000 (Amua Zero Point) km of Rajapur-Kathalia-Amua-Bamna-Patharghata Zila Road (Z-8708) (Jhalakathi Part) under Jhalakathi Road Division during the year 2025-2026.
Surfacing Work by DBS Wearing Course at Ch. 09+000 (Islampur) to Ch. 18+740 (Rajasthali) km at Bangalhalia-Rajasthali-Farua-Bilaichhari-Barkal Road Zilla Highway (Z-1814) under Rangamati Road Division.
Supplying of Asphalt materials for Departmental Routine Maintenance work at Different Zilla Road of Vitikandi Road Sub-Division under Narayanganj Road Division during the FY 2025-2026
Supply of spare parts for repairing of Carryboy Pickup No. Dhaka Metro-Tha-12-0442 used by Vitikandi Sub-Division, Pajero Jeep No. Dhaka Metro-Bha-7284 used by 1st Line Workshop Sub-Division, and Prado Jeep No. Dhaka Metro-Gha-11-1644 used by Narayanganj Road Sub-Division-1 under Narayanganj Road Division during the financial year 2025-2026
Construction of 75.99 m (2x15.25m+1x42.68m) long P.C Girder & RCC Girder Bridge (Hurasagor Bridge) 11th km (Ch.10+645 m) of Sirajganj-Kodda-Someshpur Zilla Highway (Z-5402) under Sirajganj Road Division during the year 2025-2026
Construction of Hard Shoulder at 429th(p), 432th(p), 433th(p), 439th(p), 440th(p), 441th(p), 443th(p) to 449th(p) & 450th(p) to 452th(p) Km of Dhaka (Mirpur)-Utholia-Paturia-Notakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha (N5) Road under Road Division, Thakurgaon during the year 2025-2026.
Construction of Hard Shoulder by Periodic Maintenance Program (PMP-Major Roads) Including DBS Work at Ch. 372+396 (Rabeya More) to Ch. 381+350 (Ranirbandar) of Dhaka (Mirpur)-Utholi-Paturia-Notakhola-Kashinathpur-Bogura-Rangpur-Beldanga-Banglabandha (N-5) Road under Road Division, Dinajpur during the year 2025-2026.
Periodic Maintenance Programme (PMP-Major-Road) Providing Widening,Strengthening flexible Pavement, DBS Base Course, DBS Wearing Course, Protective work & Other ancillary works from Ch. 88+325 (Shimultola) to 94+700 (Amgram) of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patukhali (N-8) National Highway Road under Road Division, Madaripur during the FY 2025-2026.
Supply, fitting & fixing new High Intensity Prismatic reflecting sheet (HIP-3M) and installation Advance Directional Sign Board, Hanging Sign Board, One Side Cantilever sign Board, different types of signs and signals to prevent accidents at ch 00+000 to 25+500 of Joydebpur-Tangail-Jamalpur Road (N-4) under Gazipur Road Division during the Year 2025-2026.
Widening (Partial), Strengthening (Partial), Surfacing and Protective work (Damaged Portion) from Ch. 0+00 km (Togra More) to Ch. 17+345 km (Synnashi Kheya Ghat) of Togra-Zianagar-BaliPara-Kalaron-Synashi Road (Z-7711) Under Pirojpur Road Division during the year 2025-2026.
Periodic Maintenance Programme (PMP) Providing Dense Bituminous Surfacing -Wearing Course Work From Ch.0+00 (Suhrawardi College) to 14+850 (Nazirpur Bridge) on Pirojpur-Nazirpur-Matibanga-Patgati-Gopalgonj (Z-7704) (Pirojpur portion) Under Pirojpur Road Division during the year 2025-2026.
Periodic Maintenance Programme (PMP-Roads) for Widening at Ch.0+030 (Rajbari Rastermor) to Ch.5+300 (Munshi Bazar) of Faridpur Town Bypass (N-808) And Construction of U-Drain & Cross-Drain at Ch.28+100 km to Ch. 28+475 km of Bhanga-Faridpur Road N-804 Road under Road Division, Faridpur during the FY 2025-2026.