Total Tenders: 1368
| 201 |
1070969 |
Periodic Maintenance Programme Providing Widening of Pavement with DBSWearing
Course, Bus-Bay, Road-Median & Ancillary Works from Ch. 0+000
(Bosila Teen Rastar More) to Ch. 01+600 (Bosila Bus Stand) of Bosila Bridge
Connecting Road (Z-8208) under Dhaka Road Division during the year 2024-
2025. |
2024-2025 |
Dhaka Division |
Dhaka Division |
Revenue |
J Enterprise - M/S Zaman Enterprise (JV) |
| 202 |
1062645 |
Bituminous overlay with DBS Wearing Course including necessary repair of
pavement distresses from Ch. 08+596 to 20+096 & Ch. 25+700 to 29+750 of
Paglapir-Dalia-Tista Barrage (R-560) Road under Road Division, Nilphamari
under PMP (Major-Roads) of FY 2024-2025. |
2024-2025 |
Nilphamari Division |
Nilphamari Division |
Revenue |
Md. Mostafizur rahman |
| 203 |
1072170 |
Strengthening with Base Type-I, DBS Wearing Course work from Ch: 0+000m
(Garagonj Bazar) to Ch: 6+233m (Shailkupa)= 6233m including 1000m Rigid
Pavement under PMP (Major-Road) at Garagonj-Shailkupa Road (Road No. Z-
7458) under Road Division Jhenaidah during the year 2024-2025. |
2024-2025 |
Jhenaidah Division |
Jhenaidah Division |
Revenue |
Md.Mejanur Rahman |
| 204 |
1060134 |
Periodic Maintenance Programe for Strengthening, DBS Base Course & DBS
Wearing Course at Ch. 0+000m (Postogola) to 0+200m, 3+665m (Taltola) to
9+950m (Chasara) of Postogola-Chashara Road (N-532) under Dhaka Road
Division During the year 2024-2025. |
2024-2025 |
Dhaka Division |
Dhaka Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 205 |
1071973 |
Periodic Maintenance Programme by Rigid pavement, RCC U-Drain,
Strengthening & Wearing Course at 1st km, 2nd Km & 3rd km (P) of Town
Bridge to Terobaki Road (R-147) under lakshmipur Road Division during the
year 2024-2025. |
2024-2025 |
Lakshmipur Division |
Lakshmipur Division |
Revenue |
DON ENTERPRISE |
| 206 |
1058132 |
Periodic Maintenance programme for DBST work at Ch. 39+473m to 51+985m
of Mawna-Fulbaria-Kaliakoir-Dhamrai-Nabinagar (Dhulivita) Road (R-315)
under Manikganj Road Division during the year 2024-2025. |
2024-2025 |
Manikganj Division |
Manikganj Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 207 |
1059770 |
Periodic Maintenance Program Providing DBSWC Including Strengthening work
at Ch. 4+200 to Ch. 9+300, Sign-Signal, Km Posts etc. of Kulaura (Gazipur) -
Juri (Shagar nal) Upazilla Connecting Road (Z-2825) under Road Division,
Moulvibazar during the year 2024-2025 |
2024-2025 |
Maulvibazar Division |
Maulvibazar Division |
Revenue |
MD. MUHIBUR RAHMAN & Md. Quamruzzaman Construction Co. Limited. |
| 208 |
1028103 |
Construction of 103.430m (3x33.540m) long P.C. girder 2nd Kumedpur Bridge at 24 km (ch. 23+230m) on Sonahat Landport- Madarganj-Bhitarbandh-Nageshwari (Z-5624) Road under Kurigram Road Division, Kurigram during the year 2023-24 (WP-12B) |
2023-2024 |
Rangpur Zone |
Kurigram Division |
Development |
Tender Validity Extension |
| 209 |
1031899 |
Remaining works of Package WD-1, WD-2, WD-5 and WD-6 including new construction, widening and strengthening of Flexible pavement, Rigid pavement, saucer drain, RCC Toe Wall, Footpath cum RCC U-Drain, construction of 3 nos Culvert etc. from Ch. 6+215 to 6+913 (Noldanga Bazar Bypass), Ch. 51+365 to 51+715 (Gopalpur), Ch.54+717 to 54+802 (Milonpur), Ch. 55+100 to 55+600 (Durgapur), Ch. 57+180 to 57+490 (Keshobpur), Ch. 60+920 to 61+330 (Charan Bazar), Ch. 63+800 to 65+840, Ch. 67+360 to 67+636, Ch.67+960 to 68+020 & Ch. 70+280 to 70+576 km of Bamondanga (Gaibandha)-Shathibari-Aftabgonj (Dinajpur) Road (Z-5013) under Road Division Gaibandha, Rangpur & Dinajpur during theFY 2024-2025. |
2024-2025 |
Rangpur Circle |
Gaibandha Division |
Development |
M/S A.S. Construction |
| 210 |
1013669 |
Widening, strengthening and surfacing works from ch.21+440 to ch.60+780 km of Bamondanga (Gaibandha)-Shathibari-Aftabgonj (Dinajpur) Road (Z-5013) under Road Division, Rangpur during the FY 2024-2025 (WD-07). |
2024-2025 |
Rangpur Circle |
Rangpur Division |
Development |
Md. Khairul Kabir Rana |
| 211 |
1059437 |
Surfacing by DBS Wearing Course Including Strengthening at 3rd Km (P) to
7th Km (P) of Feni (Temohoni)-Biroli Bazar-Sonaimuri (Gazirhat) Road (Z-
1444) under Road Division Feni during the year 2024-2025. |
2024-2025 |
Feni Division |
Feni Division |
Revenue |
M/S. Shahid Traders |
| 212 |
1060169 |
Periodic Maintenance Work By DBS Wearing Course and Construction of Rigid
Pavement with other ancillary works from Chainage 6+600m (Hemayetpur) to
9+380m (Fulbaria) of Dhaka-Aricha National Highway (N-5) under Dhaka road
Division during the year 2024-2025. |
2024-2025 |
Dhaka Division |
Dhaka Division |
Revenue |
J Enterprise - M/S Zaman Enterprise (JV) |
| 213 |
1059678 |
Periodic Maintenance work under PMP(Road-Major) providing by Rigid
Pavement Work at Ch. 219+450 to Ch. 219 + 700 Ch. 225+170 to Ch. 225 +
900 Ch. 225+948 to Ch. 227+445 & Ch. 227+460 to Ch. 227+570 Km of
Dhaka (Katchpur)-Bhairab-Jagadishpur-Shaistaganj-Sylhet-Tamabil-Jaflong
Road (N-2) under Road Division Sylhet, during the year 2024-2025 |
2024-2025 |
Sylhet Division |
Sylhet Division |
Revenue |
Reliable Builders Ltd. |
| 214 |
1065913 |
Surfacing by DBS Wearing Course including partial Strengthening
work at 1st Km, 2nd Km (p) of Feni - Noakhali National Highway
and at 1st Km (p) of Mohipal-Circuit House Road (Z-1151) under
Road Division Feni during the year 2024-25. |
2024-2025 |
Feni Division |
Feni Division |
Revenue |
A.R.T.S Corporation - M/S. Shahid Traders (JV) |
| 215 |
1066613 |
Periodic Maintenance Programme by Construction of Rigid Pavement, Strengthening & Surfacing with DBS Wearing Course at 00+000 to 13+000 km of Bakshiganj-Balugaon-Dewangonj Road (Z-4614) under Jamalpur Road Division during the year 2024-2025. |
2024-2025 |
Jamalpur Division |
Jamalpur Division |
Revenue |
Reliable Builders Ltd. |
| 216 |
1066585 |
Periodic Maintenance Program (PMP) for Strengthening with Aggregate Base
type-I, DBS-Base Course & DBS-Wearing Course work at different location
from Ch: 00+000 (Porantalukderhat) to Ch: 107+875 (Charmanika); (Working
Location Ch: 00+697 to Ch: 42+534, Length = 6.304Km)
ofBhola(Porantalukdarhat)-Borhanuddin-Lalmohon-Charfassion-Charmanika
Regional Highway (R-890) Under Road Division Bhola during the year2024-
2025. |
2024-2025 |
Bhola Division |
Bhola Division |
Revenue |
M/S. Shahid Traders-Dhaly Construction Ltd. (JV) |
| 217 |
1075628 |
Periodic Maintenance Programme (PMP) of DBS Wearing Course with Partial
Strengthening Work at Ch 0+000 to 10+000 km (Madhaya to Vallabhpur) of
Chandina (Madhaya)-Moricha-Chapera-Companiganj (Z-1017) Road under Road
Division, Cumilla during the year 2024-2025. |
2024-2025 |
Cumilla Division |
Cumilla Division |
Revenue |
MD. DELOUR HOSSAIN BABUL |
| 218 |
1070352 |
Periodic Maintenance work under PMP (Road-Major) providing by Rigid
Pavement, Strengthening DBS Base Course & DBS Wearing Course Work
including RCC U-Drain & RCC Palisiding, Road Marking , Traffic Sign & Sign
Post Work (From Rashidpur to Atgram Bazar) at Ch. 0+000 to 3+800, Ch.
4+260 to Ch.5+700, Ch. 10+833 to Ch.11+480, Ch. 12+655 to Ch. 13+615 &
Ch. 13+960 to 14+060 Km of Rashidpur-Biswanath-Rampasha-Lamakazi
Road (Z-2016) under Road Division, Sylhet of Road Zone Sylhet during the
year 2024-2025. |
2024-2025 |
Sylhet Division |
Sylhet Division |
Revenue |
Reliable Builders Ltd. |
| 219 |
1045017 |
Widening & Surfacing by DBS Wearing Course at 3rd KM to 20th KM, Construction of RCC Retaining wall and Drain at different KM ofKhagrachari -Dighinala -Baghaihat- Sajek Road (Z-1603) under Khagrachari Road Division during the year 2024-2025. |
2024-2025 |
Khagrachari Division |
Khagrachari Division |
Revenue |
Tender Validity Extension |
| 220 |
1057762 |
DBS Wearing Course with Partial Strengthening work under Periodic
Maintenance Programme (PMP) at 11th Km. (Sonapur) to 22nd (P) Km.
(Homna) (Ch. 10+500 to 21+900) of Companiganj-Muradnagor-Homna (Z-1205)
Road under Road Division, Cumilla during the year 2024-2025. |
2024-2025 |
Cumilla Division |
Cumilla Division |
Revenue |
M/S Zaman Enterprise-J Enterprise (JV) |
| 221 |
1071949 |
Strengthening of Existing Pavement, Construction of new pavement, DBS Base
course, DBS Wearing course, Rigid Pavement, Earth work in Road Embankment,
Protective work by RCC Retaining Wall, Brick Toe wall, Cast-in-situ Palisiding, C.C
block with Geo textile, Brick "U"-Drain & Saucer Drain, Installation of Overhead
Sign, Sign, Signal, Kilometer Post, Guide Post, Constuction of Bus Bay, Reflecting
Road Studs, Deliniator-Reflector and Road Marking work from 13th KM to 24th KM
at (Ch: 12+000 to Ch: 24+000) of Eliotganj-Muradnagar-Ramchandrapur-
Bancharampur (Z-1042) Road, Development Project Programme, under Road
Division Cumilla during the year 2023-2024. |
2023-2024 |
Cumilla Division |
Cumilla Division |
Development |
Moshiur Rahman Chowdhury |
| 222 |
1061491 |
Improvement of Satkhira-Shakhipur-Kaliganj (Z-7602) Road from Ch: 5+300m (Alipur Checkpost) to Ch:15+000m (Parulia Chara Bottola) = 9700.0m under Road Division, Satkhira [FY: 2024-25] |
2024-2025 |
Satkhira Division |
Satkhira Division |
Development |
MD. MOYENUDDIN (BASHI) LIMITED |
| 223 |
1080601 |
Re-Construction of Severely damaged & washed out road due to heavy Flush flood recently occurred at 8th (p) km & Rigid Pavement (Bazar portion) of Bongaon-Nunni-Hatipagar Road ( Z-4603 ) under Sherpur Road Divition during the year 2024-2025.
Category :Engineering works and construction works; Works for complete or part construction and civil engineering work; Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork; |
2024-2025 |
Sherpur Division |
Sherpur Division |
Revenue |
M/S Ismail Hossain-M/S R.P Construction Co. JV |
| 224 |
1076620 |
Periodic Maintenance program by providing DBS Wearing Course from ch.00+000 km to ch.06+050 km of Bausi-Gopalpur Road (Z4018) & DBS Wearing Course from ch.05+600 km to ch.11+200 km of Sarishabari Link (Pourosova) Road (Z-4030) under Jamalpur Road Division during the year 2024-2025. |
2024-2025 |
Jamalpur Division |
Jamalpur Division |
Revenue |
S. Ananta Bikash Tripura Limited |
| 225 |
1060849 |
Improvement of Satkhira-Shakhipur-Kaliganj (Z-7602) Road from Ch: 15+000m (Parulia Chara Bottola) to Ch: 26+000m (Hadipur) = 11000.0m under Road Division, Satkhira [FY:2024-25] |
2024-2025 |
Satkhira Division |
Satkhira Division |
Development |
MD. MOYENUDDIN (BASHI) LIMITED |
| 226 |
1068539 |
Construction of 25.74m (1x24.40m) long PC Girder Bridge at 15th km (Ch. 14km + 850m) of Sarail-Nasirnagar-Lakhai Road (R-220) under Brahmanbaria Road Division during the year 2024-2025. |
2024-2025 |
Brahmanbaria Division |
Brahmanbaria Division |
Revenue |
MD. DELOUR HOSSAIN BABUL |
| 227 |
1053932 |
Periodic Maintenance Programme (PMP) for Profile Correction, DBS Wearing Course and Road Marking Work at Start Ch: 38+950 to End Ch: 60+950 of Matlab - Meghna - Dhonagoda Berribadh Road (Z-1069) under Road Division Chandpur during the year 2024-2025. |
2024-2025 |
Chandpur Division |
Chandpur Division |
Revenue |
Oyster Construction and Shipping Company Ltd. |
| 228 |
976143 |
Rehabilitation/Re-construction/Improvement by Earth Work, Construction of 4-Lane Rigid Pavement, Road Median, Bus-Bay,Intersection, Footpath-cum-Drain, Protective Work by CC Block, Sign Signal, Road Marking etc. work at Ch: 50+000 KM to Ch:52+000 KM of Sylhet-Sunamganj Road (R-280) under Road Division, Sunamganj of Road Zone Sylhet during the year 2023-2024 (Package # WP-05). |
2023-2024 |
Sylhet Zone |
Sunamganj Division |
Development |
M. M. Builders & Engineers Ltd |
| 229 |
1021835 |
Construction of Rigid Pavement from Ch: 91+600 to 92+104 (Hatgopalpur Bazar) Total = 504.00m at Daulatdia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jashore Khulna-Mongla (Digraj) National Highway (N-7) and Repair & DBS Wearing Course work from Ch: 105+816m (Amerchara Bazar) to 115+816m (Chuadanga Bus Stand) Total = 10000.00m at Kushtia (Trimohoni)-Maherpur-Chuadanga-Jhenaidah Road (R-745) under Road Division, Jhenaidah. |
2024-2025 |
Khulna Zone |
Jhenaidah Division |
Revenue |
Jahirul Limited |
| 230 |
1055355 |
Improvement of Satkhira-Shakhipur-Kaliganj [Z-7602] Road from Ch: 26+000m (Hadipur) to Ch: 35+040m (Kaliganj Bazar) = 9040m under Road Division, Satkhira [FY: 2024-25] |
2024-2025 |
Satkhira Division |
Satkhira Division |
Development |
MD. MOYENUDDIN (BASHI) LIMITED |
| 231 |
1057764 |
Periodic Maintenance Programme (PMP) Providing by DBS Wearing Course with Partial Strengthening & Protective Work at Ch.10+000 to 17+650 (Vallavhpur to Morichakandha) of Chandina (Madhaya)-Moricha-Chapera-Companiganj (Z-1017) Road under Road Division, Cumilla during the year 2024-2025. |
2024-2025 |
Cumilla Division |
Cumilla Division |
Revenue |
M/S. R.P Construction Co. |
| 232 |
1080540 |
Periodic Maintenance Program Work of Nakla- Nalitabari-Nakugaon Landport Road (N-402) at Ch. 0+000 to Ch. 28+000 km (Nakugaon Land Port) Providing by DBS Wearing Course and protective work under Sherpur Road Division during the year 2024-2025. |
2024-2025 |
Sherpur Division |
Sherpur Division |
Revenue |
SEL-UDC JV |
| 233 |
1029974 |
Widening of Road Embankment, Construction of New Pavement, Rigid Pavement, Canopy & Others works including Surfacing and Protective Works at ch. 2+151 to ch. 3+259 & ch. 5+704 to ch. 8+500 Km. of Keraniganj (Syedpur)- Hashara-Birtara-Shingpara-Kajalpur-Nagerhat Road (Z-8203) under Munshigonj Road Division during the year 2023-2024 [WP- 06] |
2023-2024 |
Munshiganj Division |
Munshiganj Division |
Development |
Orient Trading & Builders Ltd. |
| 234 |
1061890 |
Periodic Maintenance Programme (PMP-Major Roads) Providing by construction of Rigid Pavement from Ch. 4+700m to 5+400m, Ch. 5+800m to 6+250m & Ch. 29+050m to 30+250m, Total Length = 2350.00m of Khulna-Chuknagar-Satkhira National Highway (N-760) under Road Division, Khulna during the year 2024-2025. |
2024-2025 |
Khulna Division |
Khulna Division |
Revenue |
M/S. M.A. ENGINEERING-J Enterprise (JV) |
| 235 |
1054563 |
Widening of Existing Pavement & Surfacing by DBS-Wearing Course from Ch: 15+000m to 31+000m (Loknathpur Bazar to Jibannagar Bazar) Total Length 16000.00m of Chuadanga-Darshana-Jibannagar-Kotchandpur-Kaligonj Road (R-748) (Chuadanga Portion) through PMP/2024-25 (Major-Road) under Road Division, Chuadanga. |
2024-2025 |
Chuadanga Division |
Chuadanga Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 236 |
1058966 |
Construction of 44.02m. (1x42.68m) Long P.C Girder (Chitra Bridge) at 20th Km (Adjacent to Kolkolia Bazar) (Ch: 19+165m) of Chitalmari-Fakirhat (Faltita) Road (Z-7801) under PMP (Mejor-Bridge/Culvert) Programme, under Road Division Bagerhat during the year 2024-2025. |
2024-2025 |
Bagerhat Division |
Bagerhat Division |
Revenue |
DON ENTERPRISE |
| 237 |
1057765 |
Periodic Maintenance Programme (PMP) of Rigid Pavement Work at Ch.8+200 to 9+700 & Ch. 17+000 to 17+250 Including RCC Retaining Wall, RCC U-Drain on Lalmai-Barura-Jhalam-Adda-Jagotpur Road (Z- 1401) under Road Division, Cumilla during the year 2024-2025. |
2024-2025 |
Cumilla Division |
Cumilla Division |
Revenue |
M/S Zaman Enterprise-J Enterprise (JV) |
| 238 |
1057767 |
Periodic Maintenance Programme (PMP Works) (Roads) for Providing DBS Wearing Course Including Strengthening by Aggregate Base Type-I and also Providing Monolithic Palasiding from Ch. 0+200 Km. to Ch.13+500 Km. of Cumilla-Palpara-Burichang-Brahmanpara-Mirpur Road (Z-1041) under Road Division, Cumilla during the year 2024-2025. |
2024-2025 |
Cumilla Division |
Cumilla Division |
Revenue |
M/S Zaman Enterprise-J Enterprise (JV) |
| 239 |
1057768 |
Periodic Maintenance Programme (PMP Works) (Roads) for Providing DBS Wearing Course Including Strengthening by Aggregate Base Type-II and also Providing Monolithic Palasiding from Ch.15+000 Km. to Ch. 21+700 Km. of Lalmai-Barura-Jhalam-Adda-Jagotpur Road (Z-1401) under Road Division, Cumilla during the year 2024-2025. |
2024-2025 |
Cumilla Division |
Cumilla Division |
Revenue |
M/S. R.P Construction Co. |
| 240 |
1065877 |
Construction of 31.828 m Long P.C Girder Amjhupi bridge at 9th (P) KM (Ch: 8+050m) of Mokamtola (Bogura-Rangpur National Highway)-Sonatola-Horikhali-Hatsherpur-Sariakandi Road (Z-5035) under Road Division Bogura during the year 2023-2024. |
2023-2024 |
Barguna Division |
Bogura Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 241 |
1043826 |
Periodic Maintenance Programme Construction of Boldakhal RCC Box Culvert extension at
39th km(p) (ch:38+400) of Dhaka(Jatrabari) - Cumilla (Mainamati) - Chattogram - Teknaf
Road (N-1) under Narayanganj Road Division during the FY 2023-2024. |
2023-2024 |
Narayanganj Division |
Narayanganj Division |
Revenue |
M/S. Hasmat & Brothers |
| 242 |
1058600 |
Construction of 4005.00m Rigid Pavement at Ch: 151+150 to 151+600 (Chanchra More to Chanchra fish Market), Ch: 157+000 to 157+450 (Rajarhat to Mahbub Brothers Camp), Ch: 161+800 to 162+400 (Eagle Filling Station), Ch: 165+750 to 165+900 (Ghunni Road More), Ch: 166+560 to 167+010 (Dolon Ghata Mosque), Ch: 169+300 to 170+085 (Basundia Fish Market), Ch: 171+000 to 171+620 (Prem Bag School) & Ch: 179+000 to 179+500 (Ferryghat Rail Crossing) of Dauladia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jashore-Khulna-Mongla (Digraj) National Highway (N-7) under Jashore Division during the year 2024-2025. |
2024-2025 |
Jessore Division |
Jessore Division |
Revenue |
Reliable Builders Ltd. |
| 243 |
1062837 |
Periodic Maintenance Programme (Roads) providing Strengthening flexible Pavement, DBS Base Course, DBS Wearing Course, Protective work & Other ancillary works from Ch. 68+500 (Bhanga Bazar Bus Stand: 23.384143, 89.982534) to Ch. 78+150 (Boroitala: 23.308582, 89.998277) & Widening Work from Ch. 74+865 (Chumurdi: 23.330520, 89.998872) to Ch. 78+150 (Boroitala: 23.308582, 89.998277) of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patuakhali (N-8) National Highway Road under Road Division, Madaripur during the year 2024-2025. |
2024-2025 |
Madaripur Division |
Madaripur Division |
Revenue |
Reliable Builders Ltd. |
| 244 |
1066001 |
Periodic Maintenance Programme work (PMP) work by Construction of Rigied Pavement, Strengthening, DBS Base course, DBS Wearing course, Protective work & Earthen shoulder work at Ch.18+500 km to 37+420 km of Hazigonj-Ramgonj-Lakshmipur (Z-1422) Road under Lakshmipur Road Division during the year 2024-2025. |
2024-2025 |
Lakshmipur Division |
Lakshmipur Division |
Revenue |
MAQ ENGINEERING LTD. |
| 245 |
1060315 |
Periodic Maintenance of Pavement by DBS-Wearing Course & Widening at Ch. 01+500 to Ch. 12+500 of Dinajpur-Khanpur Road (Z-5802) under Road Division, Dinajpur During the Year 2024-2025. |
2024-2025 |
Dinajpur Division |
Dinajpur Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 246 |
1066606 |
Construction of 28.76 m (1x27.44m) long P.C. Girder Bridge (Satpoa-2 / Diyarkrishnai Bridge) at Ch. 10+675 Km of Digpait-Sarishabari-Tarakandi Road (Z-4023) under Jamalpur Road Division during the year 2024-2025. |
2024-2025 |
Jamalpur Division |
Jamalpur Division |
Revenue |
M/S. R.P. Construction Co. and Md. Jamal Hossain-JV |
| 247 |
1060600 |
Periodic Maintenance Programme (PMP) work by Providing Strengthening, DBS-Wearing Course and Protective work From Ch. 0+000 (Madam Bridge) to End Ch.15+050 m (Dattapara college) of Lakshmipur-Dattapara-Chatkhil Road (Z-1510) under Lakshmipur Road Division During the year 2024-2025. |
2024-2025 |
Lakshmipur Division |
Lakshmipur Division |
Revenue |
MAQ ENGINEERING LTD. |
| 248 |
1058699 |
Periodic Maintenance Program (PMP) For Strengthening, Wearing Course, Earth work and Incidental Works at (Ch: 0+000 km to 13+500 km, Total Length = 13500.00 m) of Mirpur- Shehala-Pragpur BDR Camp Road (Z-7461) under Road Division Kushtia during the� year� 2024-2025. |
2024-2025 |
Kushtia Division |
Kushtia Division |
Revenue |
Dhrubo Construction Ltd. |
| 249 |
1029217 |
Construction of 24.75 m (2x12m) RCC Slab Bridge with both side Approach Road at 44th(43+700) km (Noyadingi) of Dhaka (Mirpur)- Utholi-Paturia National Highway (N-5) under Manikganj Road Division, during the year 2023-2024(PMP Bridge). |
2023-2024 |
Dhaka Circle |
Manikganj Division |
Revenue |
M/S. R.P Construction -NAKSHI STEEL BUILDING LIMITED-JV |
| 250 |
1055143 |
Surfacing by DBS-Wearing Course from Ch: 0+000 km to 16+107km Ttotal = 16107.00m with Partial Strengthening of Navaron Ilishpur-Satkhira Road (N-765) (Jashore Portion) through PMP/2024-25 (Road-Major) under Road Division, Jashore during the year 2024-2025. |
2024-2025 |
Jessore Division |
Jessore Division |
Revenue |
M/S Shamim Chaklader-M/S Biswas Construction (JV) |