Total Tenders: 1259
| 151 |
1065733 |
Construction of 44.02m (1 x 42.68m) Long PC Girder Bridge( Boalkhali Bridge) at 2nd KM (Ch: 01+465.50m) of Dighinala-Chotomerung-Chongrachari-Longudu Road (Z-1605) under Khagrachari Road Division during the year 2024-2025. |
2024-2025 |
Chottogram Circle |
Khagrachari Division |
Revenue |
RN Yakub & Brothers Private Limited. |
| 152 |
1060858 |
Periodic Maintenance Programme for Strengthening of Existing Flexible Pavement and Rigid Pavement from Ch. 6+300(Mallik Bari) to Ch.18+500(Araipara Bazar) of Bhaluka- Shakhipur Road (Z-3030) under Road Division Mymensingh during the year 2024-2025. |
2024-2025 |
Mymensingh Circle |
Mymensingh Division |
Revenue |
S. Ananta Bikash Tripura Limited |
| 153 |
1056414 |
Periodic Maintenance Program by Construction of Rigid Pavement, DBS Wearing Course, DBST and RCC Drain Construction fromCh. 00+400 Km to Ch. 12+250 Km of Jamalpur-Islampur-Dewanganj-Bahadurabad Ghat Road (R-465) and by Providing DBST Workfrom Ch. 126+572 Km to 146+305 Km of Joydebpur-Tangail-Jamalpur Road (N-4) under Jamalpur Road Division during the year2024-2025. [Location of Work: i) At. Ch. 00+400 Km (Tomaltola) to Ch. 12+250 Km (Malancha Mor) of Jamalpur-Islampur-Dewanganj-Bahadurabad Ghat Road (R-465)=11850.00 m. ii) At Ch. 126+572 Km (Digpait) to 146+305 Km (Doyamoyee Mor) ofJoydebpur-Tangail-Jamalpur Road=17733.00 m. (Excluding Rigid Pavement and Overpass Portion)] |
2024-2025 |
Jamalpur Circle |
Jamalpur Division |
Revenue |
M/S Zaman Enterprise-J Enterprise (JV) |
| 154 |
1040313 |
Construction of 34.880m (33.54mx1) Long P.C Girder Baribhanga Bridge at 13th. Km. (Ch:12+042m) of Lohagara-Nhata-Kalisankarpur-Mohammadpur Road(Z 7506) Under Road Division, Narail during the year 2023-2024. |
2024-2025 |
Jeshore Circle |
Narail Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 155 |
1054383 |
Periodic Maintance work under PMP (Road- Major) Providing milling, mixing recompact and DBS-Wearing Course work at Chainage 0+00 km (p) to 09+454 km (p) of Paksey(Ruppur)-Iswardi-Dasuria old section Road (N-705) under Pabna Road Division during the year 2024-2025. |
2024-2025 |
Pabna Circle |
Pabna Division |
Revenue |
M/S Mir Brothers |
| 156 |
1055170 |
Periodic Maintenace programe of Shepur-Sreebardi-Bakshinganj Road (Z-4607) by providing DBS-Wearing course with necessary repair, Rigid pavment & Protective work at Ch. 8+800 km (Kurikahnia Bazar) to 15+000 km (Matiakura) and at Ch. 21+000 km(Chonkanda) to 24+000 km(Bakshigonj) under Road Division Sherpur during the year 2023-2024 |
2024-2025 |
Mymensingh Circle |
Sherpur Division |
Revenue |
M/S Hasmat & Brothers |
| 157 |
1046917 |
Retrofitting work in 42.2m long RCC Bridge (Lalpool Bridge) including immediate Temporary Support System, Fire Affected Concrete Repairing , Replacement of fire affected Expansion Joint & Bearing Plate at 225th Km (Ch: 224 Km + 597m) on Dhaka (Jatrabari)-Cumilla- (Maynamoti) Chattogram-Coxbazar-Teknaf National
Highway (N-1) under Chattogram Road Division during the year 2024-2025. |
2024-2025 |
Chottogram Circle |
chottogram Division |
Revenue |
EPIC BUILDERS & ENGINEERING LTD. |
| 158 |
981735 |
Rehabilitation/Improvement by Earth Work, Construction of 4-lane Rigid Pavement, Road Median, Bus Bay, Intersection, Footpath cum Drain, RCC Culverts, Slope Protection with CC Block, Sign Signal, Road Marking etc. work at 64th (P) Km. to 68th (P) Km. (Ch: 63+735 to Ch: 67+535 ) of Sylhet-Sunamganj Road (R-280) under Road Division, Sunamganj of Road Zone Sylhet During the Year 2023-2024.
(Package # WP-06). |
2023-2024 |
Sylhet Zone |
Sunamganj Division |
Development |
Ohiduzzaman Chowdhury & M/S Janmabumi Nirmata (JON) JV |
| 159 |
1011603 |
Periodic Maintenance Programme (PMP-Roads) on Niamatpur-Tahirpur Road (Z-2806) from 10th Km (Barunka) to 17th (P) Km (Tahirpur) by Partial Reconstruction, Strengthing, Surfacing (DBS wearing course), Concrete slope protection, Earth work etc.as required under Road Division, Sunamganj of Road Zone Sylhet during the Year 2024-2025. |
2024-2025 |
Sylhet Zone |
Sunamganj Division |
Revenue |
M/S. Mostafa Kamal |
| 160 |
1062697 |
portion and Repair of Existing Flexible pavement with carpeting seal coat work under periodic maintenance program (PMP-Roads) (Ch: 15+500 to 26+500) of Kumira - Sandwip Road (Z-1025) under Chattogram Road division during the year of 2024-2025. |
2024-2025 |
Chottogram Circle |
chottogram Division |
Revenue |
M/S. Selim & Brothers |
| 161 |
1045017 |
Widening & Surfacing by DBS Wearing Course at 3rd KM to 20th KM, Construction of RCC Retaining wall and Drain at different KM of Khagrachari -Dighinala -Baghaihat- Sajek Road (Z-1603) under Khagrachari Road Division during the year 2024-2025. |
2024-2025 |
Chottogram Circle |
Khagrachari Division |
Revenue |
AS-RAS Trading (JV) |
| 162 |
1062698 |
Shape drain at Ch: 00+000 KM to Ch: 01+500 KM of Kumira -Sandwip District Highway (Z-1025) and Construction of Rigid Pavement, surfacing by DBS overlay, Construction of brick masonry U-Shape drain with ancillary works at Ch: 00+000 KM to Ch: 02+800 KM of kumira Old section Road (N-129) under Chattogram Road division during the year of 2024-2025. |
2024-2025 |
Chottogram Circle |
chottogram Division |
Revenue |
Taher Brothers Ltd. |
| 163 |
1050086 |
Construction of 47.072m. (45.732m. X 1) Long P.C. Girder (Poddobunia Bazar Bridge) at 14th Km. (Ch. 13+798.00m.) of Banaripara(Danduhat) Nazirpur Road (Z-7710), Under Barishal Road Division During the year 2023-2024. |
2024-2025 |
Barisal Circle |
Barishal Division |
Revenue |
Orient Trading & Builders Ltd. |
| 164 |
1044885 |
314+380, 315+860 to 316+380, 319+380 to 320+380, 322+380 to 322+500,323+080 to 323+420, 323+650 to 323+890, 327+620 to 328+000, 333+066 to 333+380, 341+080 to 341+380, 341+380 to 342+000, 342+670 to 344+380, 349+978 to 352+600, 353+100 to 354+100, 358+500 to 358+780, 359+680 to 361+250, 362+908 to 363+819, 373+060 to 374+649, 374+856 to 377+290,
377+800 to 378+513 and 379+782 to 380+377 km of Dhaka (Jatrabari)- Cumilla (Moynamoti)- Chattogram- Teknaf National Highway (N-1) under Coxs Bazar Road
Division during the financial year 2024-2025. |
2024-2025 |
Chottogram Circle |
Cox's Bazar Division |
Revenue |
Taher Brothers Ltd. |
| 165 |
1049901 |
Surfacing Work by DBS Wearing Course at Ch. 51.000(Mohismara) to 54.000(Sapchari) and 56.00(Deppochari) to 66.850(DC Banglow) km at Chattogram-Hathazari-Rangamati National Highway (N-106) under Rangamati Road Division during the financial year 2024-2025. |
2024-2025 |
Rangamati Circle |
Rangamati Division |
Revenue |
M/S. Selim & Brothers |
| 166 |
981734 |
Construction of 37.920 m ( 1 x 36.580 m ) long PC Grider Bridge (Salmara Bridge) at 15th Km (Ch. 14+295 m) & 82.090m ( 2 x 18.30 m + 1x42.680 m ) long RCC & PC Grider Bridge (Kukropushi Bridge, Ch.17+490 m) at 18th Km of Sunamganj -Jamalganj (R-370) Road and
Construction of 94.274 m. ( 30.488 m. x3) Long P.C Girder Mannargaon Bridges at 6th km (Ch. 05+787) and 02 Nos RCC Box Culvert at 1st & 4th km of Dowarabazar-Sunamganj (Z-2811) Road including Earth work, Construction of Approach Road, RCC Drain, Concrete Slope Protection With CC Block etc. with other ancillary work Under Road Division Sunamganj of Road Zone Sylhet During the Year 2023-2024.(Package # WP-09). |
2023-2024 |
Sylhet Zone |
Sunamganj Division |
Development |
M/S Kamrul & Brothers And M/S Islam Brothers Ltd (JV) |
| 167 |
1046915 |
Retrofitting of Existing Pier, Girder, Deck Slab with Microconcreting work, Replacement of Expansion Joint, Bearing Plate, Repair work by Chemical Bonding Agent, Overlay work with DBS Wearing Course and Providing Solar Street Light etc. for Chattogram Port Connecting Flyover at 12th Km of Chattogram Port Access Road (N-111) under Chattogram Road Division during the year 2024-2025. |
2024-2025 |
Chottogram Circle |
chottogram Division |
Revenue |
EPIC BUILDERS & ENGINEERING LTD. |
| 168 |
1043278 |
Construction of 40.97m. (1x39.634m) Long P.C Girder Lalpul Bridge at 1st km (Ch 0+673 ) on Borhanuddin-Udaypur -Tazumuddin-Monpura-Shikderhat Road (Z-8905) under Road Division Bhola during the year 2023-24. |
2023-2024 |
Barisal Circle |
Bhola Division |
Revenue |
EPIC BUILDERS & ENGINEERING LTD. - S.H.K Construction (Pvt) (Ltd.) (JV) |
| 169 |
1042835 |
Construction of 37.92m (1x36.58m) long P.C. Girder Bridge (Beparipara Bridge) at 11th Km. (Ch. 10+752 Km) on Bakshiganj-Sanandabari-Char Rajibpur Road (Z-4615)
under Jamalpur Road Division, Jamalpur. |
2024-2025 |
Jamalpur Circle |
Jamalpur Division |
Revenue |
M/S R.P Construction Co. |
| 170 |
1017014 |
Construction of 3 x 6.00 m (clear) length, 6.00 m (clear) height RCC Box Culvert with U-Type wing wall at Ch. 9+850 m (Somai Bazar) & Ch. 15+250 m (Gangnirpul) of Juri - Fultola - Batuli Road (Z-2823) and Construction of 1 x 5.00 m (clear) length, 4.00 m
(clear) height Box Culvert with U-Type wing wall at Ch. 0+110 m of Kulaura-Prithimpasha-Hajipur-Sharifpur (Link to Robirbazar Tilagaon) Road (Z-2822) under Road Division Moulvibazar during the year 2023-2024. |
2024-2025 |
Moulvibazar Circle |
Maulvibazar Division |
Revenue |
M/S. R.P. Construction Co.-EPIC BUILDERS & ENGINEERING LTD.-Md. Bellal Hossain-JV |
| 171 |
1056488 |
Periodic Maintenance Programme (Road-Major) for Widening, Strengthening, Double Bituminous Surface Treatment (DBST) & Dense Bituminous Surfacing -Wearing Course work at Ch: 17+500m (Talma) to Ch: 27+500m (Harukandi) of Bhanga-Faridpur(Goalchamot) (N-804) Road and Ch 0+000m (Rajbari Raster Mor) to Ch 5+500m (Munshi bazar) Of Faridpur Town by pass (N-808) Road under Faridpur Road Division Faridpur during the year 2024-2025. |
2024-2025 |
Gopalgonj Circle |
Faridpur Division |
Revenue |
Reliable Builders Ltd. |
| 172 |
981548 |
Construction of Flexible and rigid pavement from ch. 9+000 km to 17+000 km with different ancillary works including Construction of 3 nos (8.00m) RCC Box Culvert of Feni-Parshuram-Belonia road ( Z-1033) under Feni Road Division during the year 2023-2024( WP-2). |
2023-2024 |
Cumilla Circle |
Feni Division |
Development |
MCPL-MNHCL-JV |
| 173 |
980473 |
Construction of Flexible and Rigid pavement, including 3 nos (20.00 m span) RCC Box culvert with other ancillary work at Ch 12+200 m to Ch 22+000 m of Feni (Mohammad ali Bazar)-Chagolnia-Karerhat road Under Feni road Division During the year 2023-2024. |
2023-2024 |
Cumilla Circle |
Feni Division |
Development |
M/s Eden Prise-M/S. Mostafa Kamal JV |
| 174 |
1005402 |
Periodic Maintenance Programme (PMP) work Providing DBST including necessary Profile Correction, potholes repair on damage portion of existing pavement from Chainage 11+000 km to 29+500 km of Cumilla-Lalmai-Chandpur-Lakshmipur-Begumganj Road (R-140) under Road Division Cumilla, during the year 2024-2025. |
2024-2025 |
Cumilla Circle |
Cumilla Division |
Revenue |
RP-EPIC 2024 JV. |
| 175 |
1045243 |
Widening of pavement, Strengthening, DBS Base & DBS wearing course and Rigid Pavement from 197+734 to 204+000 km of Kashinathpur-Dasuria-Natore-Rajshahi Nawabgonj-Kansat-Sona Masjid- Baliadighi Border Road (N-6) under RHD Road Division Chapainawabganj during the year 2024-2025 (WP-01). |
2024-2025 |
Rajshahi Circle |
Chapainawabganj Division |
Development |
M/S A.S. Construction |
| 176 |
1041959 |
Periodic Maintenance Program Providing DBS Wearing Course Work (PMP- Major Road) at Ch. from 161th(p) to 162th(p),166th(p) to 168th(p), 169th(p) to 171th(p),
172th(p) to 174th(p), 175th(p) to 179th(p), 180th(p) to 182th(p), 185th(p) to 187th(p) 181th, 188th(p), 189th(p) & 190th(p)km of Kashinathpur-Dashuria-Natore-Rajshahi Nawabgonj-Kansat-Sona Masjid- Baliadighi Border Road (N-6) under RHD Road
Division Rajshahi During the year 2024-2025. |
2024-2025 |
Rajshahi Circle |
Rajshahi Division |
Revenue |
BISMILLAH BORSON & CO. |
| 177 |
1056487 |
Periodic Maintenance Programme (Road-Major) for Carriageway correction in different km with Strengthening using Base type-1 & DBS-Base Course through Dense Bituminous surfacing Wearing course Work at Ch.00+500 (Bhanga) to Ch.17+500 (Talma) of Bhanga - Faridpur(Goalchamot) (N-804) Road under Road Division, Faridpur during the FY 2024-2025. |
2024-2025 |
Gopalgonj Circle |
Faridpur Division |
Revenue |
Reliable Builders Ltd. |
| 178 |
1022046 |
Periodic Maintenance Programme by Partial Strengthening, DBS Base Course, DBS Wearing Course with necessary protective work and Earthwork at 23rd KM (Gobindaganj) to 46th KM (Dabor Point) (Ch. 23+089 to Ch. 23+200, Ch. 25+600 to Ch. 29+300, Ch. 30+150 to Ch.
30+450, Ch. 33+465 to Ch. 34+810, Ch. 34+830 to Ch. 36+650, Ch. 37+650 to Ch. 38+100, Ch. 38+900 to Ch. 40+000 & Ch. 43+200 to Ch. 44+100 of Sylhet-Sunamganj Road (R-280) under Road Division Sunamganj of Road Zone Sylhet during the Year 2024-2025. |
2024-2025 |
Sylhet Zone |
Sunamganj Division |
Revenue |
Md. Delwar Hossain Babul & Ceamac Engineering Ltd.(JV) |
| 179 |
1022557 |
Periodic Maintenance work under PMP(Road-Major) providing Strengthning at Ch. 35+300 to 35+600(Shachan West), Ch.36+100 to 36+400(Kakura Govt. Primary School), Ch.36+860 to 37+310(Dighirpar Bazar East),Ch. 37+900 to 38+300(Dighirpar Bazar West),Ch.38+900 to 39+400(Poilgram), Ch.40+150 to 40+500(Poilgram West),Ch. 40+700 to 41+082 (Shagoli Bazar East), Ch.41+400 to 41+806(Shagoli Bazar West), Ch.42+100 to 42+500(Boter Toli East),Reconstruction Work at 45+450 to 45+700 (Shahbag),47+750 to 47+900(Nijgram) & Wearing Course at Ch.35+600 to 36+100(Kakura), Ch. 36+400 to 36+860(Kakura), Ch. 36+310 to 36+900(Dighirpar Bazar ) ,Ch. 38+300 to 38+900 (Poilgram West), Ch.39+400 to 40+150(Poilgram), Ch.40+500 to 40+700(Poilgram
West), Ch 41+082 to 41+400(Shagoli Bazar), Ch 41+850 to 42+100(Shagoli Bazar West), Ch 42+500 to 43+900 (Boter Toli) Km, Road Marking Paint, Traffic Sign & Sign Post at Sylhet-Golapganj-Charkhai-Zakigang Road (R-250) under Sylhet Road Division, Sylhet of Road Zone Sylhet during the Year 2024-2025. |
2024-2025 |
Sylhet Zone |
Sylhet Division |
Revenue |
Oyster Construction and Shipping Company Ltd |
| 180 |
1049069 |
Periodic Maintenance Programe of Strengthening & DBS wearing course work at Mirzapur (Pakullah)-Delduar-Elasin Road (Z-4007) (Ch: 0+000 to 7+000) (Pakulla to Delduar) under Tangail Road Division during the year 2023-2024. |
2024-2025 |
Dhaka Circle |
Tangail Division |
Revenue |
M/S Bhuiyan Construction |
| 181 |
1048937 |
Periodic Maintenance Programme of Nagorpur (Duburia)-Solimabad-Chouhali (Z-4009) Road from 0+000 to 8+000 (Dhuburia to Vuter Mour) & 12+910 to 17+000 (Dewangonj to Bablatola) by providing Strengthening, DBS wearing course & Rigid Pavement under Tangail Road Division during the year 2023-2024. |
2024-2025 |
Dhaka Circle |
Tangail Division |
Revenue |
M/S Bhuiyan Construction |
| 182 |
1045156 |
Widening of Pavement, Strengthening, DBS Base & DBS Wearing Course, U-drain, Rigid Pavement, Intersection & Bus-bay from 204+000 to 211+000 km of Kashinathpur-Dasuria Natore-Rajshahi-Nawabgonj-Kansat-Sona Masjid- Baliadighi Border Road (N-6) under RHD Road Division Chapainawabganj during the year 2024-2025 (WP-2) |
2024-2025 |
Rajshahi Circle |
Chapainawabganj Division |
Development |
Don Enterprise & M/S A.S. Construction (JV) |
| 183 |
1045282 |
Widening of Pavement, Strengthening, DBS Base & DBS Wearing Course, Culvert Extension & Protective Work from 211+000 to 222+000 km of Kashinathpur- Dasuria Natore- Rajshahi- Nawabgonj- Kansat-Sona Masjid- Baliadighi Border Road (N-6) under RHD Road Division Chapainawabganj during the year 2024-2025 (WP-03). |
2024-2025 |
Rajshahi Circle |
Chapainawabganj Division |
Development |
Don Enterprise |
| 184 |
1005143 |
Periodic Maintenance Programme (PMP) by Strengthening Work, DBS Wearing Course,
Protective Work and Earth Work from Ch:54+000 (Bakila Bazar) to Ch: 70+178 (Bagadi Chowrasta) of Cumilla- Lalmai- Chandpur- Laxmipur-Begumgonj (R-140) Road under Road Division, Chandpur during the year 2024-2025. |
2024-2025 |
Cumilla Zone |
Chandpur Division |
Revenue |
M/S. Shahid Brothers-M/S OK Enterprise JV |
| 185 |
1005308 |
Earthwork, Widening, Surfacing (DBS-Base Course and Wearing Course) at 0+000 to 8+000 Km of Naogaon Town By Pass Road (R-542) under Road Division, Naogoan during the year 2023-2024 (WP-16). |
2024-2025 |
Rajshahi Circle |
Naogaon Division |
Development |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 186 |
1009580 |
DBS Wearing course with necessary Repair work at ch 0+000 to 3+700 km of Parshuram-Gathuma Road (Abdul Aziz B.A. Road) (Z -1038) Under Feni Road Division during the year 2024-2025. |
2024-2025 |
Noakhali Circle |
Feni Division |
Revenue |
M/S. Nur Nabi |
| 187 |
995474 |
Construction of 433.17 Meter long Shuvapur bridge over Feni river with others ancillary works at 32nd km of Feni (Mohammad Ali bazer) Chagolnia - Karerhat road (Z-1031) under Feni road division during the year 2023-2024. |
2023-2024 |
Chottogram Circle |
Feni Division |
Development |
Monico Limited |
| 188 |
1049171 |
Periodic Maintenance Program by Construction of Rigid Pavement from Ch. 01+630 Km to Ch. 01+860 Km of Jamalpur-Madarganj Road (R-461) & from Ch. 00+000 Km to Ch. 00+400 Km of Jamalpur-Islampur-Dewanganj-Bahadurabad Ghat Road (R 465) and by Providing DBS Wearing Course, Construction of Rigid Pavement, Construction of RCC Drain & Protective Work from Ch. 00+000 Km to Ch. 05+600 Km of Sarishabari Link (Pourosova) Road (Z-4030) under Jamalpur Road Division during the year 2023-2024. |
2024-2025 |
Mymensingh Circle |
Jamalpur Division |
Revenue |
M/S Bhuiyan Construction |
| 189 |
1004956 |
Construction of flexible and Rigid pavement from Ch. 17+000 km to 25+648 km with differente ancilliary works including Construction of 3 nos (9.00m) RCC Box Culvert of Feni-Parsuram-Beloniaroad under Feni Road Division during the year 2023-2024. |
2024-2025 |
Cumilla Zone |
Feni Division |
Development |
Western Engineering ( Pvt.) Ltd. |
| 190 |
1004189 |
Construction of flexible from Ch. 0+000 km to 9+000 km with different ancillary works including Construction of 3 nos (13.00m) RCC Box Culvert of Feni-Parsuram-Belonia road under Feni Road Division during the year 2023-2024. |
2024-2025 |
Cumilla Zone |
Feni Division |
Development |
Western Engineering ( Pvt.) Ltd |
| 191 |
1027798 |
Strengthening of Existing Pavement, DBS Base course, DBS Wearing course, Rigid Pavement, Construction of R.C.C Girder Bridge, Construction of P.C Girder Bridge, Construciton of R.C.C Box Culvert, Earth work in Road Embankment, Protective work by RCC Retaining Wall, Brick Toe wall, Cast-in-situ Palisiding, CC Block with Geotextile, Construction of Brick "U"-Drain & Saucer Drain, Installation of Overhead Sign, Sign Signal, Kilometer Post, Guide Post, Constuction of Bus Bay, Reflecting Road Studs, Deliniator-Reflector and Road Marking work from 1st KM to 12th KM (Ch: 0+000 to Ch: 12+000) of Eliotganj-Muradnagar-Ramchandrapur-Bancharampur (Z-1042) Road under Road Division Cumilla during the year 2023-2024. |
2024-2025 |
Cumilla Zone |
Cumilla Division |
Development |
Oyster Construction and Shipping Company Ltd.-Turna Enterprise (Pvt.) Ltd. (JV) |
| 192 |
981733 |
Rehabilitation/Re-construction/Improvement by Earth Work, Widening of Existing Flexible Pavement, Strengthening, Construction of New Flexible Pavement, Protective Work by CC Block etc. work at 37th (P), 38th, 39th, 40th, 41st, 42nd, 43rd, 44th, 45th, 46th & 47th (P) Km of Pagla-Jagannathpur-Raniganj-Aushkandi Road (R-241) under Road Division, Habiganj of Road Zone Sylhet during the year 2023-2024 (Package # WP-16 ). |
2024-2025 |
Sylhet Zone |
Habiganj Division |
Development |
Mir Habibul Alam & Mahabub Brothers (Pvt.) Limited JV. |
| 193 |
1046603 |
Periodic Maintenance programme (Major-Roads) for Reconstruction of Existing Damaged Pavement at Ch. 0+000 km to Ch. 1+600 km of Tottipur-Machpara Link Road (R-712) & Construction of DBST at Ch. 00+000 km to Ch. 7+700 km, Rigid pavement at Ch. 24+760 km to Ch. 24+840 km of Ahladipur-Rajbari-Pangsha-Kumarkhali-Kushtia (R-710) Road under Road division Rajbari during the year 2024-2025 |
2024-2025 |
Gopalgonj Zone |
Rajbari Division |
Revenue |
Orient Trading & Builders Ltd. |
| 194 |
1048969 |
Periodic Maintenance Programme (Major-Roads) Repair and Maintenance Works by DBST from 30+760 ( Badarpur) to Ch. 63+500 ( Kamarkhali ) of Daulatdia-Faridpur (Goalchamot) Magura-Jhenaidah-Jashore-Khulna-Mongla(Digraj) National Highway (N-7) under Road Division, Faridpur during the year FY 2024-2025. |
2024-2025 |
Gopalgonj Zone |
Rajbari Division |
Revenue |
Orient Trading & Builders Ltd |
| 195 |
1031336 |
Construction of 07 Nos Toll booths with Canopy (over 06 Nos Toll booths), Axle Load Control Station, Foundation of 01 new Static Weight Scale, Boundary Wall, and Widening of Road by Flexible Pavement & Rigid Pavement with Ancillary work at Daudkandi Toll Plaza at 39th km of Dhaka (Jatrabari)-Cumilla (Maynamati)-Chattogram-Teknaf Road (N-1) under Narayanganj Road Division during the FY 2024-2025. |
2024-2025 |
Dhaka Zone |
Narayanganj Division |
Revenue |
NAKSHI STEEL BUILDING LIMITED-M/s ISMAIL HOSSAIN-JV |
| 196 |
1003327 |
Surfacing by DBS Base Course and DBS Wearing Course at 461th (P) km to 472th (P) km of Dhaka (Mirpur)-Utholi-Paturia-Notakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha (N-5) (Panchagarh Portion) Road under Road Division Panchagarh during the year 2024-2025. |
2024-2025 |
Rangpur Zone |
Panchagarh Division |
Revenue |
INFRATECH-MOSTAFIZUR JV |
| 197 |
1007492 |
Periodic Maintenance Program (Road-Major) by providing Widening and Surfacing work at Ch.0+535 km to Ch. 2+214 km (Kamarer more to Seed Production Center), Ch. 2+804 km to Ch. 3+232 km (Abdullah Filling Station to Sathmatha), Ch. 6+450 km to Ch. 9+100 km (Nabdigonj Bazar to Bijoner Ghunti), Ch. 10+500 km to Ch. 11+100 km (Vorsha Partex to Mirbag), Ch. 14+170 km to Ch. 14+200 km (Bailey Bridge Approach), Ch. 14+600 km to Ch. 15+200 km (M/S. SS Auto Gas Filling Station), Ch. 18+406 km to Ch. 18+916 km (Kaunia Bazar) of Rangpur-Barabari-Kurigram (N-506) Road, under Road Division Rangpur during FY 2024-2025. |
2024-2025 |
Rangpur Zone |
Rangpur Division |
Revenue |
Md. Khairul Kabir Rana |
| 198 |
1004451 |
Construction of Rigid Pavement, Strengthening & Surfacing work at ch. 0+060 (Mahendronagar) to Ch. 5+550 (Mostofy) under PMP (Road Major) Programme of Mahendronagar-Mostofy Road (Z-5905) under Road Division, Lalmonirhat During the year 2024-2025. |
2024-2025 |
Rangpur Zone |
Lalmonirhat Division |
Revenue |
Md. Khairul Kabir Rana |
| 199 |
1043060 |
Widening of Pavement, Strengthening, DBS Base & DBS Wearing Course, U-Drain, Rigid Pavement, Intersection & Bus-bay Ch, from 10+510 to 10+980 km and 26+600 to 27+600 km of Baneswer-Sharda-Charghat-Bagha-Lalpur-Iswardi Road (R-606) under RHD Road Division Rajshahi during the year 2024-2025 (WD-12). |
2024-2025 |
Rajshahi Zone |
Rajshahi Division |
Development |
SHAMIM ENTERPRISE (PVT) LTD |
| 200 |
1027369 |
Periodic Maintenance Programme (PMP) for Surfacing work on Existing damaged Pavement surface by providing Polymer Modified Bitumen (PMB) wearing course and other ancillary work at 6+700m to 8+000m, 8+550m to 8+660m & 9+815 to 14+000 of Nabinagar-EPZ-Kaliakoir (Chandra) Road (N-540) under Manikganj Road Division During the Year of 2024-2025. |
2024-2025 |
Dhaka Zone |
Manikganj Division |
Revenue |
MAISHA CONSTRUCTION (PVT.) LTD. |