Total Tenders: 1368
| 101 |
1133900 |
New Construction/Re-Construction, Widening, Strengthening of Flexible
Pavement, Construction of Rigid pavement, Construction of Road
Embankment, Construction of Drain and Protective work from Ch. 14+000 to
Ch. 21+000 KM of Digpaith-Sarishabari-Tarakandi (Z-4023) Zilla Highway
under Jamalpur Road Division. (PW-3) |
2025-2026 |
Jamalpur Division |
Jamalpur Division |
Development |
BHAWAL ENGINEERS & CONSTRUCTION LTD. |
| 102 |
1133393 |
Construction of 2000.00m Rigid Pavement at Ch: 170+358 to 171+000
(Basundia Nita Group), Ch: 176+562 to 177+120 (Bhanga Gate, Noapara filling
Station), Ch: 179+848 to 180+248 (Noapara Bazar) & Ch: 182+300 to 182+700
(Akij City) of Daulatdia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jashore-
Khulna-Mongla (Digraj) National Highway (N-7) under Jashore Road Division
during the year 2024-2025 |
2024-2025 |
Jessore Division |
Jessore Division |
Revenue |
Rimi Nirman Ltd. |
| 103 |
1107789 |
Improvement of Dinmonibazar-Moulavibazar-Companirhat-Choto Feni
Nodi Road (Z-1508) at 10th Km (p) to 29th Km (p) (Ch. 9+205 to
28+325) and Sonagazi-Olamabazar-Chardarbeshpur-Companiganj
Road (Z-1434) at 6th Km (p) to 8th Km (p) (Ch. 5+800 to 7+280) to
Appropriate Standard with various Incidental works Under Noakhali
Road Division during the year 2024-2025 (PW-04). |
2024-2025 |
Noakhali Division |
Noakhali Division |
Development |
Reliable Builders Ltd. |
| 104 |
1076932 |
Construction of 31.198m (1 x30.488m) Long P.C Girder Charpara Bridge at 19th km (Ch.18+884.75m) on Amtali-Tailtupi-Alamdanga Road (Z-7404) under Road Division Jhenaidah during the year 2024-2025. |
2024-2025 |
Jhenaidah Division |
Jhenaidah Division |
Revenue |
Tender Validity Extension |
| 105 |
1076666 |
Construction of 25.74m (24.40m) Long P.C. Girder Bridge (Mali Barir Dorza
Bridge) at 11th km (Ch.10+548m) of Char Alexander - Ramgoti (Z-1413) Road
under Lakshmipur Road Division during the year 2024-2025. |
2024-2025 |
Lakshmipur Division |
Lakshmipur Division |
Revenue |
M/S. Selim & Brothers and Noor-Zaman Engineering Foundation JV4 |
| 106 |
1077782 |
Periodic Maintenance Programme (PMP) work by Strengthening, DBS Wearing
Course & Rigid Pavement at Ch.20+759m (Norinpur) to Ch.29+513m (Sonapur
Chowrasta) of Muddafarganj-Chitosi-Ramganj Road (Z- 1407) under Laxmipur
Road Division during the year 2024-2025. |
2024-2025 |
Lakshmipur Division |
Lakshmipur Division |
Revenue |
M/S. Selim & Brothers and Noor-Zaman Engineering Foundation JV1 |
| 107 |
1131376 |
Construction of Rigid Pavement at 1st Km (P) and Partial Strengthening with
DBS Wearing Course (Overlay) at 1st Km (P) to 10th Km (P) & 20th Km to
23rd Km (P) of Sonaimuri-Senbag-Kallandi Road (Z-1421) under Noakhali
Road Division during the year 2024-2025. |
2024-2025 |
Noakhali Division |
Noakhali Division |
Revenue |
Md.Mejanur Rahman and Noor-Zaman Engineering Foundation JV |
| 108 |
1108860 |
Improvement of connecting roads of Lakshmipur, Noakhali and Feni district with National Special Economic Zone (NSEZ) of Feni-Sonagazi-Muhuri Project Road (Z-1034) from 2nd (p) km to 19th (p) km to appropriate standard with different ancilliary works including Construction of 70.00m RCC Box Culvert under Feni Road Division during the year 2024-25. |
2024-2025 |
Feni Division |
Feni Division |
Development |
Mostufa Zaman Traders (Pvt) Ltd.-M/S. Nur Nabi JV |
| 109 |
1109338 |
Construction of Flexible and Rigid Pavement, including 1 nos
(6.00m span) RCC Box Culvert with other ancillary work at
different km Ch 0+000 m to Ch. 12+200 m of Feni
(Mohammad Ali Bazar)-Chagolnia-Karerhat road (Z-1031)
and Construction of Flexible and Rigid Pavement with other
ancillary works at different km Ch. 0+000 m to Ch. 2+749 m
of Feni Old Airport road (Z-1083) under Feni Road Division
during the year 2023-2024. |
2023-2024 |
Feni Division |
Feni Division |
Development |
BHAWAL ENGINEERS & CONSTRUCTION LTD. |
| 110 |
1135422 |
Construction of 28.780 m (1 x 27.44 m) long PC Girder
Bridge at 12th Km (Ch. 11+295.500 m, Palash Bridge -
2) of Sunamganj-Kachirgati-Bishambarpur Road (Z
2804) Periodic Maintenance Programme (PMPBridge/
Culvert) under Sunamganj Road Division of
Sylhet Road Circle during the year 2023-2024 |
2023-2024 |
Sunamganj Division |
Sunamganj Division |
Revenue |
Mohammed Eunus & Brothers (Pvt.) Ltd. |
| 111 |
1135421 |
Construction of 28.780 m (1 x 27.44 m) long PC Grider
Bridge at 16th Km (Ch.15+896.000m, Muktir khola
Bridge-02) of Sunamganj-Kachirgati-Bishambarpur
Road (Z-2804) under periodic Maintenance Programme
(PMP-Bridge/Culvert) under Sunamganj Road Division,
during the year 2023-2024. |
2023-2024 |
Sunamganj Division |
Sunamganj Division |
Revenue |
Mohammed Eunus & Brothers (Pvt.) Ltd. |
| 112 |
1139599 |
Construction of Rigid Pavement work in Different Chainage including Bazar
portion of Chatkhil-Chitoshi-Shaharasti (Kalibari) Road (Z-1430), Paniwala-
Dalta-Munshirhat-Chatkhil (Purbo Bazar) Road (Z-1417) & Lakshmipur-
Dattapara-Chatkhil Road (Z-1510) under Noakhali Road Division during the
Year 2024-2025 |
2024-2025 |
Noakhali Division |
Noakhali Division |
Revenue |
Rimi Nirman Ltd.-Noor-Zaman Engineering Foundation JV. |
| 113 |
1141457 |
Partial Strengthening with DBS wearing course (Overlay) and protective work
at 10th (P) Km to 13th (P) Km of Feni(Selonia)-Amubhuyarhat-Pratappur-
Senbag Road (Z-1443) and at 13th (P) Km to 17th (P) Km of Feni(Temohoni)-
Biroli Bazar-Sonaimuri(Gazirhat) Road (Z-1444) under Noakhali Road Division
during the year 2024-2025. |
2024-2025 |
Noakhali Division |
Noakhali Division |
Revenue |
Rimi Nirman Ltd.-Noor-Zaman Engineering Foundation JV. |
| 114 |
1136897 |
Widening of Pavement, Strengthening, DBS Base & DBS Wearing Course,
Rigid Pavement, Truck Lane, Border Gate At Sona Masjid Land Port & Sound
Barrier for Sonamosjid from 222+000 to 232+244 km of Kashinathpur-Dasuria-
Natore-Rajshahi-Nawabgonj-Kansat-Sona Masjid- Baliadighi Border Road (N-6)
under RHD Road Division Chapainawabganj during the year 2024-2025 (WP-
04). |
2024-2025 |
Chapainawabganj Division |
Chapainawabganj Division |
Development |
DON ENTERPRISE |
| 115 |
1143992 |
Construction of 03 nos P.C. Girder Bridge (Total Length=98.536m) of
31.828m(1x 30.488) Long Bridge Katasia Balukhali Bridge at 18th Km,
34.88m (1x33.54) Long Bridge (Chandpur Bridge at 20th Km), 31.828m
(1x 30.488) Long Bridge (Chandpur Bridge-II at 20th Km) of Mirsarai-
Fatikchari (Narayanhat) Road (Z-1021) Under Chattogram Road Division
During the year 2024-2025. |
2024-2025 |
chottogram Division |
chottogram Division |
Revenue |
M/S. Selim & Brothers |
| 116 |
1133397 |
DBS Wearing Course including Partial Strengthening at different km of
12(p), 13,14(p), 16(p), 17(p), 18(p), 19(p), 20(p), 21(p), 22(p) Kilometre
of Feni Sadar Elahigonj-Razapur-Koraishmunshi-Tulatoli (Dagonbhuiya)
Road (Z-1030) under Road Division Feni during the year 2024-2025. |
2024-2025 |
Feni Division |
Feni Division |
Revenue |
M/S. Nur Nabi & Masud Hi-Tech Engineering Ltd JV |
| 117 |
1060429 |
Periodic Maintenance Programme (PMP) work by Providing Strengthening
DBS wearing Course including Partial Strengthening by Base Type-1, RCC
Retaining Wall & Earthen shoulder at 1st km to 9th km(P) of Daserhat-Mandari
Road (Z-1432) Road under Lakshmipur Road Division during the year 2024-
2025. |
2024-2025 |
Lakshmipur Division |
Lakshmipur Division |
Revenue |
M/S. R.P. Construction Co. and Spark Vision Limited-JV |
| 118 |
1152396 |
DBS-Wearing Course, DBST including necessary Repair Works from Ch:
65+759 to 81+420 & Ch: 82+270 to 90+841 of Dauladia-Faridpur
(Goalchamot)-Magura-Jhenaidah-Jessore-Khulna-Mongla (Digraj) N-7 National
Highways & Maintenance Work of Existing Curve Portion by Aggregate Base
Type-1, DBS-Wearing Course, Protective work (R.C.C Palisiding), Earth Work,
Road Marking, Traffic Sign & Sign Post from Ch: 10+376 to 12+160, Ch:
21+972 to 22+272, Ch: 22+592 to 23+062, Ch: 23+262 to 23+880, Ch: 24+212
to 25+032, Ch: 26+732 to 27+417 & Ch: 27+938 to 28+392 of Magura-Narail
(R-720) Regional Highways under Road Division, Magura. |
2024-2025 |
Magura Division |
Magura Division |
Revenue |
UDC Construction Ltd. |
| 119 |
1142595 |
Construction of Remaining works of 4-Lane including median, footpath cum
drain, protective work, sign-signal, km post, road marking etc. at different
Chainage at 7th(P) Km to 14th(P) Km of Nalka-Sirajganj Road (R-451)
under Sirajganj Road Division during the year 2025-2026 (WP-4). |
2025-2026 |
Sirajgonj Division |
Sirajgonj Division |
Development |
Barendra Construction Ltd. |
| 120 |
1147934 |
Periodic Maintenance work under PMP(Road-Major) providing by
Reconstruction, DBS Wearing Course, Strengthening & Rigid Pavement Work
at Ch. 0+000 to 0+610, Ch. 2+817 to 4+100, Ch. 4+120 to 4+900, Ch. 4+920
to 6+200, Ch. 8+200 to 9+250, Ch. 10+050 to 10+300 & Ch, 11+050 to Ch.
12+425 Including Road marking, Traffic Sign, Sign Post of Vadeshwar-
Mirganj-Manikona-Fenchuganj Road (Z-2831) Under Road Division, Sylhet
During The Year 2024-2025. |
2024-2025 |
Sylhet Division |
Sylhet Division |
Revenue |
Mohammed Eunus & Brothers (Pvt.) Ltd. |
| 121 |
1084869 |
Construction of 882.81m Long (18 x 42.68m PC Girder + 1x100m Steel BUG
Truss) Rabnabad Bridge over Rabnabad River at 70th km. (Ch 69+289.265m.)
of Lebukhali-Bauphal-Golachipa-Amragachia Road (Z-8806) including 1.4 km
approch road, culvert, underpass, protective work, toll plaza and lighting Under
Patuakhali Road Division during the year 2023-2024. |
2023-2024 |
Patuakhali Division |
Patuakhali Division |
Development |
M. M. Builders & Engineers Ltd, M/S Janmabumi Nirmata & Ohiduzzaman Chowdhury (MNO) JV |
| 122 |
1069629 |
Widening, Strengthening, Surfacing, Construction of Rigid
Pavement, Hard Shoulder, 6 Nos. Different Size RCC Box Culvert,
Foot Over Bridge, Intersection, Bus Bay, side Road, Road Divider,
Protective work, Road Side Drain & Road Safety work at Ch.
107+895 to 117+000 of Comilla-Lalmai-Chandpur-Lakshmipur-
Begumganj Road (R-140) under Lakshmipur Road Division during
the year 2024-2025. |
2024-2025 |
Lakshmipur Division |
Lakshmipur Division |
Development |
Taher Brothers Ltd. |
| 123 |
1072762 |
Widening, Strengthening, Surfacing, Construction of Rigid
Pavement, Hard Shoulder, Foot Over Bridge, Intersection, Busbay,
Side Road, Road Divider, Protective work, Road Side Drain &
Road Safety work at Ch. 135+500 to 138+870 of Comilla-Lalmai-
Chandpur-Lakshmipur-Begumganj Road (R-140) under Noakhali
Road Division during the year 2024-2025 (PW-05). |
2024-2025 |
Noakhali Division |
Noakhali Division |
Development |
Reliable Builders Ltd. |
| 124 |
1130226 |
Construction of 38 nos (92.00 m) RCC Box Culvert with other ancillary works
for Road Pavement into appropriate standard & width from ch. 0+000 k.m to ch.
35+000 k.m of Cumilla (Balutupa)-Koneshtola-Suagazi-Bijoypur-Adinamura-
Amratoli (Z-1024) Road under Road Division Cumilla, during the year 2022-
2023 (for WD-03 of the DPP). |
2022-2023 |
Cumilla Division |
Cumilla Division |
Development |
S-U Consortium |
| 125 |
1134401 |
Periodic Maintenance Program (PMP) for Providing DBS wearing
course Including Road Marking, Sign Signal etc. from Ch. 000+000
(Amtoli Moor) to Ch. 12+026 (Bandra) of Amtoli-Khepupara-Kuakata
Road (R-881) Under Patuakhali Road Division during the year 2024-
2025. |
2024-2025 |
Patuakhali Division |
Patuakhali Division |
Revenue |
M/S Sadika Afia Simi-Dhaly Construction Ltd JV |
| 126 |
1126070 |
Construction of 17 nos (56.00 m) RCC Box Culvert with other ancillary works
for Road Pavement into appropriate standard & width from ch. 0+000 k.m to ch.
23+700 k.m of Sadar Daksin-Hazotkhola-Kolomia-Shanichou-Nurpur (Lalmai)
Road (Z-1023) under Road Division Cumilla, during the year 2022-2023 (for
WD-04 of the DPP). |
2022-2023 |
Cumilla Division |
Cumilla Division |
Development |
S-U Consortium |
| 127 |
1069630 |
Widening, Strengthening, Surfacing, Construction of Rigid
Pavement, Hard Shoulder, 5 Nos. Different Size RCC Box Culvert,
side Road, Road Divider, Protective work, Road Side Drain &
Road Safety work at Ch. 117+000 to 126+000 of Comilla-Lalmai-
Chandpur-Lakhmipur-Begumganj Road (R-140) under Lakshmipur
Road Division during the year 2024-2025. |
2024-2025 |
Lakshmipur Division |
Lakshmipur Division |
Development |
M.A.H. Construction Ltd.-M/S Rahman Engineering JV |
| 128 |
1077622 |
PMP work for Partial Strengthening, DBS Wearing Course & Protective works
at Ch.15+000 to 20+750 (Dattapara-Chatkhail) of Lakshmipur-Dattapara-
Chatkhil Road (Z-1510) under Noakhali Road Division during the year 2024-
2025. |
2024-2025 |
Noakhali Division |
Noakhali Division |
Revenue |
HREDI CONSTRUCTION LTD.- M/S MONI ENTERPRISE- M/S. SOHEL CONSTRUCTION-(JV) |
| 129 |
1062835 |
Periodic Maintenance work under PMP (Road-Major) providing Protective
work at different location from Ch. 3+400(Pachewti) to Ch. 15+000
(Gowainghat) of Shari- Gowainghat Road (Z-2012) under Sylhet Road
Division, Sylhet during the Year 2024- 2025 |
2024-2025 |
Sylhet Division |
Sylhet Division |
Revenue |
M/S Janmabumi Nirmata & Ohiduzzaman Chowdhury (JON) JV |
| 130 |
1072600 |
Widening, Strengthening, Surfacing, Construction of Rigid
Pavement, Hard Shoulder, RCC Box Culvert, Foot Over Bridge,
Intersection, Bus-bay, Side Road, Road Divider, Protective work,
Road Side Drain & Road Safety work at Ch. 126+000 to 132+500
of Comilla-Lalmai-Chandpur-Lakshmipur-Begumganj Road (R-140)
under Noakhali Road Division during the year 2024-2025 (PW-03). |
2024-2025 |
Noakhali Division |
Noakhali Division |
Development |
Reliable Builders Ltd. |
| 131 |
1135561 |
Re-construction of Flexible Pavement, Construction of Rigid pavement,
Construction of Bridge & Culvert and Protective work from Ch. 18+000 to Ch.
26+000 KM of Jamalpur (Madarganj)-Koyra-Mansurnagar (Kazipur)-Abdullah
More (Sarishabari)-Tangail (Dhanbari) Zilla Highway (Z-4029) under Jamalpur
Road Division (WP-3). |
2024-2025 |
Jamalpur Division |
Jamalpur Division |
Development |
BHAWAL ENGINEERS & CONSTRUCTION LTD. |
| 132 |
1133392 |
Construction of 2000.00m Rigid Pavement at Ch: 152+850 to 152+950 (Monir Filling Station), Ch: 153+400 to 153+500 (Chaklader Filling Station), Ch: 155+760 to 155+960 (Murali), Ch: 161+400 to 161+775 (Rupdia Bazar), Ch: 166+000 to 166+560 (Singia), Ch: 168+908 to 169+300 (Basundia) & Ch: 170+085 to 170+358 (Basundia Nita Group) of Daulatdia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jashore-Khulna-Mongla (Digraj) National Highway (N-7) under Jashore Road Division during the year 2024-2025 |
2024-2025 |
Jessore Division |
Jessore Division |
Revenue |
M/S Shamim Chaklader-M/S Biswas Construction (JV) |
| 133 |
1072068 |
Construction of 22.68m(1X21.34m) long R.C.C Girder Bridge (Barek Master Bari Bridge) at Ch.2+626.50 km of Kathalia(Bandhagatha)-Koikhali-Banaihat Road (Z-8740) under Jhalokati Road Division during the Year 2024-2025. |
2024-2025 |
Jhalokati Division |
Jhalokati Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 134 |
1077132 |
Construction of 25.74m(1X24.40m) long P.C Girder Bridge (Shere-Bangla Fajlul
Haq Primary Bridge) at Ch.3+962 km of Kathalia(Bandhagatha)-Koikhali-
Banaihat Road (Z-8740) under Jhalokati Road Division during the Year 2024-
2025. |
2024-2025 |
Jhalokati Division |
Jhalokati Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 135 |
1101449 |
Retrofitting Work HZ. Shahjalal Bridge & Lalabazar Bridge on
Dhaka(Katchpur)-Bhairab-Jagadishpur-Shaistaganj-Sylhet-Tamabil-Jaflong
Road (N-2) under Sylhet Road Division, Sylhet during the year 2024-2025 |
2024-2025 |
Sylhet Division |
Sylhet Division |
Revenue |
Chayon Associates - RM Construction JV |
| 136 |
1068730 |
Construction of 28.78m(1X27.44m Span ) long P.C Girder Bridge ( K.H.M High
School Bridge) at Ch.1+219.50 km of Kathalia(Bandhagatha)-Koikhali-Banaihat
Road (Z-8740) under Jhalokati Road Division during the Year 2024-2025. |
2024-2025 |
Jhalokati Division |
Jhalokati Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 137 |
1070252 |
Construction of 79.042m. (2x15.25m. R.C.C + 45.732 m. ) Long P.C Girder
Napitkhali Bridge at 32nd Km. (Ch. 31+558.00m) on Gariarpar-Banaripara -
Sharsina- Swarupkathi- Kawkhali- Naikathi- Road(Z-8033) Under Pirojpur Road
Division During the year 2024-2025. |
2024-2025 |
Pirojpur Division |
Pirojpur Division |
Revenue |
Orient Trading & Builders Ltd. |
| 138 |
1147064 |
Surfacing & Widening works under Periodic Maintenance
Programme (PMP) (Road -Major) providing by Aggregate Base
Type-I, DBS-Wearing Course & Rigid Pavement work at 21st
(p) to 29th (p) km of Dhunot-Nanglu-Baliadighi-Poradoho-
Panchmile-Gabtoli-Chowkirghat (Mokamtola) Road (Z-5072)
Under Road Division Bogura, during the year 2024-2025. |
2024-2025 |
Bogura Division |
Bogura Division |
Revenue |
M/S Jewel Electronics |
| 139 |
1132584 |
Replacement and retrofitting of expansion joint and Bearing with necessary
repair of Madhabpur Bridge at ch.04+812m, , Pukuria Bridge at ch.05+860m,
Basagari Bridge at ch.12+155m, Maniknagar Bridge at ch.17+730m, Bakhunda
Bridge at ch.22+820m of Bhanga-Faridpur (Goalchamot) National Highway (N-
804) under Road Division, Faridpur during the FY 2024-2025. |
2024-2025 |
Faridpur Division |
Faridpur Division |
Revenue |
Chayon Associates - Eclectic Limited JV |
| 140 |
1081307 |
Repair of Patuakhali Bridge Expansion Joint, Bearing Plate
replacement By Retrofitting work at Ch. 203+897 km of
Dhaka(Jatrabari)-Mawa-Bhanga-Barishal-Patuakhali Road (N-8)
Under Patuakhali Road Division during the year 2024-2025. |
2024-2025 |
Patuakhali Division |
Patuakhali Division |
Revenue |
EPIC BUILDERS & ENGINEERING LTD. |
| 141 |
1045105 |
Periodic Maintenance work under PMP(Road-Major) providing by
Strengthening, DBS Base Course & DBS Wearing Course Work including Road
Marking, Road Directional Overhead Gantry, One Side Cantilever, Traffic Sign
& Sign Post (From Kotalpur to Dakkhin Surma) at Ch. 40+615 to Ch. 42+159,
Ch. 42+200 to Ch. 42+700 , Ch. 43+200 to Ch. 43+835, Ch. 43+867 to Ch.
44+940, Ch. 44+974 to Ch. 46+517, Ch. 46+551 to Ch. 47+790, Ch. 47+818 to
Ch. 51+246 Km of Moulvibazar - Rajnagar -Fenchuganj -Sylhet (N-208) Road
Under Road Division, Sylhet During The Year 2024-2025. |
2024-2025 |
Sylhet Division |
Sylhet Division |
Revenue |
Mohammed Eunus & Brothers (Pvt.) Ltd. |
| 142 |
1028103 |
Construction of 103.430m (3x33.540m) long P.C. girder 2nd Kumedpur Bridge at 24 km (ch. 23+230m) on Sonahat Landport- Madarganj-Bhitarbandh-Nageshwari (Z-5624) Road under Kurigram Road Division, Kurigram during the year 2023-24 (WP-12B) |
2023-2024 |
Kurigram Division |
Kurigram Division |
Development |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 143 |
1084831 |
Construction of flexible pavement at Ch. 00+000 Km to Ch. 4+832 Km (Kurigram (Dasherhat) to Bir ProtikTaramon Bibi More ), 7 Nos single Vent RCC box culvert with U-type wing wall of different sizes,Dasherhat Intersection, Protective work & other supporting works of Improvement of Kurigram (Dasherhat)- Nageshwari-Bhurungamari Sonahat Landport (N-512) Project under Road Division, Kurigram during the year 2023-2024. (WP-01) (Ka) (Remaining works). |
2023-2024 |
Kurigram Division |
Kurigram Division |
Development |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 144 |
1125127 |
Construction of 94.274m (3X30.488m) Long PC Girder Bridge (Hatirdia Bridge) Old
Bhramopotru River at 42th Km on Mawna-Sreepur-Gosingha-Kapasia-Aral-
Sonmania-Hatirdia-Monohordi Road (R-313) Under Gazipur Road Division during
the year 2022-2023 [WP-06] |
2022-2023 |
Gazipur Division |
Gazipur Division |
Development |
RPCPL - MAF (JV) |
| 145 |
1122352 |
Emergency repair work by excavation, cutting, scarifying and recompact of existing bituminous layer including Surfacing work under Periodic Maintenance Program (PMP Road) at Ch:0+000 to 8+670 KM of Banani- Matidali Road (N-514) under Road Division, Bogura during the year 2024-2025. |
2024-2025 |
Bogura Division |
Bogura Division |
Revenue |
BHAWAL ENGINEERS & CONSTRUCTION LTD. |
| 146 |
1111958 |
4-Landing of 3.00 KM Panchagarh Town Portion Road of National Highway (N-
5) for Ensuring Road Safety under Division Panchagarh during the year 2023-
2024 |
2023-2024 |
Panchagarh Division |
Panchagarh Division |
Development |
RAB-RC (PVT) LIMITED. - MD. MOSTAFIZUR RAHMAN JV |
| 147 |
1077685 |
Construction of 31.828 m Long P.C Gider Badarpul bridge at 2nd (P) KM
(ch: 1+900m) of Mokamtola (Bogura-Rangpur National Highway)-Sonatola-
Horikhali-Hatsherpur-Sariakandi Road (Z-5035) Under Road Division,
Bogura During the Year 2024-2025. |
2024-2025 |
Bogura Division |
Bogura Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 148 |
1052057 |
Periodic Maintanance Program For DBS Wearing Course work at Ch. 24+300
(Chatrakanda, Pingri) to Ch.29+963(Rajapur Medical More) km of Barishal-
Jhalakathi-Pirojpur-Bagerhat-Khulna National Highways (N-807) (Jhalokathi
Part) & DBS Wearing Course work at Ch.0+000 (Rajapur Medical More) km to
Ch.12+347(Kanudaskathi) km of Rajapur-Bhandaria-Pirojpur Regional
Highways (R-870) (Jhalokathi Part) Road under Jhalokathi Road Division during
the year 2024-2025. |
2024-2025 |
Jhalokati Division |
Jhalokati Division |
Revenue |
Reliable Builders Ltd. |
| 149 |
1128780 |
Widening of Bazar Area, construction of drain, bus-bay and DBS Overlay at
Ch: 276+030 km. to Ch: 276+130 km., Ch:296+610 km. to Ch: 297+060 km.
(Padua Bazar) and Ch: 300+150 km. to Ch: 301+300 km (Lohagara-Amirabad)
of Dhaka (Jatrabari)- Cumilla (Moinamati)-Chattogram-Coxs Bazar-Teknaf
National Highway (N-1) under Chattogram South Road Division during the year
2024-2025. |
2024-2025 |
Chottogram South Division |
Chottogram South Division |
Revenue |
Masud Hi-Tech Engineering Ltd. |
| 150 |
1116657 |
Earth Work, Construction of Flexible Pavement, RCC Box Culvert (11 Nos) &
Bridge (1 Nos), Drain and Protective work from 41st (p) km (Ch.40+280m) to
49th (p) (Ch.48+600m) km of Bhulta-Araihazar-Bancharampur-Nabinagar-
Shibpur-Radhika R-203, (korikandi to Bancharampur - Nabinagar) under Road
Division, Brahmanbaria during the year 2024-2025. |
2024-2025 |
Brahmanbaria Division |
Brahmanbaria Division |
Development |
M/S. Md. Jamil Iqbal |