Total Tenders: 1259
| 1201 |
152269 |
Periodic Maintenance Programme (PMP) providing DBS-Wearing Course from Ch. 224+315 to Ch. 225+815 (Shambagat to Motro Brick), Ch. 232+815 to Ch. 237+785 (Vorshapur More to Bhaga Bazar) & Ch, 239+315 to Ch. 243+315 (Chairman More to Belai
Bridge) (Total Length = 10.47 Km) including Strengthening by Aggregate Base Type-I & DBS-Base Course at different km of Daulatdia-Faridpur(Goalchamot)-Magura-Jhenidah-Jessore-Khulna-Mongla (Digraj) National Highways (N-7) under Bagerhat Road Division, during the year 2017-2018. |
2017-2018 |
Khulna Zone |
Bagerhat Division |
Revenue |
Not Available |
| 1202 |
147975 |
Construction of Rigid Pavement and Raising of existing road at 9th (p) & 10th km of Nabinagar-DEPZ-Kaliakoir (Chandra) (N-540) Road under Manikganj Road Division during the year 2017-2018 (PMP(Road) 2017-2018). |
2017-2018 |
Dhaka Zone |
Manikganj Division |
Revenue |
Not Available |
| 1203 |
147976 |
Depressions, Cracks, Undulations Cutting by Milling Machine and filling by DBS (Base Course) & Providing 30mm Wearing Course at Ch.8+800 to Ch. 23+564 of Dhaka (Jatrabari) - Comilla (Mainamati) - Chittagong - Teknaf National Highway (N1) under Narayangonj Road Division during the year 2017-2018 (PMP(Road) 2017-2018). |
2017-2018 |
Dhaka Zone |
Narayanganj Division |
Revenue |
Not Available |
| 1204 |
125174 |
Periodic Maintenance Program (PMP) Providing DBS Wearing Course at 165+320 to 182+590km of Dhaka (Mirpur)-Uthuli-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldhanga-Banglabandha (N-5) Road, under RHD Road Division Sirajgonj during the year 2017-2018. |
2017-2018 |
Rajshahi Zone |
Sirajgonj Division |
Revenue |
Not Available |
| 1205 |
146829 |
PMP Works for Providing DBS Wearing Course including Profile Correction repaired by Aggregate Base Type-l with Potholes repair Construction of Brick Masonary Toe Wall and Soil Earthen shoulder from Ch. 0000 to Ch. 20000 of Feni-Sonagazi Road Z-1034 under Feni Road Division during the year 2017-2018. |
2017-2018 |
Cumilla Zone |
Feni Division |
Revenue |
Not Available |
| 1206 |
140340 |
PMP Works of Construction of 44.02 (1x42.68 M) Meter Long P.C Girder Bridge (Bolirpole Bridge) over Azmar Khal at 5th Km (Ch.4+996.86m) of Tamuruddin Link Road (Z-1438) under Noakhali Road Division during the year 2017-2018.
View |
2017-2018 |
Cumilla Zone |
Noakhali Division |
Revenue |
Not Available |
| 1207 |
147978 |
Widening with H.B.B work including Surfacing work at 1st km (p) and from 6th km to 18th km of Tongi-Ashulia-Zerabow-EPZ Road(N-302) Under Dhaka road Division During the Year 2017-2018 (PMP(Road) 2017-2018). |
2017-2018 |
Dhaka Zone |
Dhaka Division |
Revenue |
Not Available |
| 1208 |
146840 |
Periodic Maintenance Program of damaged road pavement by providing Aggregate Base Type - I ,DBS, Saucer drain & Cross Drain at Ch 0+000 to 10+000 km of Hajigonj-Ramgonj-Laxmipur Road Z-1422 under road Division Chandpur during the year 2017-2018. |
2017-2018 |
Cumilla Zone |
Chandpur Division |
Revenue |
Not Available |
| 1209 |
148084 |
Emergency Repair of N-5 Highway under periodic Maintenance Programme (PMP - Major) by Excavation, Cutting and Re-Compact of Existing Bituminous Layer & DBS Wearing Course at Different Locations of Dhaka (Mirpur)-Paturia-Bogra-Rangpur-Banglabandha (N-5) National Highway, under Road Division Bogra, during the year 2017-2018. |
2017-2018 |
Rangpur Zone |
Bogura Division |
Revenue |
Not Available |
| 1210 |
148132 |
Emergency repair of N-5 Highway under Periodic Maintenance Program PMP - Major by cutting excavation and re-compact of existing bituminous layers and DBS wearing course at different Km of Gaibandha Portion under Road Division Gaibandha during
the year 2017-2018. |
2017-2018 |
Rangpur Zone |
Gaibandha Division |
Revenue |
Not Available |
| 1211 |
125177 |
Periodic Maintenance Program (PMP) Providing DBS Wearing Course at Ch. 15+050 to 23+000 km of Ahamedpur-Baraigram-Curudaspur Road (Z-6015) under RHD Road Division Natore during the year 2017-2018. |
2017-2018 |
Rajshahi Zone |
Natore Division |
Revenue |
Not Available |
| 1212 |
139943 |
Periodic Maintenance Programme (PMP) providing DBS wearing course at Ch. 0+000 to 8+000 km of Bonpara-Gopalpur-Lalpur(Z-6014) Road and Ch. 0+000 to 7+000 km of Walia-Dayarampur-Sonapur-Shankerbhagerhat-Natore(Z-6011) Road under Road
Division, Natore during the year 2017-2018. |
2017-2018 |
Rajshahi Zone |
Natore Division |
Revenue |
Not Available |
| 1213 |
125176 |
Periodic Maintenance Programme by 50mm DBS wearing course with necessary repair from Ch. 59+057 (Chowmasia More) to 65+700 (Mullakuri More)= 6.643 km of Bogra-Naogaon-Mohadevpur-Patnitala-Dhamoirhat-Joypurhat Road (Naogaon Part) & Ch.
0+000 (Kathaltoli More) to 8+000 (Chokojir Bazar)=8.00 km of Naogaon-Atrai-Natore Road (R-548) under Road Division,
Naogaon during the year 2017-2018. |
2017-2018 |
Rajshahi Zone |
Naogaon Division |
Revenue |
Not Available |
| 1214 |
134936 |
Construction of 51.61 m (2 x 12.20m +1 x 24.40m) Long PC Girder Bridge (Latifpur Bridge) and Slab Repair of existing R.C.C Girder Bridge at 21st Km (Ch. 20+510) of Joydebpur-Mirzapur-Tangail Road (N-4) under Gazipur Road Division during the year 2017-2018(PMP(B&C) 2017-2018). |
2017-2018 |
Dhaka Zone |
Gazipur Division |
Revenue |
Not Available |
| 1215 |
139335 |
PMP (Major) work from Ch. 1+400 to Ch. 4+000 (Newmarket) to Bahadurpur) Ch. 5+300 to 6+800 (Amtola to Hasimpur) & Ch.13+000 to Ch. 22+566 (Labutola to Simakhali) of Jessore (Daratana) to Magura (Vinamore) Road (N-702) under Road Division, Jessore during the year 2017-2018. |
2017-2018 |
Khulna Zone |
Jessore Division |
Revenue |
Not Available |
| 1216 |
126655 |
Strengthening with Surfacing by DBS-Base Course & DBS-Wearing Course (including Black Spot improvement) from Ch. 0+000(jibonnagar) to 5+260 (Dattanagar) of Jibonnagar-Dattanagar Road (R-743) under Periodic Maintenance Programme/2017-2018(PMP/Roads) at Road Division Chuadanga, during the year 2017-2018. |
2017-2018 |
Khulna Zone |
Chuadanga Division |
Revenue |
Not Available |
| 1217 |
126657 |
Periodic Maintenance Programme (PMP) providing DBS-Wearing Course from Ch. 01+500 (Cadet Collage) to 02+750 (Gabal),Ch. 09+700 (Chadpur) to 12+200 (Chadpur), Ch. 14+000 (Garagonj) to Ch. 21+230 (Shekpara Bazar) of Jhenidah-Kushtia-Pakshey Ferry-Dasuria Road (Road No. N-704) under Road Division, Jhenidah during the year 2017-2018. |
2017-2018 |
Khulna Zone |
Jhenaidah Division |
Revenue |
Not Available |
| 1218 |
146320 |
Road (R211) and b) Construction of Rigid Pavement from Ch:16+890 to Ch:18+850 of Itna-Baraibari-Chamraghat Road (Z-3623)under Periodic Maintenance Programme under Kishoreganj Road Division during the year 2017-2018 |
2017-2018 |
Mymensingh Zone |
Kishoreganj Division |
Revenue |
Not Available |
| 1219 |
126270 |
Periodic Maintenance work under PMP(Road-Major) by providing Aggregate Base Type-1, DBS-Base Course & DBS Wearing Course from Ch.238+000 to Ch. 238+400 & Ch.242+050 to Ch. 244+300 of Dhaka(Kachpur)-Bhairab-Shayestaganj-Sylhet
Tamabail-Jaflong Road (N-2), from Ch. 1+560 to Ch. 4+260 of Ambarkhana - Shahidgaon - M. C. College - Tilagar Road (R-248)and Ch. 1+497 to Ch.1+797 Keane Bridge- Nayarpool Road (N-206) under Sylhet Road Division of Road Zone, Sylhet during the year 2017-2018. |
2017-2018 |
Sylhet Zone |
Sylhet Division |
Revenue |
Not Available |
| 1220 |
137993 |
Strengthening by Base Type-II, DBS Base Course, DBS Wearing Course and Rigid Pavement work at 1stkm to 12th km of Gabtoli-Showarighat (Badamtoli) Road (Z-5070) under Dhaka Road Division during the year 2017-2018 (PMP(Road) 2017-2018). |
2017-2018 |
Dhaka Zone |
Dhaka Division |
Revenue |
Not Available |
| 1221 |
131244 |
Repair of Damaged Pavement and Surfacing by DBS Wearing Course & Construction of Toe wall, Drain, Hard Shoulder at Curve Portion at 15th (P) KM to 37th (P) KM of Heakhon-Ramgarh-Jaliapara Road (R152) under Khagrachari Road Division during the
year 2017-2018. |
2017-2018 |
chottogram Zone |
Khagrachari Division |
Revenue |
Not Available |
| 1222 |
126271 |
Periodic Maintenance work under PMP(Road-Major) by providing Aggregate Base Type-1, DBS Wearing Course from Ch. 69+300- 69+590 , Ch. 70+090 - 70+880 , Ch.72+000 - 72+760 , Ch.73+730 - 74+150 and Ch.80+000 - 83+890 of Rajnagar - Kulaura -
Juri - Borolekha - Baroigram - Beanibazar - Shewla - Charkhai Road (R-281) under Sylhet Road Division and providing DBS
Wearing Course in/c Strengthening work from Ch. 16+000 - 18+800, Ch. 21+800 - 22+600, Ch. 23+000 - 24+000, Ch. 25+200 -
27+000, Ch. 37+000 - 37+225, Ch. 37+475 - 37+625, Ch. 37+825 - 39+000, Ch. 45+500 - 46+800 and Ch. 48+300 - 48+900 of
Rajnagar - Kulaura - Juri - Borolekha - Baroigram - Beanibazar - Shewla - Charkhai Road (R-281) under Moulvibazar Road Division of Road Zone, Sylhet during the year 2017-2018. |
2017-2018 |
Sylhet Zone |
Maulvibazar Division |
Revenue |
Not Available |
| 1223 |
131753 |
Periodic Maintenance by Providing Overlay Works at 30th km. to 58th km. of Rangamati (Ghagra) - Chandraghona - Bangalhalia -Bandarban Road (R-161) under Road Division, Bandarban during the year 2017-2018. |
2017-2018 |
chottogram Zone |
Bandarban Division |
Revenue |
Not Available |
| 1224 |
124871 |
Periodic Maintenance work under PMP(Road-Major) by providing Aggregate Base Type-1, DBS-Base Course & DBS Wearing Course from Ch.00+000 to Ch. 14+442 of Beer Muktijoddha Commandant Manik Chowdhury Road (R-221) under Habiganj Road Division of Road Zone, Sylhet during the year 2017-2018. |
2017-2018 |
Sylhet Zone |
Habiganj Division |
Revenue |
Not Available |
| 1225 |
126272 |
Periodic Maintenance work under PMP(Road-Major) providing Aggregate Base Type-1 & DBS-Wearing Course from Ch. 1+000 - 4+000, Ch. 5+425 - 7+000, Ch. 11+760 - 13+000 of Golapganj-Dhakadaskin-Vadeshwar Road (R-251) and providing
Resectioning, Strengthening & DBS-Wearing Course from Ch. 0+000 - 3+100, Ch. 7+700 - 9+400, Ch. 11+850 - 12+000, Ch.12+100 - 12+250, Ch. 14+370 - 14+470 , Ch. 15+250 - 15+330 and Ch. 15+738 - 15+838 of Daudabad-Daudpur-
Bhadeswar(Dhaka Dakshin) Road (Z-2832) under Sylhet Road Division of Road Zone, Sylhet during the year 2017-2018. |
2017-2018 |
Sylhet Zone |
Sylhet Division |
Revenue |
Not Available |
| 1226 |
130841 |
Construction of 34.88m (1 x 33.54) long PC Girder Bridge (Bordol Bridge) at 34th Km (Ch. 33+730m) on Mowna-Fulbaria-Kalijakoir-Dhamrai Road (R-315) under Gazipur Road Division during the year 2017-2018 (PMP (B&C) 2017-2018. |
2017-2018 |
Dhaka Zone |
Gazipur Division |
Revenue |
Not Available |
| 1227 |
125170 |
Periodic Maintenance by different types of repair with surfacing work by DBS wearing course in periodic maintenance programme
(PMP) at 158th to 159th, 161st to 171st & 173rd to 174th (Ch. 157+000 to 159+000, Ch. 160+881 to 171+000 & 172+000 to 174+000)=14.119km of Kashinathpur-Dasuria-Natore-Rajshahi-Nawabgonj-Kansat-Sonamosjid-Baliadighi Border Road (N-6)under RHD Road Division Rajshahi during the year 2017-2018. |
2017-2018 |
Rajshahi Zone |
Rajshahi Division |
Revenue |
Not Available |
| 1228 |
128173 |
Rehabilitation of pavement by providing DBS Base Course, Overlay and Hard Shoulder at different locations of Dhaka (Jatrabari)-
Comilla (Moinamoti)-Chittagong-Teknaf Road (N1) and rehabilitation of pavement by providing Base Type-1, DBS Base Course,
Overlay, Brick Masonry Toe Wall, Saucer Drain and Hard Shoulder at Different Locations (Ch: from 0+000 km to Ch: 8+000 km) of
Chakariya-Badarkhali Regional Highway (R-172) under Coxs Bazar Road Division during the financial year 2017-2018. |
2017-2018 |
chottogram Zone |
Cox's Bazar Division |
Revenue |
Not Available |
| 1229 |
125330 |
Strengthing of existing pavement by Base type-I, Surfacing work by Dense Bituminous Wearing Course at Ch.0+000m to 2+100m & Ch.9+000m to 13+750m on Padma-Bypass Road (Z-8205) and DBS overlay work with Strenthening different portion of Existing damaged pavement at Ch: 0 + 00m to 3+850m, 7+000 to 7+900, 8+100m to 8+800m & 13+800 to 14+200 of Dohar(Kartikpur)-Barra-Balirtake(Baria Bridge) Road (Z-8209) under periodic maintenance program of Munshigonj Road Division during the year 2017-2018 (PMP(Road) 2017-2018). |
2017-2018 |
Dhaka Zone |
Munshiganj Division |
Revenue |
Not Available |
| 1230 |
137987 |
PMP work by providing DBS wearing Course & Rigid Pavement from Ch. 0+000m to Ch. 20+038m of Netrakona– Madan–Khaliajuri Road (Z-3701) under Netrakona Road Division during the year 2017-2018. . |
2017-2018 |
Mymensingh Zone |
Netrokona Division |
Revenue |
Not Available |
| 1231 |
123982 |
PMP (Major) work for improvement of existing road by Strengthening of base type-I; 40mm DBS Wearing course, Protective work,Road sign, KM Post & Road marking from 1th km (Ch.0+000, Chandukhali) to 9th km (P) (Ch.8+700, Kaownia Bazar) of Barguna(Chandukhali)-Betagi-Bakergonj(Padrishibpur) Road (Z-8803) under Barguna Road Division during the financial year
2017-2018 |
2017-2018 |
Barishal Zone |
Barguna Division |
Revenue |
Not Available |
| 1232 |
137483 |
PMP Road-Major work of Rangpur Road Division a ) Rehabilitation strengthening & DBST work etc. at Ch. 5+ 800 Km to Ch. 21+460 of Rangpur-Barabari-Kurigram ( N-506) Road , b) DBST work at Ch. 50+060 Km to Ch. 59+150 Km of Gaibandha-
Sundargonj-Kadamtoli Pirgacha ( Z-5613 ) Road , c) Surfacing work by DBS wearing Course at Ch.0+000 Km to Ch. 3+900 Km of
Police line (Chiriakhana)-Jalkar-Sotapir-Pakarmatha Road (Z-5019) And For Lalmonirhat Road Division d) Surfacing work by DBS Wearing Course and Strengthening by aggregate Base Type-1 work at Ch. 20+830 Km to Ch.22+000 Km & Ch. 46+940 Km to Ch. 49+940 Km of Barabari-Lalmonirhat-Burimari National Highway (N-509) & e ) Surfacing work by DBS wearing Course at Approach of Tista Bridge & Ch. 34+590 Km to Ch. 37+740 Km of Rangpur-Barabari-Kurigram National Highway ( N-506 ) during the year 2017-18. |
2017-2018 |
Rangpur Zone |
Rangpur Division |
Revenue |
Not Available |
| 1233 |
124623 |
(i) Strengthening & DBS Wearing Course (Overlay) work at different Kilometer of Togra-Indurkani-Balipara-Kalaron-Saynnashi
Road (Z-7711) under Pirojpur Road Division during the year 2017-2018
(ii) Strengthening & DBS Wearing Course (Overlay) work at different Kilometer of Barguna (Dhankin Ramna Kheyaghat)
Dawatala-Mathabaria-Baromasua Road ( Z-8814) under Pirojpur Road division during the year 2017-2018
(iii) Overlay work at 1st to 3rd, 4th(p) to 5th(p) km & Strengthening work at 2nd(p) to 3rd(p) km of Shatpakia(Barisal-Jhalokati
Highway)-Nalcity Road (Z-8709) Through PMP (Road-Major) Under Jhalokati Road Division during the Year 2017-2018
(iv) Overlay work at 4th(p) to 9th(p) km & Strengthening work at 4th(p) to 6th(p) km of PirMoazzam Hossain (Baishakhia)-
Rajapur(Mirarhat) Road (Z-8062)Through PMP (Road-Major) Under Jhalokati Road Division during the Year 2017-2018 &
(v) Overlay & Strengthening work at 1st to 6th km of Amua-Mirukhali-Safa Road (Z-8815) (Jhalokati portion)Through PMP (Road-Major) Under Jhalokati Road Division during the Year 2017-2018. |
2017-2018 |
Barishal Zone |
Jhalokati Division |
Revenue |
Not Available |
| 1234 |
127750 |
Dense Bituminous Surfacing work from Ch. 41+169 to Ch. 52+069 (Charavita to Hamidpur) with 2.550km Strengthening of Bhatiapara-Kalna-Lohagara-Narail-Jessore Road (N-806) and Ch. 0+000 to Ch. 4+330 (Charavita to Bagherpara Bazar) with 1.105 Km Strengthening of Bagherpara Link Road (Z-7501) under Periodic Maintenance Programme (PMP-Road) of Road Division, Jessore during the year 2017-2018. |
2017-2018 |
Khulna Zone |
Jessore Division |
Revenue |
Not Available |
| 1235 |
129149 |
Construction of 43.39(1x42.68 m) Meter Long PC Girder Dudda Bridge at 11th KM of Bongaon - Nalitabari Road ( Z-4603) under Sherpur Road Division during the year 2017-2018. |
2017-2018 |
Mymensingh Zone |
Sherpur Division |
Revenue |
Not Available |
| 1236 |
129148 |
Construction of 173.00 m Long PC Girder Bridge replacing existing Motkhola Bailey Bridge over Arialkha River at 33rd km of Itakhola-Motkhola-Katiadi Road (R-211) under Kishoreganj Road Division during the year 2017-2018. |
2017-2018 |
Mymensingh Zone |
Kishoreganj Division |
Revenue |
Not Available |
| 1237 |
119536 |
Periodic Maintenance Program (PMP) providing DBS wearing Course of Comilla-Palpara-Burichong-Mirpur Road (Z-1041) from LRP Ch. 00 + 000 to LRP Ch. 12+200, (Working length = 8600 m) & Earth work, Strengthening and DBS Wearing Course from 1st to 8th(p) Km (Ch 0+000 to 7+800 Km) with Protective work (PMP Roads) at Rajachapitala-Ramchandrapur-Pachkitta (Z-1220)Road Under Road Division Comilla during the year 2017-2018. |
2017-2018 |
Cumilla Zone |
Cumilla Division |
Revenue |
Not Available |
| 1238 |
123846 |
Providing Strengthening by Aggregate Base Type-I; DBS-Base course & DBS Wearing course under PMP(Road-Major) at
LRP034c (Ch.35.195) to LRP041a+690 (Ch.41.995) of Barishal-Laherhat-Veduria-Bhola-Illisha-Maju Chowdhuryhat-Lakshmipur(Bhola Part) National Highways (N-809) under Bhola Road Division during the year 2017-2018 |
2017-2018 |
Barishal Zone |
Bhola Division |
Revenue |
Not Available |
| 1239 |
120386 |
Periodic Maintenance of Daulatdia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jessore-Khulna-Mongla(Digraj) Road(N-7) with Dense Bituminous Surface-Wearing Course including necessary repair works from Ch. 18+976m to 29+000m, Ch. 60+745m to 61+360m & Ch. 61+615m to 66+347m under Road Division, Faridpur during the year 2017-2018 (PMP Road). |
2017-2018 |
Gopalgonj Zone |
Faridpur Division |
Revenue |
Not Available |
| 1240 |
120384 |
Periodic Maintenance of Bhanga-Faridpur(Goalchamot) Road (N804) with Dense Bituminous Surfacing-Wearing Course including necessary repair works from Ch. 27+270m to 32+063m under Road Division, Faridpur during the year 2017-2018
(PMP Road). |
2017-2018 |
Gopalgonj Zone |
Faridpur Division |
Revenue |
Not Available |
| 1241 |
125329 |
Double Bituminous Surface Treatment work at 19th (P) km to 27th (P) km (Ch. 19 + 550 to 26+100 km) of Dhaka (Mirpur)-Utholi -
Paturia - Natakhola - Kashinathpur - Bogra - Rangpur - Beldanga - Banglabandh (Dhaka-Aricha) Road (N5) of Dhaka Road Division under Periodic Maintenance Program (PMP) during the year 2017-2018 (PMP(Road) 2017-2018). |
2017-2018 |
Dhaka Zone |
Dhaka Division |
Revenue |
Not Available |
| 1242 |
125327 |
Periodic Maintenance Program(PMP) work of Ekdaria - Puradia - Agarpur Road (R-212) at ch: 0+000m to 17+410m by surfacing & strengthening with DBS base Course & DBS wearing Course under Narsingdi Road Division During the Year 2017-2018 (PMP(Road) 2017-2018). |
2017-2018 |
Dhaka Zone |
Narsingdi Division |
Revenue |
Not Available |
| 1243 |
119531 |
PMP works for providing DBS Wearing Course from Ch.0+000 to Ch. 22+500 of Feni-Parshuram-Belonia Road(Z-1033) under Feni Road Division in the year 2017-18. |
2017-2018 |
Cumilla Zone |
Feni Division |
Revenue |
Not Available |
| 1244 |
125589 |
DBS-Wearing Course (av. 25mm) including repairing by Base Type-II of Damaged Hardshoulder under PMP (Road) at different location from 22nd (P) km to & 72nd (p) km of Dhaka (Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Bangladandh Road (N-5) (Manikganj part) under Manikganj Road division during the year 2017-2018 |
2017-2018 |
Dhaka Zone |
Manikganj Division |
Revenue |
Not Available |
| 1245 |
124446 |
Repair of existing pavement and DBS-Wearing Course work at Ch:0+00 to Ch:3+266 km of Fulbari Bus Stand- Dinajpur Govt.College Road(R-586), DBS-Wearing Course at Ch:0+00 to 1+500 km of Rangpur-Saidpur Road (N-518), Strengthening and
Surfacing at Ch: 0+00 to 2+550 km of Saidpur-Parbotipur Road (Z-5011) under Road Division Dinajpur & Nilphamari during the year 2017-2018 |
2017-2018 |
Rangpur Zone |
Dinajpur Division |
Revenue |
Not Available |
| 1246 |
124462 |
Periodic Maintenance Works by providing DBS-wearing course at 2nd(P) 4th(P) 5th(P) 6th 7th 8th & 9th(P) Km of Banani - Matidali
Road N-514 Strengthening(P) & DBS wearing course at 112nd(P) to 121st(P) K.M. of Bogra-Noagaon-Mohadebpur-Pothnitola-Dhamoirhat-Joypurhat Road Joypurhat portion R-545 and Strengthening(P) & DBS wearing course at Ch 5+500 to Ch 12+500km. of Bogra - Sariakandi Road Z-5032 under Road division Bogra & Joypurhat during the year 2017-2018. |
2017-2018 |
Rangpur Zone |
Bogura Division |
Revenue |
Not Available |
| 1247 |
119537 |
Periodic Maintenance Programme for Overlay Work at Ch.93+754m to 106+607m of Dhaka (Katchpur)-Bhairab-Jagadishpur-Shaistagonj-Sylhet-Tamabil-Jaflong road (N-2) under Brahmanbaria Road Division during the year 2017-2018. |
2017-2018 |
Cumilla Zone |
Brahmanbaria Division |
Revenue |
Not Available |
| 1248 |
123524 |
Improvement of Existing Pavement by Rigid Pavement and DBS overlay work at 28th Km to 37th Km of Madhupur-Mymensingh Road (N-401) under Road Division Mymensingh during the year 2017-2018. |
2017-2018 |
Mymensingh Zone |
Mymensingh Division |
Revenue |
Not Available |
| 1249 |
119265 |
PMP Works for DBS wearing course including potholes repair & Base repair by Aggregate Base Type-I at 20th (p) to 34th(p) km of Feni-Noakhali National Highway (N-104) under Noakhali Road Division in the year 2017-18. |
2017-2018 |
Cumilla Zone |
Noakhali Division |
Revenue |
Not Available |
| 1250 |
119526 |
PMP works for DBS Wearing Course at 15th K.M.(p) to 25th K.M. of Sonaimuri-Senbag-Kallandi Road (Z-1421) under Noakhali Road Division during the year 2017-2018. |
2017-2018 |
Cumilla Zone |
Noakhali Division |
Revenue |
Not Available |