Total Tenders: 1448
| 51 |
1206033 |
Preodic Maintenance Programme for Box Flling with ISG, Sub-Base,
Strengthening & Surfacing work at Shapahar-Agradigun-Dhamoirhat (Z-5468)
Road (Ch:000+720 to 7+000 under Road Division, Naogoan during the year
2024-2025 |
2024-2025 |
Naogaon Division |
Naogaon Division |
Revenue |
RAB-RC (PVT) LIMITED |
| 52 |
1189110 |
Construction of a 37.92m PC Girder Bridge (Zonail Bazar Bridge) at Ch.
08+469 Km of Chatmohor-Zonail-Baraigram Road (Z-6029) under Natore road
Division during the the year 2025-2026. |
2025-2026 |
Natore Division |
Natore Division |
Revenue |
Dhaly Construction Ltd. |
| 53 |
1189109 |
Construction of a Bridge (LAL-DAL-ON Bridge) ( 3x27.44m PC Girder) at 40th
Km (Ch. 39+408) of Bogura(Jahangirabad)-Natore Road (N-502) under Natore
Road Division during the year 2025-2026. |
2025-2026 |
Natore Division |
Natore Division |
Revenue |
REZVI CONSTRUCTION LTD. |
| 54 |
1189108 |
Construction of a Bridge (Foliar Bridge) ( 3x27.44m PC Girder) at 41th Km
(Ch. 40+752) of Bogura(Jahangirabad)-Natore Road (N-502) under Natore
Road Division during the year 2025-2026. |
2025-2026 |
Natore Division |
Natore Division |
Revenue |
REZVI CONSTRUCTION LTD. |
| 55 |
1212513 |
Periodic Maintenance Programme by
Construction/Reconstruction of Approach Road including
Concrete Slope Protection, RCC Retaining Wall/Toe
Wall, Saucer drain/U-Drain, Earthwork, Sign-Signal etc.
work at Ch. 49+620 Km to Ch. 49+920 Km (Sadarpur
Bridge Sylhet End) & Ch. 49+980 Km to Ch. 50+280
Km (Sadarpur Bridge Sunamganj End) of Sylhet-
Sunamganj Road (R-280) under Road Division
Sunamganj during the Year 2024-2025. |
2025-2026 |
Sunamganj Division |
Sunamganj Division |
Revenue |
Ohiduzzaman Chowdhury |
| 56 |
1176984 |
Repairing Damaged Pavement under Periodic Maintenance Programme (PMP)
by Providing Aggregate Base Type-I, DBS Wearing Course, Construction of
Rigid Pavement, R.C.C Toe Wall & Earth work at Ch. 26+700 to 33+100 km of
Kaligonj (sherkul)-Naldangerhat-Surkutia Bazar (Z-5210) Road under Road
Division Natore during the year 2025-26. |
2025-2026 |
Natore Division |
Natore Division |
Revenue |
M/S. Kohinoor Enterprise |
| 57 |
1231565 |
Supply of Motorcycle Ambulance under Bangladesh Road Safety Project
(DGHS Part) |
2025-2026 |
Office of the Project Manager, DGHS Part, Bangladesh Road Safety Project. |
Office of the Project Manager, DGHS Part, Bangladesh Road Safety Project. |
Development |
ACI Motors Limited |
| 58 |
1211770 |
Periodic Maintenance of Pavement with DBS Wearing Course including
necessary repair of pavement distresses, construction of surface drains (saucer
drains, cross drains), protective works, sign-signal works, and earthwork from
(a) Ch. 00+000 to Ch. 00+700 & Ch. 1+276 to Ch. 13+668 of Bancharampur-
Homna Road (Z-1043) and (b) Ch. 36+467 to Ch. 48+195 of Eliotganj-
Muradnagar-Ramchandrapur-Bancharampur Road (Z-1042) under Road
Division, Brahmanbaria under the PMP (Major-Roads) Programme for FY
2025-2026. |
2025-2026 |
Brahmanbaria Division |
Brahmanbaria Division |
Revenue |
Hassan Techno Builders Ltd. |
| 59 |
1175772 |
Periodic Maintenance Programme of Rigid Pavement at Ch. 104+200m. to
104+512m. and DBS Wearing Course including Partial Strengthening at Ch.
96+200m. to 98+000m., Ch. 98+800 Ch. 99+200m., Ch. 100+850m. to Ch.
104+200m., Ch. 104+512m. to 105+200m. by Base Type-l & Earthen Shoulder
of Cumilla-Lalmai-Chandpur-Lakshmipur-Begumgonj Road (R-140) under
Lakshmipur Road Division during the year 2025-2026 |
2025-2026 |
Lakshmipur Division |
Lakshmipur Division |
Revenue |
Hassan Techno Builders Ltd. |
| 60 |
1221136 |
Periodic Maintenance Providing DBSWC work at Ch. 0+000 (Wapda Point) to
Ch. 13+500 (Rajnagar College Point) including Partial Strengthening work at
Ch. 1+100 to Ch. 1+500, Ch. 09+600 to Ch. 09+750, Ch. 11+000 to Ch.
11+300 and Saucer Drain & Sign-Signal, KM posts etc of Moulvibazar -
Rajnagar - Fenchuganj - Sylhet (N-208) Road under Road Division, Moulvibazar
during the year 2025-2026. |
2025-2026 |
Maulvibazar Division |
Maulvibazar Division |
Revenue |
Ohiduzzaman Chowdhury |
| 61 |
1181226 |
Surfacing work with DBS Wearing Course, Retaining wall and slope protection
at Ch-0+000 (Rahmatpur) to 7+495 (Mirgonj Ferry Gat) Ch-20+950 (Nobaber
Hut) to 24+000 (Muladi Bridge) Ch-24+572 (Kauria Bazar) to 35+830 (Hizla
Bustand) of Rahmatpur-Babugonj-Muladi-Hizla Road (Z-8034) under Barishal
Road Division During the year 2023-2024. |
2025-2026 |
Barishal Division |
Barishal Division |
Revenue |
M/S Atique Construction |
| 62 |
1172222 |
Periodic Maintenance Programme (PMP) for Strengthening by
DBS Wearing Course, R.C.C Palasiding (Monolithic) & Earth
Work at Ch: 00+000 to Ch: 05+160 of Chandra-Haimchar (Z-
8699) Road under Road Division, Chandpur during the year
2025-2026. |
2025-2026 |
Chandpur Division |
Chandpur Division |
Revenue |
Hassan Techno Builders Ltd. |
| 63 |
1171916 |
Periodic Maintenance Programme (PMP) by Providing DBSWearing
Course, Strengthening & Rigid Pavement from 47+500
(Hajigonj Bazar) to 54+000 (Bakila) of Cumilla-Lalmai-Chandpur-
Lakshmipur-Begumganj Road (R-140) Road under Road
Division, Chandpur during the year 2025-2026. |
2025-2026 |
Chandpur Division |
Chandpur Division |
Revenue |
Hassan Techno Builders Ltd. |
| 64 |
1205517 |
Repair & Retrofitting work of 250.00m length Atrai Bridge at Ch. 387+514
km & 29.17m length Kantnagar Bridge at Ch. 398+016 km of Dhaka
(Mirpur)-Utholi-Paturia- Natakhola-Kashinathpur-Bogura-Rangpur-
Beldanga- Banglabandh Road (N-5) and 76.60m length Tulshigonga
Bridge at Ch. 38+471 km & 225.30m length Mohanpur Bridge at Ch.
88+866 km of Gobindagnj-Goraghat-Birampur-Fulbari-Dinajpur Road (R-
585) Under PMP(Major-Bridge) Under Road Division, Dinajpur during the
year 2024-2025. |
2024-2025 |
Dinajpur Division |
Dinajpur Division |
Revenue |
EPIC BUILDERS & ENGINEERING LTD. |
| 65 |
1213463 |
Construction of 44.02m (1x42.68m) long P.C. Girder Bridge (Jamira Bridge) at
19th Km. (Ch. 18+100 Km) of Jamalpur (Madarganj)-Koyra-Mansurnagar
(Kazipur)-Abdullah More (Sarishabari)-Tangail (Dhanbari) Zilla Highway (Z-
4029) under Jamalpur Road Division. |
2025-2026 |
Jamalpur Division |
Jamalpur Division |
Revenue |
M/S Jewel Electronics-M/S.A. S CONSTRUCTION-JV |
| 66 |
1205281 |
Periodic Maintenance of Lohagara Bazar-Naragati Road (Z-7503) with
Widening, Strengthening, Dense Bituminous Surfacing-Wearing Course including
necessary Protective Work (R.C.C Palisiding), Earth Work, Road Marking,
Traffic Sign, Sign Post Works from Ch. 17+000m to 22+000m under Road
Division Narail during the year 2024-2025. |
2025-2026 |
Narail Division |
Narail Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 67 |
1181221 |
Periodic maintenance Program (PMP) for partial strengthening by Aggregate
Base Type-1, DBS Base Course & DBS-Wearing Course from Ch. 00+000
(Bakergonj Bus Stand) to 11+765 (Tin Ghor) of Bakergonj-Padrishibpur-
Kathaltoli-Subidkhali-Barguna Road (R-872) under Barishal Road Division
during the year 2024-2025. |
2025-2026 |
Barishal Division |
Barishal Division |
Revenue |
Md. Mahfug Khan Ltd |
| 68 |
1176588 |
Periodic Maintenance Programme for Construction of 37.92m (1x36.58m) Long
P.C Girder Kalihati Bridge at 80th km (Ch. 79+018m) on Joydebpur-Tangail-
Jamalpur (N-4) Road, under Tangail Road Division during the year 2025-2026. |
2025-2026 |
Tangail Division |
Tangail Division |
Revenue |
Turna Enterprise (Pvt.) Ltd. |
| 69 |
1177772 |
Periodic maintenance Program (PMP) for DBS wearing course from
Ch.170+830 (End of Dopdopia Bridge Toll Plaza) to Ch.172+971 (Hiron Point)
and Construction of "RCC U Drain" at Ch.172+380 (End of Dopdopia Bridge)
to 172+800 (Culvert at Hiron Point) of Dhaka(Jatrabari)_Mawa-Bhanga-
Barishal-Patuakhali Road (N-8) & DBS Wearing Course at Ch.00+00 Km.
(Hironpoint) to Ch.04+830 Km. ( Kowyar Char Zero Point) of Barishal-Bhola
Link Road (N-801) Under Barishal Road Division During the year 2025-2026. |
2025-2026 |
Barishal Division |
Barishal Division |
Revenue |
Md. Khairul Kabir Rana |
| 70 |
1191659 |
Construction of 44.020m (1x42.680) Long P.C Girder 'Kuniary Bridge' at 23th
Km (Ch: 22+781m) of Goriarpar -Banaripara -Sharshina -Swarupkathi -
Kawkhali -Naikathi (Z-8033) Road Under Pirojpur Road Division during the year
2025-2026. |
2025-2026 |
Pirojpur Division |
Pirojpur Division |
Revenue |
MOZAHAR ENTERPRISE (PVT.) LTD. |
| 71 |
1177760 |
Periodic Maintenance Program with DBS Wearing Course, Retaining Wall,
Concrete Slope Protection & RCC Palisiding at 0+900 (Charfession Bazar) to
7+000 (Betua Launchghat) of Charfession-Betua Road (Z-8909) under Bhola
Road Division during the year 2025-2026. |
2025-2026 |
Bhola Division |
Bhola Division |
Revenue |
M/S. Shahid Traders |
| 72 |
1176587 |
Construction of 31.828m (1x30.488m) Long P.C Girder Karatia Bazar Bridge at
2nd km (Ch. 1+990 Km) on Karatia Bazar Portion Road (N-408) under Road
Division Tangail, during the year 2025-2026. |
2025-2026 |
Tangail Division |
Tangail Division |
Revenue |
M.A.H. CONSTRUCTION LTD. |
| 73 |
1177216 |
Construction and Improvement of Tankabati-BaroAwlia Road (Z-1013) under
Bandarban Road Division during the Year 2025-2026 (PW-03). |
2025-2026 |
Rangamati Circle |
Bandarban Division |
Development |
M/S. M.A. ENGINEERING |
| 74 |
1196176 |
Extra Widening by Flexible Pavement, Extra Widening by Rigid Pavement,
Construction of 01 (One) Nos 44.02m (1 x 42.68m) Long P.C Girder Bridge
(Kakraid Bridge), Extention of 04 (Four) Nos Culvert & Necessary Sign-Signal
of Madhupur-Mymensingh National Highway (N-401) under Tangail Road
Division during the year 2025-2026 (WP-07) |
2025-2026 |
Tangail Division |
Tangail Division |
Development |
M/S. Das Traders |
| 75 |
1176286 |
Periodic Maintenance Program by Construction of Rigid Pavement,
Strengthening & Surfacing with DBS Wearing Course from Ch. 00+100 Km
(Fulbaria Upzilla Mor) to 00+540 Km (Fulbaria Bazar), Ch. 00+690 Km to
04+500 Km (Koiiarchala), Ch. 13+300 (Asim Bazar) to 14+450 (Asim Bazar
College Mor) and Ch. 17+000 (Kalairpar) to 29+000 (Boger Bazar) of Fulbaria-
Asim-Sankivanga-Boger Bazar Road (Z-3032) under Mymensingh Road
Division during the year of 2025-2026. |
2025-2026 |
Mymensingh Division |
Mymensingh Division |
Revenue |
M/S. Das Traders |
| 76 |
1176105 |
Periodic Maintenance Programme by Repairing and providing DBS Wearing
Course and other ancillary works at Ch.32+665 (Mothkhola) to 45+114 (Katiadi)
of Itakhola-Motkhola-Kotiadi Road (R-211) under Kishoreganj Road Division,
Kishoreganj during the year 2025-2026. |
2025-2026 |
Kishoreganj Division |
Kishoreganj Division |
Revenue |
M/S. Das Traders |
| 77 |
1177527 |
Periodic Maintenance Program for DBS Base Course & DBS Wearing Course
including Strengthening by Aggregate Base Type-I at Ch. 10+500 Km (
Kawalipara ) to 16+000Km ( Syed Mor ) of Kalampur Bus Stand - Kawalipara -
Balia Warshai - Mirzapur Road ( R- 503) Under Manikganj Road Division during
the year 2025- 2026. |
2025-2026 |
Manikganj Division |
Manikganj Division |
Revenue |
MAISHA CONSTRUCTION (PVT.) LTD. |
| 78 |
1178540 |
Periodic Maintenance Programme (PMP Major Bridge/Culvert) for Re-
Construction of 01 No. 31.828m Long P.C Girder Bridge (Hiron) at
Ch:15+567m on Tungipara-Kotalipara (Majbadi) Road (Z-8430) under
Gopalgonj Road Division, Gopalganj. during the Year 2023-2024. |
2023-2024 |
Gopalganj Division |
Gopalganj Division |
Revenue |
Masud Hi-Tech Engineering Ltd. |
| 79 |
1177503 |
PMP (Major-Bridge) work for Construction of 01 Nos P.C Girder Bridge
(Kangsur Bridge) 44.02m(1x42.68m) Long Span at 27th km (Ch: 26+000m) on
Takerhat-Gopalganj(Horidaspur)-Mollahat(Ghonapara) Road (R-850) under
Road Division Gopalganj during the fy 2025-2026. |
2025-2026 |
Gopalganj Division |
Gopalganj Division |
Revenue |
MD. MOYENUDDIN (BASHI) LIMITED |
| 80 |
1157673 |
Periodic Maintenance Programme for Construction of Rigid Pavement, HBB
work & DBS-Wearing Course from Ch. 0+895m to Ch. 5+000m of Hasnabad
Intersection to Pangaon Container Terminal Road (N-810) under Munshigonj
Road Division during the year 2024-2025. |
2024-2025 |
Munshiganj Division |
Munshiganj Division |
Revenue |
Tanvir Constructions Ltd. |
| 81 |
1177476 |
Periodic Maintenance Programme (PMP)((Major Road) providing Repair with
Dense Bituminous Surfacing wearing course, Cunstruction of Rigid pavement
and Earth work at Ch. 321+670 to 329+880 km (Modern More to Chack Ghor)
of Dhaka (Mirpur)-Utholi-Paturia- Natakhola-Kashinathpur- Bogura-Rangpur-
Beldanga- Banglabandha Road (N-5) under Road Division, Rangpur during the
year 2025-2026. |
2025-2026 |
Rangpur Division |
Rangpur Division |
Revenue |
Baset Prokousholi Limited |
| 82 |
1175639 |
Periodic Maintenance Programme of DBS -Wearing Course work for hard
Shoulder, Earthwork etc. at Ch-31+420 Το 66+420 Km of Rajshahi-Nawhata-
Chowmasia (R-685) Road Under Road Division, Naogaon During the Year
2025-2026. |
2025-2026 |
Naogaon Division |
Naogaon Division |
Revenue |
S. Ananta Bikash Tripura Limited |
| 83 |
1170681 |
Dense Bituminous Surfacing- Wearing Course, Repair of potholes & Earthwork
under Periodic Maintenance Programme (PMP-Roads) From Ch. 63+290 km
(Jaliaghata) to 67+890 (Kalmegha) km of Rajapur- Kathalia- Amua- Bamna-
Patharghata Road (Z-8708) under Barguna Road Division During the year
2023-2024. |
2023-2024 |
Barguna Division |
Barguna Division |
Revenue |
Md. Mahfug Khan Ltd |
| 84 |
1187467 |
Construction of 111.260m (3x36.58m) Long P.C. Girder Bridge Khoyar Mor
(Rohonpur) Bridge at 1st km (Ch. 0+579) on Rohonpur(Khoyar Mor)-Bangabari
Road (Z-6802) under Chapainawabgonj Road Division during the year 2025-
2026. |
2025-2026 |
Chapainawabganj Division |
Chapainawabganj Division |
Revenue |
Mohammed Eunus & Brothers (Pvt.) Ltd. |
| 85 |
1176124 |
Preiodic Maintenance Programme (PMP) For 4 Lane Rigid pavement Work at
Ch. 49+900 Km to 50+300 Km = 400.00m (Khoksha), Ch. 58+400 Km to
59+000 Km = 600.00m (Kumarkhali) & Ch. 66+230 Km to 66+430 Km =
200.00m (Syed Masood Rumi Bridge Toll Plaza), Sub Total = 1200.00m=1.2
Km & 2 lane Rigid Pavement at Syed Masood Rumi Bridge Approch both End
Ch. 65+162 Km to 65+402 Km =240.00m & Ch 65+908 Km to 66+088 Km =
180.00m, Sub Total = 420.00M Total = 1.62 Km of Ahaladiupur-Rajbari-
Pangsha-Kumarkhali-Kushtia (Chourhas) Road (R-710) Under Road Division
Kushtia During The Year 2025-2026. |
2025-2026 |
Kushtia Division |
Kushtia Division |
Revenue |
Hassan Techno Builders Ltd. |
| 86 |
1172058 |
Periodic Maintenance (PMP) Road for Rigid Pavement and RCC U Drain work
at (Ch: 10+700 to 12+700 = 2000.00m) of Bheramara-Daulatpur (Z-7411)
Road under Road Division, Kushtia during the�??�?� year�??�?�
 2025-2026 |
2025-2026 |
Kushtia Division |
Kushtia Division |
Revenue |
Masud Hi-Tech Engineering Ltd. |
| 87 |
1174897 |
PMP Work for Strengthening by Aggregate Base Type-1 at severely damaged
portion, Rigid Pavement at Bazar Portions, HBB Work, Protective and Earth
Work, Surfacing by Premix Bituminous Carpeting with seal coat, Road Marking
and Sign-Signal work at 1st Km ((Jahajmara) to 10th Km (P) (Moktaria Ghat)
of Hatia (Jahajmara)- Moktaria Ghat Road (Z-1455) under Noakhali road
Division during the year 2025-2026. |
2025-2026 |
Noakhali Division |
Noakhali Division |
Revenue |
S. Ananta Bikash Tripura Limited |
| 88 |
1177769 |
Excavation, Cutting, Breaking, Mixing, adding required materials for proper
gradation and recompact of existing bituminous layer (partial) by Milling
Machine,Profile Correction by Bituminous Materials Partial Strengthening,
Surfacing (DBS Wearing Course), Sign Signal, Km post, Guide Post, RCC
Pailsiding & Road Marking work at Ch. 0+000 (Magura Stadium Gate) to
14+326 (Sripur Bazar) = 14326.00m of Magura-Sripur Road (Z-7011) under
Periodic Maintenance Programme (PMP-Road) under Road Division Magura
during the Financial Year 2025-2026. |
2025-2026 |
Magura Division |
Magura Division |
Revenue |
Hassan Techno Builders Ltd. |
| 89 |
1177837 |
Widening of existing pavement and DBS overlay from Chainage-298+470m
(Rajghat)) to Chainage-300+150m (Start of Amirabad Bazar) and Chainage-
301+300m (End of Amirabad Bazar) to Chainage-306+970m (Green View) at
Dhaka(Jatrabari)-Cumilla(Moinamati)-Chattogram-Coxsbazar-Teknaf National
highway (N-1) under Chattogram South Road Division during the year 2025-
2026. |
2025-2026 |
Chottogram South Division |
Chottogram South Division |
Revenue |
M/S. M.A. ENGINEERING |
| 90 |
1177264 |
Surfacing Work by DBS Overlay at 1st to 15th(p) Km., Rigid Pavement
work at 6th (p) Km.,7th (p) Km., 12th (p) Km. & 13th (p) Km., Protective
work & Drain work at Raojan-Noapara (Jelepara) Zilla Highway (Z-1629)
under Chattogram Road Division during the year of 2024-2025. |
2024-2025 |
chottogram Division |
chottogram Division |
Revenue |
M/S. Selim & Brothers |
| 91 |
1186457 |
Surfacing Work by DBS Wearing Course at different km (P) from Ch: 36+000
km (Ramdas Hat) to Ch:56+848(Toitong) km of Patiya-Anowara-Banshkhali-
Toitong-Chakaria(Eidmoni) Regional Highway(R-170) under Chattogram South
Road Division during the financial year 2025-2026. |
2025-2026 |
Chottogram South Division |
Chottogram South Division |
Revenue |
Hassan Techno Builders Ltd. |
| 92 |
1163693 |
Construction of Rigid Pavement, U-drain with Utility Duct at Ch. 0+117 km
(Shapla Chattar) to Ch. 1+900 km (Taramon Bibi Mor) of Kurigram-
Nageshwari-Bhurungamari-Sonahat Landport Road (N-512) Under Road
Division, Kurigram During the year 2024-2025. |
2024-2025 |
Kurigram Division |
Kurigram Division |
Revenue |
Md. Khairul Kabir Rana |
| 93 |
1177730 |
PMP (Major-Bridge) work for Construction of 01 Nos P.C Girder Bridge
(Pachuria Bridge) 25.74m(1x24.40m) Long Span at 39th km( Ch: 38+082m) of
Takerhat-Gopalganj (Haridaspur)-Mollahat (Ghonapara) Road (R-850) under
Road Division Gopalganj during the fy 2025-2026. |
2025-2026 |
Gopalganj Division |
Gopalganj Division |
Revenue |
Masud Hi-Tech Engineering Ltd. |
| 94 |
1179307 |
Widening of Road Embankment by Earth work, widening (2X1.60m) of
Existing Pavement, Road Surfacing by DBS (9.30m width), RCC Drain,
Protective work, Sign-signal, KM post, Road Marking work from Chainage
13+500 (Dharartek) to 17+500 (Zia Nagor) of Chattogram (Mohora)-
Chandragona Regional Highway (R-163) under Chattogram Road Division
during the year 2025-2026. |
2025-2026 |
chottogram Division |
chottogram Division |
Revenue |
Mohammed Eunus & Brothers (Pvt.) Ltd. |
| 95 |
1177305 |
Periodic Maintenance of Pavement by DBS Wearing Course at 1st, 2nd,
3rd, 4th(p) & 5th km and Construction of Rigid Pavement work at 4th(p),
7th(p), 9th(p) & 10th(p) km of Birampur (Bijon)-Hakimpur Road (Z-5854)
under Road Division, Dinajpur during the year 2025-2026. |
2025-2026 |
Dinajpur Division |
Dinajpur Division |
Revenue |
Hassan Techno Builders Ltd. |
| 96 |
1171905 |
Periodic Maintenance Programme (PMP) Construction of 25.74m
(24.40m) Long P.C Girder Bridge (Nabiyabad-01 Bridge) at 2nd km
(Ch. 1+020m) of Chandina-Debidwar (Z-1008) Road under Cumilla
Road Division during the year 2025-2026. |
2025-2026 |
Cumilla Division |
Cumilla Division |
Revenue |
Rimi Nirman Ltd. |
| 97 |
1175710 |
Periodic Maintenance Programme by Providing DBS Wearing Course &
Protective work at Ch: 2+320 (Bhabanipur) Km to 11+400 Km (Zero Point )
Birishiri-Bijoypur Land Port Road (Z-3705) under Netrakona Road Division
during the year 2025-2026 |
2025-2026 |
Netrokona Division |
Netrokona Division |
Revenue |
Md. Khairul Kabir Rana |
| 98 |
1175711 |
Periodic Maintenance Program by Providing DBS-Wearing Course, Traffic
Signs, Construction of Rigid Pavement & Box Drain (05 Nos.-1.00mx1.00m) at
Ch. 0+000KM (Avoypasha) to 7+000KM (Atpara) of Avoypasha- Atpara Road
(Z-3713) under Netrakona Road Division during the year 2025-2026 |
2025-2026 |
Netrokona Division |
Netrokona Division |
Revenue |
Md. Khairul Kabir Rana |
| 99 |
1181396 |
Construction of 1x45.732m Long PC Girder Bridge (Ahsan Bridge) at Ch.
56+990 to Ch. 57+033 of Bogura (Jahangirabad) - Natore Road (N- 502) under
Natore road Division during the the year 2024 -2025. |
2024-2025 |
Natore Division |
Natore Division |
Revenue |
Dhaly Construction Ltd. |
| 100 |
1176118 |
Periodic Maintenance work under PMP-Major (Road) providing Milling,mixing
and recompact & Dense Bituminous Surfacing (DBS) Wearing Course at Ch.
28+800 km to 31+000 km, ch.32+800 to 39+100 km & Ch. 40+400 to 46+600
of Kasinathpur-Dasuria-Natore-Rajshahi-Nawabganj-Kansat-Sonamasjid-
Baliadighi Border (N-6) Road under Pabna Road Division during the year-2025-
2026. |
2025-2026 |
Pabna Division |
Pabna Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |