Total Tenders: 1397
| 901 |
605798 |
PMP (Road - Major) works providing 40mm DBS wearing course including Aggregate Base Type-I, Protective Work etc. from Ch: 8+200 (Shibganj Bazar) to 23+500 (Manda Ferry Ghat ) = 15.300 K.M. of Enayetpur- Mohadevpur-Patakhatahat-Manda (Z-5463) Road under Road Division ,Naogaon during the year-2021-2022. |
2021-2022 |
Rajshahi Zone |
Naogaon Division |
Revenue |
Not Available |
| 902 |
610411 |
(a) Surfacing by DBS-Wearing Course from Ch. 4+000Km to Ch. 13+700Km (Chuadanga Jail to Dugdugi Bazar) Total 9700.00m of Chuadanga-Darshona-Jibonnagar-Kotchandpur-Kaligonj Road (R-
748) under Chuadanga Road Division. (b) Partial Strengthening & DBS-Wearing Course from Ch. 50+780Km to 65+880Km (Dudhsora to Kaligonj) Total 15100.00m of Chuadanga-Darshona-Jibonnagar-Kotchandpur-Kaligonj Road (R-748) under Jhenaidah Road Division. |
2021-2022 |
Khulna Zone |
Jhenaidah Division |
Revenue |
Not Available |
| 903 |
604477 |
(1)Reapir by Base Type-II & Overlay work at 6th to 12nd km (Ch. 6+000 to 12+000) of Bhandaria-Paikkhali-Kathalia (Z-8705) (2) Repair Existing pavement and Overlay work at 1st & 2nd km (Ch. 0+000 to 2+000) of Amua Bridge Approch Road (Z-8710) (3) Rehabilitation work by Overlay with 40mm DBS wearing course including furnishing Road Marking at 1st km to 7th km of Jhalokati-Kirtipasha-Swarupkhati Road (Z-8716) (4) Rehabilitation work by Overlay with 40mm DBS wearing course including furnishing Road Marking at 1st(P) km. of R-870 Link Road (Petrol Pump to Gurudham Bridge) Road (Z-8707) & (5) Strengthening of existing pavement & Overlay work at 1st km (Ch. 0+000 to 1+000) of Dapdapia Puraton Ferryghat Road (Z-8050)Through PMP under Jhalokati Road Division during the Year 2021-2022. |
2021-2022 |
Barishal Zone |
Jhalokati Division |
Revenue |
Not Available |
| 904 |
601487 |
Periodic Maintenance works under PMP-Major (Road) at Ch. 0+000 to 9+500 of Paksey (Ruppur)-Iswardi-Dasuria Road (N705), Ch. 22+480 to 26+600 of Pabna-Paksey(EPZ) Road (R603) and Ch. 0+000 to 18+850 of Madhpur-Santhia-Bera Road (Z6026) (Pabna Part) Road under Pabna Road Division, during the year 2021-2022. |
2021-2022 |
Pabna Circle |
Pabna Division |
Revenue |
Not Available |
| 905 |
606065 |
Construction of RCC Retaining wall , HBB Pavement & Toll Box Building at Ch.191.725 to Ch. 192.075 (Sherpur Bridge Toll Plaza) of Dhaka (Katchpur)-Bhairab-Jagadishpur-Shaistaganj-Sylhet-Tamabil-Jaflong Road (N-2) under Sylhet Road Division of Road Circle Sylhet during the year 2021-2022. |
2021-2022 |
Sylhet Circle |
Sylhet Division |
Revenue |
Not Available |
| 906 |
619845 |
Periodic Maintenance Programme (PMP) Providing Partial Strengthening by Aggregate Base Type-I, Repairing by Sub-base and Surfacing with DBS work & Protective work at. Ch. 8 + 000 to 18 +200 Km of Cumilla-Salda-Kosba (Soyadabad) Road (N-114) under Road Division Cumilla during the year 2021-2022. |
2021-2022 |
Cumilla Circle |
Cumilla Division |
Revenue |
Not Available |
| 907 |
608087 |
Periodic Maintenance Programme (Bridge/Culvert) for Construction of 50.12m (1x48.78m) Long P.C Girder Bridge (Bajja Bridge) at 14th Km (Ch.13+600m) of Bharadoba -Sagordighi -Bhuanpur Road (Z-3037) under Mymensingh Road Division During the Year 2021-2022. |
2021-2022 |
Mymensingh Circle |
Mymensingh Division |
Revenue |
Not Available |
| 908 |
622986 |
Re-Construction of 44.020 m (1x42.68m) long PC Girder Bridge (Karoi Bari Bridge) at 22nd km (Ch. 21km+075.00m) on Companigonj-Nabinagar (Z-1206) Road, under Road Division, Brahmanbaria during the year 2021-2022. |
2021-2022 |
Cumilla Circle |
Brahmanbaria Division |
Revenue |
Not Available |
| 909 |
595614 |
Periodic Maintenance Programme PMP for Rigid Pavement at different Km of Bogura-Naogaon-Mohadevpur-Patnitala-Dhamoirhat-Joypurhat R-545 Road & Herring Bond Brick HBB Protective Work etc at
different Km of Naogaon-Badalgachi-Patnitala-Shapahar-Porsha-Rahanpur R-547 Road under Road Division Naogaon during the year 2020-2021. |
2020-2021 |
Rajshahi Zone |
Naogaon Division |
Revenue |
Not Available |
| 910 |
611355 |
Construction of Rigid Pavement from CH: 8+575 To 09+450 = 875.00 m of Feni (Mohammad ali bazar)-Chhagalnaiya Korerhat Road (Z-1031) (Dhaka-Chottogram old Highway) under Feni Road Division, during the year 2021-2022 Under PMP (Road-Major) Program. |
2021-2022 |
Noakhali Circle |
Feni Division |
Revenue |
Not Available |
| 911 |
606241 |
Rehabilitation of existing pavement by DBS Wearing Course under Periodic Maintenance Program at 21st km to 41st km (Ch-20+100km to 40+100km) and protective work by RCC retaining wall at 26th and 27th km of Chiringya (Fasiakhali) - Lama- Alikadam Road (Z-1005) under Bandarban Road Division during the Year 2021-2022. |
2021-2022 |
chottogram Zone |
Bandarban Division |
Revenue |
Not Available |
| 912 |
555749 |
Pavement ReconstructionRigid Pavement Construction Pavement Widening & Strengthening Earthwork Protective workR.C.C Box Culvert ConstructionDrain constructionRoad Marking Sign-Signal etc work at 1stP km to 7thP km Ch.00000 to 07000 under raising of road embankment with Pavement Reconstruction & Widening at Singra portion of Singra-Gurudaspur- Chatmohor Z-5209 Road under Road Division Natore during the year 2020-2021. DPP Package No.-01. |
2021-2022 |
Rajshahi Zone |
Natore Division |
Development |
Not Available |
| 913 |
603139 |
Periodic Maintenance Providing Rigid Pavement work at Ch. 0+030Km (Night Chowmohona) to Ch. 0+750km (Juri Bazar), Ch. 0+800Km (Juri Bazar) to Ch. 1+400Km (Juri Food Godown) of Juri-Lathitila Road (R-282) under Road Division, Moulvibazar during the year 2021-2022. |
2021-2022 |
Moulvibazar Circle |
Maulvibazar Division |
Revenue |
Not Available |
| 914 |
600912 |
Surfacing work by Providing DBS-Base Course & DBS-Wearing Course from Ch. 161+100 to 165+900 and Ch. 176+068 to 183+800 of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patuakhali Road (N-8) under Barishal Road Division during the year 2021-2022 |
2021-2022 |
Barishal Zone |
Barishal Division |
Revenue |
Not Available |
| 915 |
609738 |
PMP work for Widening, Strengthening, Carpeting & Seal Coat, sign- signal at 1st Km to 10th Km (P) of Hatia(Jahajmara) -Moktaria Ghat Road ( Z-1455) Under Noakhali road Division during the year 2021-2022. |
2021-2022 |
Noakhali Circle |
Noakhali Division |
Revenue |
Not Available |
| 916 |
606066 |
Periodic Maintenance Programme (PMP Roads) on Sunamganj-Kachirgathi-Bishambarpur Road (Z-2804) from Ch.1.250 Km (Radhanagor) to Ch.7.200 Km (Chalbon) (Flood Affected Road) By Providing, Aggregate Base Type-1, DBS Wearing Course, Rigid Pavement work & Concrete Slope Protective work as required under Sunamganj Road Division of Road Circle Sylhet during the year 2021-2022. |
2021-2022 |
Sylhet Circle |
Sunamganj Division |
Revenue |
Not Available |
| 917 |
573036 |
Strengthening and DBS Wearing Course Work from Ch:39+270 to 48+170 m =8900m of Lohagara-Nahata-Kalishankarpur-Mohammadpur (Z-7506) Road under Periodic Maintenance Program PMP (Major-Road) under Road Division Magura during the FY 2020-2021. |
2020-2021 |
Jeshore Circle |
Magura Division |
Revenue |
Not Available |
| 918 |
599164 |
Periodic Maintenance Programme (PMP) Providing Widening, Strengthening, DBS-Base & Wearing Couse from Ch: 09+000 km (Boro Baherdia) to Ch: 10+260 km (Baherdia Bazar), Ch: 24+600 km (Jatrapur) to Ch: 25+100 km (Start of Rohimabad More), Ch: 25+200 km (End of Rohimabad More) to Ch: 29+010 km (Badamtala) & Ch:
29+620 km (Nonadanga) to Ch: 30+390 km (Ronobijoypur) of Rupsha-Fakirhat-Bagerhat Road (R-771) under Road Division, Bagerhat during the year 2021-2022. |
2021-2022 |
Khulna Zone |
Bagerhat Division |
Revenue |
Not Available |
| 919 |
623915 |
Periodic Maintenance Programme (PMP-Major Road) providing DBS-Wearing Course (Overlay) from Ch: 0+500m (Mohammadnagar) to Ch: 18+000m (Dewatola) (Length = 17500.00m) including Construction of Rigid Pavement from Ch: 0+000m (Gollamari More) to Ch: 0+500m (Mohammadnagar) Length = 500.00m) (Total Length = 17.50km + 0.50km = 18.00 km) of Gollamari-Batiaghata-Dacope-Nolian Forest Road (Z-7606) under Road Division, Khulna during the year 2021-2022. |
2021-2022 |
Khulna Zone |
Khulna Division |
Revenue |
Not Available |
| 920 |
607731 |
Construction of Truck Lane, Off-Loading Yard and other Ancillary Work at Bathuli Axle Load Control Station (Ch. 39+144 to Ch.39+247 and Ch. 39+444 to Ch. 41+660)of Dhaka (Mirpur)-Utholi-Paturia (N-5)
National Highway Road under Manikganj Road Division During the Year 2021-2022. |
2021-2022 |
Dhaka Zone |
Manikganj Division |
Revenue |
Not Available |
| 921 |
607734 |
Strengthening and Providing DBS Wearing Course on Gazipur-Ajmatpur-Itakhola Regional Highway (R-310) (From LRP ch. 29+940 m to 31+440 m and 32+970 m to 38+670 m) and on Shibpur-Dulalpur-
Lakhpur-Hatirdia Road (Z-2044) (From Ch. 2+000 m to 6+000 m) with Rigid Pavement (From ch. 6+000 to 6+200 m) and Construction of Rigid Pavement and pipe drain work at Ch 12+700 to Ch 13+600 & Ch 14+300 to Ch 15+300 of Panchdona (Asmandir Char)-Charsindur (Dulalpur) Road ( R-305) under Narshingdi Road Division during the year 2021-2022. |
2021-2022 |
Dhaka Zone |
Narsingdi Division |
Revenue |
Not Available |
| 922 |
607733 |
Construction of Widening, Strengthening, DBS Wearing Course, Rigid Pavement, & protective Work at 1st Km, 2nd Km, 3rd Km & 4th Km (p) of Lakpur-Aral-Kamargaon-Ghagutiachala-Toke-Motkhola Road (Z-2034) And at 10th Km (p), 11th Km, 12th Km & 13th Km (p) of Kapasia-Pabur-Fuldi-Kaligang Road (Z-3025) under Gazipur Road Division during the year 2021-2022. |
2021-2022 |
Dhaka Zone |
Gazipur Division |
Revenue |
Not Available |
| 923 |
607728 |
Surfacing by Overlay Work at 1st K.M. to 6th K.M. (P) of Banani-Joydebpur-Mymensingh Road (N-3), Kuril Flyover & Road below Kuril Flyover under Dhaka Division, Dhaka during the year 2021-2022. |
2021-2022 |
Dhaka Zone |
Dhaka Division |
Revenue |
Not Available |
| 924 |
608235 |
Periodic Maintenance Programme (PMP) by Providing DBS Wearing Course,Strengthening by Aggregate Base Type-l, Repair of Potholes, DBS-Base Course on repair portion, Brick Retaining wall,R.C.C U-Drain, Saucer Drain, Cross Drain, Sign Signal & Earth Work at Ch:63+344 to Ch:74+634 of Mostafapur-Madaripur-Shariatpur (Monohar Bazar)-Ibrahimpur-Harina-Chandpur (Bhatialpur) (R-860) Road under Road Division, Chandpur during the year 2021-2022. |
2021-2022 |
Cumilla Circle |
Chandpur Division |
Revenue |
Not Available |
| 925 |
603007 |
Construction of 44.02m Long PC Girder Nazirpur Bridge at 5th Km (Ch. 4+958) of Debirchar-Nazirpur-Lalmohon-Mongoleshikder-Tazumuddin Road under Road Division Bhola during the Fiscal year
2021-2022 |
2021-2022 |
Barisal Circle |
Bhola Division |
Revenue |
Not Available |
| 926 |
605616 |
PMP-Road & Providing Strengthening, Dense Bituminous Surfacing (DBS), Protective work & Earth work under Periodic Maintenance Programme (PMP Major) at ch. 9+550 to 14+200, 14+300 to 15+800 & Construction of Rigid Pavement ch. 14+200 to 14+300 & 15+800 to 16+000 of Shariatpur (Burirhat)-Goshairhat Road (Z-8601) under Shariatpur Road Division, during the year 2021-2022. |
2021-2022 |
Gopalgonj Zone |
Shariatpur Division |
Revenue |
Not Available |
| 927 |
604409 |
Periodic Maintenance Program (PMP) with Rigid Pavement at Ch. 22+470 Km to 22+670 Km (Aditmari Bazar), Ch. 22+800 Km to 23+040 Km (Aditmari Rail station) Ch. 47+630 Km to 47+830Km (Vullarhat Bazar), Ch. 56+600 Km to 56+950 Km (Parulia Bazar), Ch. 60+500 Km to 60+650 Km (Petrol pump Bazar), Ch. 72+200 to 72+800 Km (Borokhata Bazar), Ch. 79+400 Km to 79+800 Km (Boura Bazar) and strengthening work at Ch. 27+750 Km to Ch. 28+050Km, Ch, 29+000 Km to 30+000 Km and DBS-wearing Course at Ch. 23+000 to 28+400 Km (Tulun Bazar), Ch. 29+400 Km to 30+000 Km (Palashi Grave Yand) (Deduction 37 m) of Barabari-Lalmonirhat-Burimari National Highway (N-509) under Road Division, Lalmonirhat during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Lalmonirhat Division |
Revenue |
Not Available |
| 928 |
599113 |
Construction of 31.828m (30.488m x 1) Long P.C. Girder Madrasha Bridge at 2nd Km. (Ch. 1+627m) of Lebukhali-Bauphal-Golachipa- Amragachia Road (Z-8806) Under Patuakhali Road Division during the year 2021-22 |
2021-2022 |
Patuakhali Circle |
Patuakhali Division |
Revenue |
Not Available |
| 929 |
601784 |
Periodic Maintenance work under PMP(Road-Major) providing DBST Work including Road Marking , Traffic Sign & Sign Post at Different Location ch.191+935(Sherpur Toll Plaza) to Ch. 192+251;Ch.192+379)to Ch. 192+697 ; Ch. 193+381 to Ch.193+566 ; Ch. 194+250 to Ch.194+475; Ch 194+587 to Ch.195+396 ; Ch 195+706 to Ch. 195+984; Ch. 197+832 to Ch.197+982 ; Ch, 198+108 to Ch. 198+313; Ch 198+433 to Ch, 198+763; Ch 198+880 to 199+034; Ch 199+760 to Ch, 200+526 ; Ch 201+046 to Ch 201+080; Ch 201+280 to Ch 201+383; Ch 201+606 to Ch 201+712,Ch 202+542 to Ch 203+651 , Ch 204+336 to Ch 205+516 , Ch 207+300 to Ch 207+743, Ch 207+763 to Ch, 208+163 , Ch 208+900 to Ch, 209+692, Ch 210+725 to Ch 210+815 , ch 210+870 to Ch 211+388 , Ch 211+800 to Ch 212+000 , Ch 212+000 to Ch 213+347, Ch 213+643 to Ch 214+145, Ch 215+564 to Ch 216+032, Ch 216+392 to Ch 216+854 , Ch 216+854 to Ch 218+468, Ch 221+460 to Ch 222+015 , Ch 222+080 to Ch 225+300,Ch 232+500 to Ch 233+000, ch 236+600 to Ch 237+300 , Ch 238+800 to Ch 239+586,Ch,240+383 to 241+000, Ch 259+797 to Ch 262+900, Ch 263+900 to Ch 264+980 , Ch 265+090 to Ch 265+180 , Ch 265+228 to Ch 267+052 (Highway Police Station), Ch 267+552 (Badrukha) to Ch 268+600(Puraton Ferighat) of Dhaka(katchpur)-Bhairab-Jagadishpur-Shaistaganj-Sylhet-Tamabil-Jaflong Road (N-2) under Road Division Sylhet of Road Zone, Sylhet during the year 2021-2022 |
2021-2022 |
Sylhet Zone |
Sylhet Division |
Revenue |
Not Available |
| 930 |
604273 |
Construction of Rigid Pavement at 5th km(p), 14th km(p), 21th km(p) and 23th km(p) and DBS Wearing course at 1st km(p), 2ndkm (p), 3rd km(p), 4th km (p), 21th km(p) & 22th km(p) of Rohonpur-Bholahat-BDR Camp Road(Z-6805) under RHD Road division, Nawabganj during the year 2021-2022. |
2021-2022 |
Rajshahi Circle |
Chapainawabganj Division |
Revenue |
Not Available |
| 931 |
611326 |
DBS Wearing Course with Partial Strengthening and Rigid Pavement Work under Periodic Maintenance Programme (PMP) at 13th Km to 23rd Km (Ch.13+000 To 23+000 = 10000.00) of Eliotgong-Muradnagor-Ramchandrapur-Bancharampur (Z-1042) Road under Road Division, Cumilla during the year 2021-2022. |
2021-2022 |
Cumilla Circle |
Cumilla Division |
Revenue |
Not Available |
| 932 |
608159 |
Periodic Maintenance Programme Providing Double Bituminous Surface Treatment (DBST), Aggregate Base type- l, DBS -Base Course and DBS- Wearing Course work from LRP Ch. 33+297 to Ch.44+924 Km of Itakhola -Mothkhola -Katiade Road (R-211) and DBS- Wearing Course from Ch.0+000 to Ch.3+570 Km of Battali (R-360)- Kishoreganj Road (R-364) Under Kishoreganj Road Division during the year 2021-2022. |
2021-2022 |
Mymensingh Circle |
Kishoreganj Division |
Revenue |
Not Available |
| 933 |
599163 |
Periodic Maintenance Programme (PMP) Providing DBS-Wearing Course from Ch:97+062 km (Faltita) to Ch: 109+233 km (Noapara) of Bhanga-Bhatiapara-Mollahat-Fakirhat-Noapara Road (N-805) under Road Division, Bagerhat during the year 2021-2022. |
2021-2022 |
Khulna Zone |
Bagerhat Division |
Revenue |
Not Available |
| 934 |
604276 |
Periodic Maintenance Program (PMP) for Construction of Hard Shoulder at 425th(P),426th(P), 427th(P), 428th(P), 429th(P), 430th(P), 431st(P), 432nd(P), 439th(P), 440th(P) Km of Dhaka ( Mirpur) -Utholi-Paturia- Natakhola-Kashinathpur- Bogra-Rangpur-Beldanga-Banglabandha (N-5) Road under Road Division, Thakurgaon
during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Thakurgaon Division |
Revenue |
Not Available |
| 935 |
604309 |
Periodic Maintenance Program (PMP) for Construction of Rigid Pavement at 364th(P) (Ch.363+200 to 363+500m = 300.00m) Km of Dhaka (Mirpur) -Utholi-Paturia- Natakhola-Kashinathpur- Bogra-Rangpur-
Beldanga- Banglabandha (N-5) and Strengthening and overlay by DBS-Wearing Course of existing pavement, Sign signal,
Km post installation & Road marking work from Ch. 8+077m to 17+087m of Jharbari (Bigonj)-Joygonj-Bhabangonj-Nilphamari (Police Line)-Pachmatha-Panchapukur-Kishoregonj (Sadurarpool) Road (Z-5027) under Road Division,Nilphamari during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Nilphamari Division |
Revenue |
Not Available |
| 936 |
585578 |
Pavement Widening, Strengthening, Earthwork, Protective work, R.C.C Box Culvert Construction, Drain construction, Road Marking, Sign-Signal etc work at 8th(P) km to 17th(P) km (Ch.07+000 to 16+885) under Raising of Road Embankment with Pavement Reconstruction & Widening at Singra portion of Singra-Gurudaspur-Chatmohor (Z-5209) Road Project under Road Division, Natore during the year 2020-2021. (WP-2) |
2020-2021 |
Rajshahi Zone |
Natore Division |
Development |
Not Available |
| 937 |
584998 |
Improvement of Sirajganj-Kazipur-Dhunat-Sherpur road (Z-5401) at Ch.00+000 to 4+000 km by Widening and Strengthening of pavement (5.50 m to 21.80 m), DBS Surfacing (2x9.40 m), Development of intersection, Construction of,Bridge, RCC Box Culverts ,Concrete slope protection, Construction of RCC U-Drain, Cross Drain, Saucer drain, Bus-Bay, Brick masonry toe wall, Widening of road embankment (Earth work), Grass Turfing, General & Site Facilities, Sign, Signal, Km post, Road marking etc. under Road Division Sirajganj during the year 2019-2020 (WP-01). |
2021-2022 |
Rajshahi Zone |
Sirajgonj Division |
Development |
Not Available |
| 938 |
606870 |
Surfacing works under Periodic Maintenance Programme (PMP) (Roads-Major)Providing by Aggregate Base Type-I, DBS-Base Course, DBS-Wearing Course & Rigid Pavement work at Ch: 1st (p), 2nd (P), 3rd (P), 5th (P), 7th (P), 8th (P), 9th (P), 10th, 11th, 12th,13th and 14th (P) km of Bogura Town 2nd Bypass Road (N-515)
under Road Division Bogura during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Bogura Division |
Revenue |
Not Available |
| 939 |
600403 |
Periodic Maintenance Programme (PMP) providing DBS-Base course and DBS-Wearing course including necessary repair works from Ch. 224+315m to Ch. 225+815m (Shambagat to Metro Brick), Ch. 234+000m
to Ch. 235+785m (Bimanbondor to Foyal Bazar End), Ch. 239+315m to Ch. 240+000m (Chairman Bari More Start to
Chairman Bari More End) and Ch. 241+268m to Ch. 243+165m (Bogura Baidge Approach to Belai Bridge Approach) (Total
Working Length =5867.00m) of Daulatdia-Faridpur(Goalchamot)-Magura-Jhenaidah-Jessore-Khulna-Mongla (Digraj) Road
(N-7) National Highways under Road Division, Bagerhat during the year 2021-2022. |
2021-2022 |
Khulna Circle |
Bagerhat Division |
Revenue |
Not Available |
| 940 |
609208 |
PMP work for Strengthening, Surfacing by DBS, sign- signal and Road marking at different KM of Sonapur -Kabirhat -Companigonj(Bashurhat) - Dhagoanbhuiyan Road ( R-148) Under Noakhali Road Division during the year 2021-2022. |
2021-2022 |
Noakhali Circle |
Noakhali Division |
Revenue |
Not Available |
| 941 |
603003 |
Construction of 34.88m Long P.C Girder Bridge at 7th (Ch.6+712.04m Fakirhat Bridge) Km of Tazumuddin-Kunjerhat Road (Z-8943) under Road Division Bhola during the year 2021-22. |
2021-2022 |
Barisal Circle |
Bhola Division |
Revenue |
Not Available |
| 942 |
607867 |
Periodic Maintenance Program (PMP) of the damaged road pavement by providing Surfacing work of DBS-Wearing Course, Earth work, Protective work in Kachua By Pass - Akania More Road (Z-1442 ) from Chainage: 0+000 to 2+400 & Kaliapara-Kachua Road (Z-1050) from Ch: 0+000 to 13+305 under Road Division Chandpur during the year 2021- 2022. |
2021-2022 |
Cumilla Circle |
Chandpur Division |
Revenue |
Not Available |
| 943 |
601986 |
Periodic Maintenance Program (PMP) with DBST work including repairing & earth work at Ch. 18+600 to 35+000 Km of Mithapukur-Shahebganj-Madhyapara-Phulbari (R-556) (Dinajpur part) Road, at Ch. 0+000 to 4+440 Km of Moheshpur-Barapukuria (R-558) Dinajpur-Road, at Ch. 1+182 to 9+932 Km of Phulbari-Parbatipur (Z-5857) Road, at Ch. 0+000 to 2+950 Km of Parbotipur By-Pass (Z-5026) Road & Ch. 4+345 to 12+700 Km of Saidpur-Parbatipur Road (Z-5011) (Dinajpur Part) under Road Division, Dinajpur, during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Dinajpur Division |
Revenue |
Not Available |
| 944 |
606853 |
Repair of Pavement and surfacing by DBS Wearing Course at Chainage 37+410 to 48+000 Km of Chattogram-Rangamati National Highway (N 106) under Road Division Rangamati during the Year 2021-2022. |
2021-2022 |
Rangamati Circle |
Rangamati Division |
Revenue |
Not Available |
| 945 |
606850 |
Repair of Damaged Pavement and surfacing by DBS Wearing Course at 59 th(p)KM,60th(P) KM ,61th(p) KM,62th(P ) KM ,63th(P) KM ,64th(P) KM ,65th(P) KM ,66th(P) KM ,67th(P) KM ,68th(P) KM .69th(P)KM ,70th(P) KM ,71th(P) KM ,72th(P) KM ,73th(P) KM ,74th(P) KM ,75th(P) KM ,76th(P) KM ,77th(P) KM ,78th(P) KM
,79th(P)KM ,80 th(P)KM ,81th(P)KM ,82th(P)KM ,83th(P)KM ,84th(P)KM ,85th(P)KM ,86th(P)KM ,87th(P)KM ,88th(P) KM ,89th(p) KM and 90th(p) KM of Hathazari-Fatikchari-Matiranga-Khagrachari Road (R-160) under Khagrachari Road Division during The Year 2021-2022. |
2021-2022 |
Rangamati Circle |
Khagrachari Division |
Revenue |
Not Available |
| 946 |
613747 |
Providing DBS-Base Couse and DBSâ??Wearing Course including Strengthening by Aggregate Base Type-I from Ch. 0+000 to 1+400, 4+000 to 5+300 and 12+000 to 12+800 Total Length=3500.00m of Jashore (Daratana More)-Magura (Vaina More) National Highway (N-702) and Widening & Strengthening of Existing
Pavement including Earth Work, Sign Signal, KM Post, Guide Post, Road Marking work of Vaina More-Mirpara More Zilla Road (Z-7010) under Periodic Maintenance Programme PMP (Major-Roads) under Road Division, Jashore & Magura during the FY 2021-2022. |
2021-2022 |
Jeshore Circle |
Jessore Division |
Revenue |
Not Available |
| 947 |
604411 |
(a) Scarify, Partial Strengthening with DBS Base Course and DBS Wearing Course work at Ch. 0+980 to 1+500 (Chanpara), Ch. 2+750 to 5+200 (Chorkajura), Ch. 6+840 to 6+930 (Vatoi), Ch. 7+700 to 7+800 (Ahsannagar), Ch. 12+200 to 13+050 (Garagonj), Ch. 13+354 to 14+000 (Garagonj Bazar), and Ch. 21+230 to 21+515
(Shekpara to EB Gate) of Jhenaidah-Kushtia-Pakshi Feri-Dasuria Road (N-704) under Jhenaidah Road Division. (b) Repair
of Existing Pavement with Double Bituminous Surface Treatment (DBST) from Ch. 0+000 (Bottoli) to 6+600 (Trimohoni) of
Kushtia Town By-Pass Road (N-713) under Kushtia Road Division. (c) Strengthening by Aggregate Base Type-II and DBS Wearing Course from Ch.0+000 to Ch. 5+100 (Nayanipara to Jululi) of Nayanipara-Joluli-Jadabpur-Gopalpur Road (Z- 7488) under Jhenaidah Road Division. |
2021-2022 |
Khulna Zone |
Jhenaidah Division |
Revenue |
Not Available |
| 948 |
607632 |
PMP-Road & Estimate for PMP (Roads) Programme providing Dense Bituminous Surfacing-Wearing Course from Ch. 0+553(Bhanga Intersection) to 3+154 km, 4+360 to 4+430 km, 9+496 to 10+941 km, 12+539 to 19+554 km, 20+383 to 20+496 km, 21+740 to 21+850 km & 22+420 to 24+634 km (Kafura, Munsibazar) of Bhanga-
Faridpur Road (N-804) under Road Division, Faridpur during the year 2021-2022. |
2021-2022 |
Gopalgonj Zone |
Faridpur Division |
Revenue |
Not Available |
| 949 |
607495 |
Pavement widening by flexible pavement & rigid pavement with Road divider at zero point of Bangladesh chainage 526th(P) Km to 527th(P) Km of Dhaka (Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha (N-5) Road under Road Division, Panchagarh during the year 2021-2022 |
2021-2022 |
Dinajpur Circle |
Panchagarh Division |
Revenue |
Not Available |
| 950 |
599117 |
Overlay work of DBS Wearing Course including Road Marking at Ch. 0+000 (Udaypur ) to Ch. 2+589 (Hakimuddin Bazar) of Borhanuddin (Udaipur)-Tazumauddin-Manpura-Sikdarhat Road (Z-8905) & Agreegate Base type-1 with DBS Wearing Course including Road Marking at Ch. 11+500 (Chowkigata More) to Ch. 15+660 (Daulatkhan Bazar) of Bagmara-Banglabazar-Daulatkhan Zilla Road (Z-8915) under Bhola Road Division during the year 2021-2022 |
2021-2022 |
Barisal Circle |
Bhola Division |
Revenue |
Not Available |