Total Tenders: 1259
| 751 |
607186 |
Widening of Road Embankment by Earth work, widening (2X0.900m ) of Existing Pavement, Road Surfacing by DBS(10.30m width), construction of hard shoulder(2X1.50m), Brick masonry U-shape Drain, Protective work, Sign-signal, KM post Road Marking work of Dhaka(Jatrabari)-Cumilla(Moinamati)-Chattogram-Coxbazar-Teknaf(N-1)(Chainage 250+445 to 256+809) under Dohazari Road Division during the year 2021-2022. |
2021-2022 |
chottogram Zone |
Chottogram South Division |
Revenue |
Not Available |
| 752 |
618193 |
DBST work from Ch. 0+000 to 8+800 & Ch. 13+700 to 16+500 along with repair Profile Correction by DBS-Base Course, Partial repair at hard shoulder with Wearing Course from Ch. 5+200 to 7+000 and other ancillary works of Sheikh Hasina Highway Road (R-860) under Madaripur Road Division During the Year 2021-2022. |
2021-2022 |
Gopalgonj Circle |
Madaripur Division |
Revenue |
Not Available |
| 753 |
603147 |
Periodic Maintenance Program (PMP-Major Road) Providing Reconstruction, Strengthening & DBS Wearing Course (Overlay) from Ch. 24+000m (Dhawapara) to Ch. 34+000m (KaluKhali) (Length = 10000.00m) of Goalando (Jamtala)-Godarbazar-Pangsha-Habaspur Road (Z-7106) under Rajbari Road Division During the FY 2021-22. |
2021-2022 |
Gopalgonj Zone |
Rajbari Division |
Revenue |
Not Available |
| 754 |
539090 |
Periodic Maintenance Programme Bridge/Culvert for Construction of 63.798m 2x15.25m 1x30.488m Long P.C and RCC Girder Bridge Mucherghat Bridge at 3rd km Ch.02800m of Bharadoba-Sagordighi-Ghatail-Bhuianpur Road Z-3037 under Mymensingh Road Division during the year 2020-2021. |
2020-2021 |
Mymensingh Circle |
Mymensingh Division |
Revenue |
Not Available |
| 755 |
607732 |
Construction of Rigid Pavement From Ch.0+000 to Ch. 2+150 of Sonargaon Musium Link Road (Z-1064) & from Ch: 0+000 to Ch: 0+405 of Sultana Kamal Bridge connecting Road (Z-2001) at (R-201) and Construction of Araihazar Bypass Road from Ch: 0+000 to Ch: 1+100 under Narayanganj Road Division during the year 2021-2022. |
2021-2022 |
Dhaka Zone |
Narayanganj Division |
Revenue |
Not Available |
| 756 |
610920 |
Maintenance of Existing Pavement with Double Bituminous Surface Treatment (DBST) and Construction of RCC U-Drain, Saucer Drain & RCC Palasiding Works at Ch. 17+580 to 42+830 of Godagari- Nachole- Niamatpur (Nawabganj portion) (Z-6813) and at Ch. 0+000 to 5+010 of Dhansura- Parbotipur- Adda Link Road (Z- 6812) under Road Division, Nawabganj during the year 2021-2022. |
2021-2022 |
Rajshahi Circle |
Chapainawabganj Division |
Revenue |
Not Available |
| 757 |
624624 |
Construction of 62.00m (2x15.25m RCC + 30.488m Steel Truss) Long Bridge at 30th Km. (Ch. 29+270) of Arpera-Kaliganj Road (Z-7021) at Kaliganj Bazar under Periodic Maintenance Programme (PMP Bridge) |
2021-2022 |
Khulna Zone |
Jhenaidah Division |
Revenue |
Not Available |
| 758 |
623584 |
Construction of 40.974 m (1x39.634m) Long P.C Girder Sewta Bridge including U-Loop at 52nd Km.(Ch.51+575 m) on Dhaka (Mirpur)-Utholi-Paturia-Natakhola-Kashinathpur National Highway (N-5) (Manikganj part) under Manikganj Road Division, Manikganj during the year 2021-2022. |
2021-2022 |
Dhaka Circle |
Manikganj Division |
Revenue |
Not Available |
| 759 |
621768 |
PMP-Bridge & Construction of 37.92m (36.58m x1) Long P.C Girder Batikamari Bridge at 6th. Km. (Ch:=5+460m) on Baraitala-Muksudpur Road (Z-8021), Under Gopalgonj Road Division, Gopalgonj During the year 2021-2022. |
2021-2022 |
Gopalgonj Circle |
Gopalganj Division |
Revenue |
Not Available |
| 760 |
607729 |
Construction of Rigid Pavement work of Birulia-Ashulia Road (N 511) at 2nd km (P), 3rd km, 4th km (P), 5th km (P), 6th km (P), 9th km (P) & 10th km (P) and Widening & Overlay of Existing flexible Pavement at 1st km(p) and Construction of Rigid Pavement at 1st km (p), at 1st km (P),2nd km (P), 3rd km (p), 4th km (P), 5th km (P), & 6th km (P) of Abdullahpur- Termuk-Ulukhola Road (Z-3003) Under Dhaka Road Division during the Year 2021-2022. |
2021-2022 |
Dhaka Zone |
Dhaka Division |
Revenue |
Not Available |
| 761 |
613874 |
Construction of Service Road by Rigid Pavement and HBB with necessary work for connecting with weigh Scale Load Control Station at Both end of Sayed Nazrul Islam Bridge at 88th (Old Chainage) km of
Dhaka(Katchpur)-Bhairab- Jagadishpur-Saishtagonj-Sylhet-Tamabil-Jaflong Road (N2) and at Both end of Shahid Moyez Uddin Bridge weigh scale Load Control Station at 25km of Tongi-Kaliganj-Gorashal-Pachdona Road (R-301) Under Narsingdi Road Division During the Year 2021-2022. |
2021-2022 |
Narayangonj Circle |
Narsingdi Division |
Revenue |
Not Available |
| 762 |
621269 |
Construction of Vehicle Inspection Centre (VIC) Of Bangladesh Road Transport Authority (BRTA) At Mirpur, Dhaka. |
2021-2022 |
Dhaka Zone |
Dhaka Division |
Revenue |
Not Available |
| 763 |
605798 |
PMP (Road - Major) works providing 40mm DBS wearing course including Aggregate Base Type-I, Protective Work etc. from Ch: 8+200 (Shibganj Bazar) to 23+500 (Manda Ferry Ghat ) = 15.300 K.M. of Enayetpur- Mohadevpur-Patakhatahat-Manda (Z-5463) Road under Road Division ,Naogaon during the year-2021-2022. |
2021-2022 |
Rajshahi Zone |
Naogaon Division |
Revenue |
Not Available |
| 764 |
610411 |
(a) Surfacing by DBS-Wearing Course from Ch. 4+000Km to Ch. 13+700Km (Chuadanga Jail to Dugdugi Bazar) Total 9700.00m of Chuadanga-Darshona-Jibonnagar-Kotchandpur-Kaligonj Road (R-
748) under Chuadanga Road Division. (b) Partial Strengthening & DBS-Wearing Course from Ch. 50+780Km to 65+880Km (Dudhsora to Kaligonj) Total 15100.00m of Chuadanga-Darshona-Jibonnagar-Kotchandpur-Kaligonj Road (R-748) under Jhenaidah Road Division. |
2021-2022 |
Khulna Zone |
Jhenaidah Division |
Revenue |
Not Available |
| 765 |
604477 |
(1)Reapir by Base Type-II & Overlay work at 6th to 12nd km (Ch. 6+000 to 12+000) of Bhandaria-Paikkhali-Kathalia (Z-8705) (2) Repair Existing pavement and Overlay work at 1st & 2nd km (Ch. 0+000 to 2+000) of Amua Bridge Approch Road (Z-8710) (3) Rehabilitation work by Overlay with 40mm DBS wearing course including furnishing Road Marking at 1st km to 7th km of Jhalokati-Kirtipasha-Swarupkhati Road (Z-8716) (4) Rehabilitation work by Overlay with 40mm DBS wearing course including furnishing Road Marking at 1st(P) km. of R-870 Link Road (Petrol Pump to Gurudham Bridge) Road (Z-8707) & (5) Strengthening of existing pavement & Overlay work at 1st km (Ch. 0+000 to 1+000) of Dapdapia Puraton Ferryghat Road (Z-8050)Through PMP under Jhalokati Road Division during the Year 2021-2022. |
2021-2022 |
Barishal Zone |
Jhalokati Division |
Revenue |
Not Available |
| 766 |
601487 |
Periodic Maintenance works under PMP-Major (Road) at Ch. 0+000 to 9+500 of Paksey (Ruppur)-Iswardi-Dasuria Road (N705), Ch. 22+480 to 26+600 of Pabna-Paksey(EPZ) Road (R603) and Ch. 0+000 to 18+850 of Madhpur-Santhia-Bera Road (Z6026) (Pabna Part) Road under Pabna Road Division, during the year 2021-2022. |
2021-2022 |
Pabna Circle |
Pabna Division |
Revenue |
Not Available |
| 767 |
606065 |
Construction of RCC Retaining wall , HBB Pavement & Toll Box Building at Ch.191.725 to Ch. 192.075 (Sherpur Bridge Toll Plaza) of Dhaka (Katchpur)-Bhairab-Jagadishpur-Shaistaganj-Sylhet-Tamabil-Jaflong Road (N-2) under Sylhet Road Division of Road Circle Sylhet during the year 2021-2022. |
2021-2022 |
Sylhet Circle |
Sylhet Division |
Revenue |
Not Available |
| 768 |
619845 |
Periodic Maintenance Programme (PMP) Providing Partial Strengthening by Aggregate Base Type-I, Repairing by Sub-base and Surfacing with DBS work & Protective work at. Ch. 8 + 000 to 18 +200 Km of Cumilla-Salda-Kosba (Soyadabad) Road (N-114) under Road Division Cumilla during the year 2021-2022. |
2021-2022 |
Cumilla Circle |
Cumilla Division |
Revenue |
Not Available |
| 769 |
608087 |
Periodic Maintenance Programme (Bridge/Culvert) for Construction of 50.12m (1x48.78m) Long P.C Girder Bridge (Bajja Bridge) at 14th Km (Ch.13+600m) of Bharadoba -Sagordighi -Bhuanpur Road (Z-3037) under Mymensingh Road Division During the Year 2021-2022. |
2021-2022 |
Mymensingh Circle |
Mymensingh Division |
Revenue |
Not Available |
| 770 |
622986 |
Re-Construction of 44.020 m (1x42.68m) long PC Girder Bridge (Karoi Bari Bridge) at 22nd km (Ch. 21km+075.00m) on Companigonj-Nabinagar (Z-1206) Road, under Road Division, Brahmanbaria during the year 2021-2022. |
2021-2022 |
Cumilla Circle |
Brahmanbaria Division |
Revenue |
Not Available |
| 771 |
595614 |
Periodic Maintenance Programme PMP for Rigid Pavement at different Km of Bogura-Naogaon-Mohadevpur-Patnitala-Dhamoirhat-Joypurhat R-545 Road & Herring Bond Brick HBB Protective Work etc at
different Km of Naogaon-Badalgachi-Patnitala-Shapahar-Porsha-Rahanpur R-547 Road under Road Division Naogaon during the year 2020-2021. |
2020-2021 |
Rajshahi Zone |
Naogaon Division |
Revenue |
Not Available |
| 772 |
611355 |
Construction of Rigid Pavement from CH: 8+575 To 09+450 = 875.00 m of Feni (Mohammad ali bazar)-Chhagalnaiya Korerhat Road (Z-1031) (Dhaka-Chottogram old Highway) under Feni Road Division, during the year 2021-2022 Under PMP (Road-Major) Program. |
2021-2022 |
Noakhali Circle |
Feni Division |
Revenue |
Not Available |
| 773 |
606241 |
Rehabilitation of existing pavement by DBS Wearing Course under Periodic Maintenance Program at 21st km to 41st km (Ch-20+100km to 40+100km) and protective work by RCC retaining wall at 26th and 27th km of Chiringya (Fasiakhali) - Lama- Alikadam Road (Z-1005) under Bandarban Road Division during the Year 2021-2022. |
2021-2022 |
chottogram Zone |
Bandarban Division |
Revenue |
Not Available |
| 774 |
555749 |
Pavement ReconstructionRigid Pavement Construction Pavement Widening & Strengthening Earthwork Protective workR.C.C Box Culvert ConstructionDrain constructionRoad Marking Sign-Signal etc work at 1stP km to 7thP km Ch.00000 to 07000 under raising of road embankment with Pavement Reconstruction & Widening at Singra portion of Singra-Gurudaspur- Chatmohor Z-5209 Road under Road Division Natore during the year 2020-2021. DPP Package No.-01. |
2021-2022 |
Rajshahi Zone |
Natore Division |
Development |
Not Available |
| 775 |
603139 |
Periodic Maintenance Providing Rigid Pavement work at Ch. 0+030Km (Night Chowmohona) to Ch. 0+750km (Juri Bazar), Ch. 0+800Km (Juri Bazar) to Ch. 1+400Km (Juri Food Godown) of Juri-Lathitila Road (R-282) under Road Division, Moulvibazar during the year 2021-2022. |
2021-2022 |
Moulvibazar Circle |
Maulvibazar Division |
Revenue |
Not Available |
| 776 |
600912 |
Surfacing work by Providing DBS-Base Course & DBS-Wearing Course from Ch. 161+100 to 165+900 and Ch. 176+068 to 183+800 of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patuakhali Road (N-8) under Barishal Road Division during the year 2021-2022 |
2021-2022 |
Barishal Zone |
Barishal Division |
Revenue |
Not Available |
| 777 |
609738 |
PMP work for Widening, Strengthening, Carpeting & Seal Coat, sign- signal at 1st Km to 10th Km (P) of Hatia(Jahajmara) -Moktaria Ghat Road ( Z-1455) Under Noakhali road Division during the year 2021-2022. |
2021-2022 |
Noakhali Circle |
Noakhali Division |
Revenue |
Not Available |
| 778 |
606066 |
Periodic Maintenance Programme (PMP Roads) on Sunamganj-Kachirgathi-Bishambarpur Road (Z-2804) from Ch.1.250 Km (Radhanagor) to Ch.7.200 Km (Chalbon) (Flood Affected Road) By Providing, Aggregate Base Type-1, DBS Wearing Course, Rigid Pavement work & Concrete Slope Protective work as required under Sunamganj Road Division of Road Circle Sylhet during the year 2021-2022. |
2021-2022 |
Sylhet Circle |
Sunamganj Division |
Revenue |
Not Available |
| 779 |
573036 |
Strengthening and DBS Wearing Course Work from Ch:39+270 to 48+170 m =8900m of Lohagara-Nahata-Kalishankarpur-Mohammadpur (Z-7506) Road under Periodic Maintenance Program PMP (Major-Road) under Road Division Magura during the FY 2020-2021. |
2020-2021 |
Jeshore Circle |
Magura Division |
Revenue |
Not Available |
| 780 |
599164 |
Periodic Maintenance Programme (PMP) Providing Widening, Strengthening, DBS-Base & Wearing Couse from Ch: 09+000 km (Boro Baherdia) to Ch: 10+260 km (Baherdia Bazar), Ch: 24+600 km (Jatrapur) to Ch: 25+100 km (Start of Rohimabad More), Ch: 25+200 km (End of Rohimabad More) to Ch: 29+010 km (Badamtala) & Ch:
29+620 km (Nonadanga) to Ch: 30+390 km (Ronobijoypur) of Rupsha-Fakirhat-Bagerhat Road (R-771) under Road Division, Bagerhat during the year 2021-2022. |
2021-2022 |
Khulna Zone |
Bagerhat Division |
Revenue |
Not Available |
| 781 |
623915 |
Periodic Maintenance Programme (PMP-Major Road) providing DBS-Wearing Course (Overlay) from Ch: 0+500m (Mohammadnagar) to Ch: 18+000m (Dewatola) (Length = 17500.00m) including Construction of Rigid Pavement from Ch: 0+000m (Gollamari More) to Ch: 0+500m (Mohammadnagar) Length = 500.00m) (Total Length = 17.50km + 0.50km = 18.00 km) of Gollamari-Batiaghata-Dacope-Nolian Forest Road (Z-7606) under Road Division, Khulna during the year 2021-2022. |
2021-2022 |
Khulna Zone |
Khulna Division |
Revenue |
Not Available |
| 782 |
607731 |
Construction of Truck Lane, Off-Loading Yard and other Ancillary Work at Bathuli Axle Load Control Station (Ch. 39+144 to Ch.39+247 and Ch. 39+444 to Ch. 41+660)of Dhaka (Mirpur)-Utholi-Paturia (N-5)
National Highway Road under Manikganj Road Division During the Year 2021-2022. |
2021-2022 |
Dhaka Zone |
Manikganj Division |
Revenue |
Not Available |
| 783 |
607734 |
Strengthening and Providing DBS Wearing Course on Gazipur-Ajmatpur-Itakhola Regional Highway (R-310) (From LRP ch. 29+940 m to 31+440 m and 32+970 m to 38+670 m) and on Shibpur-Dulalpur-
Lakhpur-Hatirdia Road (Z-2044) (From Ch. 2+000 m to 6+000 m) with Rigid Pavement (From ch. 6+000 to 6+200 m) and Construction of Rigid Pavement and pipe drain work at Ch 12+700 to Ch 13+600 & Ch 14+300 to Ch 15+300 of Panchdona (Asmandir Char)-Charsindur (Dulalpur) Road ( R-305) under Narshingdi Road Division during the year 2021-2022. |
2021-2022 |
Dhaka Zone |
Narsingdi Division |
Revenue |
Not Available |
| 784 |
607733 |
Construction of Widening, Strengthening, DBS Wearing Course, Rigid Pavement, & protective Work at 1st Km, 2nd Km, 3rd Km & 4th Km (p) of Lakpur-Aral-Kamargaon-Ghagutiachala-Toke-Motkhola Road (Z-2034) And at 10th Km (p), 11th Km, 12th Km & 13th Km (p) of Kapasia-Pabur-Fuldi-Kaligang Road (Z-3025) under Gazipur Road Division during the year 2021-2022. |
2021-2022 |
Dhaka Zone |
Gazipur Division |
Revenue |
Not Available |
| 785 |
607728 |
Surfacing by Overlay Work at 1st K.M. to 6th K.M. (P) of Banani-Joydebpur-Mymensingh Road (N-3), Kuril Flyover & Road below Kuril Flyover under Dhaka Division, Dhaka during the year 2021-2022. |
2021-2022 |
Dhaka Zone |
Dhaka Division |
Revenue |
Not Available |
| 786 |
608235 |
Periodic Maintenance Programme (PMP) by Providing DBS Wearing Course,Strengthening by Aggregate Base Type-l, Repair of Potholes, DBS-Base Course on repair portion, Brick Retaining wall,R.C.C U-Drain, Saucer Drain, Cross Drain, Sign Signal & Earth Work at Ch:63+344 to Ch:74+634 of Mostafapur-Madaripur-Shariatpur (Monohar Bazar)-Ibrahimpur-Harina-Chandpur (Bhatialpur) (R-860) Road under Road Division, Chandpur during the year 2021-2022. |
2021-2022 |
Cumilla Circle |
Chandpur Division |
Revenue |
Not Available |
| 787 |
603007 |
Construction of 44.02m Long PC Girder Nazirpur Bridge at 5th Km (Ch. 4+958) of Debirchar-Nazirpur-Lalmohon-Mongoleshikder-Tazumuddin Road under Road Division Bhola during the Fiscal year
2021-2022 |
2021-2022 |
Barisal Circle |
Bhola Division |
Revenue |
Not Available |
| 788 |
605616 |
PMP-Road & Providing Strengthening, Dense Bituminous Surfacing (DBS), Protective work & Earth work under Periodic Maintenance Programme (PMP Major) at ch. 9+550 to 14+200, 14+300 to 15+800 & Construction of Rigid Pavement ch. 14+200 to 14+300 & 15+800 to 16+000 of Shariatpur (Burirhat)-Goshairhat Road (Z-8601) under Shariatpur Road Division, during the year 2021-2022. |
2021-2022 |
Gopalgonj Zone |
Shariatpur Division |
Revenue |
Not Available |
| 789 |
604409 |
Periodic Maintenance Program (PMP) with Rigid Pavement at Ch. 22+470 Km to 22+670 Km (Aditmari Bazar), Ch. 22+800 Km to 23+040 Km (Aditmari Rail station) Ch. 47+630 Km to 47+830Km (Vullarhat Bazar), Ch. 56+600 Km to 56+950 Km (Parulia Bazar), Ch. 60+500 Km to 60+650 Km (Petrol pump Bazar), Ch. 72+200 to 72+800 Km (Borokhata Bazar), Ch. 79+400 Km to 79+800 Km (Boura Bazar) and strengthening work at Ch. 27+750 Km to Ch. 28+050Km, Ch, 29+000 Km to 30+000 Km and DBS-wearing Course at Ch. 23+000 to 28+400 Km (Tulun Bazar), Ch. 29+400 Km to 30+000 Km (Palashi Grave Yand) (Deduction 37 m) of Barabari-Lalmonirhat-Burimari National Highway (N-509) under Road Division, Lalmonirhat during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Lalmonirhat Division |
Revenue |
Not Available |
| 790 |
599113 |
Construction of 31.828m (30.488m x 1) Long P.C. Girder Madrasha Bridge at 2nd Km. (Ch. 1+627m) of Lebukhali-Bauphal-Golachipa- Amragachia Road (Z-8806) Under Patuakhali Road Division during the year 2021-22 |
2021-2022 |
Patuakhali Circle |
Patuakhali Division |
Revenue |
Not Available |
| 791 |
601784 |
Periodic Maintenance work under PMP(Road-Major) providing DBST Work including Road Marking , Traffic Sign & Sign Post at Different Location ch.191+935(Sherpur Toll Plaza) to Ch. 192+251;Ch.192+379)to Ch. 192+697 ; Ch. 193+381 to Ch.193+566 ; Ch. 194+250 to Ch.194+475; Ch 194+587 to Ch.195+396 ; Ch 195+706 to Ch. 195+984; Ch. 197+832 to Ch.197+982 ; Ch, 198+108 to Ch. 198+313; Ch 198+433 to Ch, 198+763; Ch 198+880 to 199+034; Ch 199+760 to Ch, 200+526 ; Ch 201+046 to Ch 201+080; Ch 201+280 to Ch 201+383; Ch 201+606 to Ch 201+712,Ch 202+542 to Ch 203+651 , Ch 204+336 to Ch 205+516 , Ch 207+300 to Ch 207+743, Ch 207+763 to Ch, 208+163 , Ch 208+900 to Ch, 209+692, Ch 210+725 to Ch 210+815 , ch 210+870 to Ch 211+388 , Ch 211+800 to Ch 212+000 , Ch 212+000 to Ch 213+347, Ch 213+643 to Ch 214+145, Ch 215+564 to Ch 216+032, Ch 216+392 to Ch 216+854 , Ch 216+854 to Ch 218+468, Ch 221+460 to Ch 222+015 , Ch 222+080 to Ch 225+300,Ch 232+500 to Ch 233+000, ch 236+600 to Ch 237+300 , Ch 238+800 to Ch 239+586,Ch,240+383 to 241+000, Ch 259+797 to Ch 262+900, Ch 263+900 to Ch 264+980 , Ch 265+090 to Ch 265+180 , Ch 265+228 to Ch 267+052 (Highway Police Station), Ch 267+552 (Badrukha) to Ch 268+600(Puraton Ferighat) of Dhaka(katchpur)-Bhairab-Jagadishpur-Shaistaganj-Sylhet-Tamabil-Jaflong Road (N-2) under Road Division Sylhet of Road Zone, Sylhet during the year 2021-2022 |
2021-2022 |
Sylhet Zone |
Sylhet Division |
Revenue |
Not Available |
| 792 |
604273 |
Construction of Rigid Pavement at 5th km(p), 14th km(p), 21th km(p) and 23th km(p) and DBS Wearing course at 1st km(p), 2ndkm (p), 3rd km(p), 4th km (p), 21th km(p) & 22th km(p) of Rohonpur-Bholahat-BDR Camp Road(Z-6805) under RHD Road division, Nawabganj during the year 2021-2022. |
2021-2022 |
Rajshahi Circle |
Chapainawabganj Division |
Revenue |
Not Available |
| 793 |
611326 |
DBS Wearing Course with Partial Strengthening and Rigid Pavement Work under Periodic Maintenance Programme (PMP) at 13th Km to 23rd Km (Ch.13+000 To 23+000 = 10000.00) of Eliotgong-Muradnagor-Ramchandrapur-Bancharampur (Z-1042) Road under Road Division, Cumilla during the year 2021-2022. |
2021-2022 |
Cumilla Circle |
Cumilla Division |
Revenue |
Not Available |
| 794 |
608159 |
Periodic Maintenance Programme Providing Double Bituminous Surface Treatment (DBST), Aggregate Base type- l, DBS -Base Course and DBS- Wearing Course work from LRP Ch. 33+297 to Ch.44+924 Km of Itakhola -Mothkhola -Katiade Road (R-211) and DBS- Wearing Course from Ch.0+000 to Ch.3+570 Km of Battali (R-360)- Kishoreganj Road (R-364) Under Kishoreganj Road Division during the year 2021-2022. |
2021-2022 |
Mymensingh Circle |
Kishoreganj Division |
Revenue |
Not Available |
| 795 |
599163 |
Periodic Maintenance Programme (PMP) Providing DBS-Wearing Course from Ch:97+062 km (Faltita) to Ch: 109+233 km (Noapara) of Bhanga-Bhatiapara-Mollahat-Fakirhat-Noapara Road (N-805) under Road Division, Bagerhat during the year 2021-2022. |
2021-2022 |
Khulna Zone |
Bagerhat Division |
Revenue |
Not Available |
| 796 |
604276 |
Periodic Maintenance Program (PMP) for Construction of Hard Shoulder at 425th(P),426th(P), 427th(P), 428th(P), 429th(P), 430th(P), 431st(P), 432nd(P), 439th(P), 440th(P) Km of Dhaka ( Mirpur) -Utholi-Paturia- Natakhola-Kashinathpur- Bogra-Rangpur-Beldanga-Banglabandha (N-5) Road under Road Division, Thakurgaon
during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Thakurgaon Division |
Revenue |
Not Available |
| 797 |
604309 |
Periodic Maintenance Program (PMP) for Construction of Rigid Pavement at 364th(P) (Ch.363+200 to 363+500m = 300.00m) Km of Dhaka (Mirpur) -Utholi-Paturia- Natakhola-Kashinathpur- Bogra-Rangpur-
Beldanga- Banglabandha (N-5) and Strengthening and overlay by DBS-Wearing Course of existing pavement, Sign signal,
Km post installation & Road marking work from Ch. 8+077m to 17+087m of Jharbari (Bigonj)-Joygonj-Bhabangonj-Nilphamari (Police Line)-Pachmatha-Panchapukur-Kishoregonj (Sadurarpool) Road (Z-5027) under Road Division,Nilphamari during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Nilphamari Division |
Revenue |
Not Available |
| 798 |
585578 |
Pavement Widening, Strengthening, Earthwork, Protective work, R.C.C Box Culvert Construction, Drain construction, Road Marking, Sign-Signal etc work at 8th(P) km to 17th(P) km (Ch.07+000 to 16+885) under Raising of Road Embankment with Pavement Reconstruction & Widening at Singra portion of Singra-Gurudaspur-Chatmohor (Z-5209) Road Project under Road Division, Natore during the year 2020-2021. (WP-2) |
2020-2021 |
Rajshahi Zone |
Natore Division |
Development |
Not Available |
| 799 |
584998 |
Improvement of Sirajganj-Kazipur-Dhunat-Sherpur road (Z-5401) at Ch.00+000 to 4+000 km by Widening and Strengthening of pavement (5.50 m to 21.80 m), DBS Surfacing (2x9.40 m), Development of intersection, Construction of,Bridge, RCC Box Culverts ,Concrete slope protection, Construction of RCC U-Drain, Cross Drain, Saucer drain, Bus-Bay, Brick masonry toe wall, Widening of road embankment (Earth work), Grass Turfing, General & Site Facilities, Sign, Signal, Km post, Road marking etc. under Road Division Sirajganj during the year 2019-2020 (WP-01). |
2021-2022 |
Rajshahi Zone |
Sirajgonj Division |
Development |
Not Available |
| 800 |
606870 |
Surfacing works under Periodic Maintenance Programme (PMP) (Roads-Major)Providing by Aggregate Base Type-I, DBS-Base Course, DBS-Wearing Course & Rigid Pavement work at Ch: 1st (p), 2nd (P), 3rd (P), 5th (P), 7th (P), 8th (P), 9th (P), 10th, 11th, 12th,13th and 14th (P) km of Bogura Town 2nd Bypass Road (N-515)
under Road Division Bogura during the year 2021-2022. |
2021-2022 |
Rangpur Zone |
Bogura Division |
Revenue |
Not Available |