Total Tenders: 1397
| 601 |
729821 |
Periodic Maintenance Programme (PMP-Road Major) Providing DBS-Wearing Course from Ch. 0+000 to 13+100 with link road (0+000 to 1+300) Total Length = 14.40 Km including Strengthening byAggregate Base Type-I of Sutighata-Dhakuria-Kuada Zilla Road (Z-7058) under Road Division, Jashore. |
2022-2023 |
Khulna Zone |
Jessore Division |
Revenue |
MD. MOYENUDDIN(BASHI) LIMITED |
| 602 |
732484 |
Strengthening and DBS Wearing Course work atCh. 48+170m to Ch. 55+885m = 7715m of Lohagara-Nahata-Kalishankarpur-Mohammadpur (Z-7506) Road under Periodic Maintenance Program PMP(Major-Road) under Road Division, Magura during the FY2022-2023. |
2022-2023 |
Jeshore Circle |
Magura Division |
Revenue |
ABAID MONSUR CONSTRUCTIONS-M/S. SARDARENTERP |
| 603 |
732485 |
Periodic Maintenance of Lohagara Bazar-Naragati Road (Z-7503) with widening, Strengthening,Dense Bituminous Surfacing-Wearing course including necessaryProtective work (R.C.C Palisiding), Earth work,Road Marking, Traffic Sign, Sign Postworks from Ch. 17+000m to 22+000m and Narail
(Tularampur)-Maijpara Road (Z-7504) with Strengthening,Dense Bituminous Surfacing-DBS Wearing Course work, Earth work,Road Marking, Traffic Sign, Sign Post &Protective work (R.C.CPalisiding) from ch. 07+150m to 09+200m under Road Division,Narail during the year 2022-2023. |
2022-2023 |
Jeshore Circle |
Narail Division |
Revenue |
Mohammed Eunus &Brothers (Pvt.) Ltd. |
| 604 |
734624 |
Construction of 19.64 m (1x18.30 m) long RCCGirder Bridge (Khan Mohona Bridge) at 3rd km (Ch. 02+622.85m) on Patiya-Boalkhali (Kanunggopara) Road (Z-1059) under Dohazari Road Division during the year 2022-2023. |
2022-2023 |
Chottogram Circle |
Chottogram South Division |
Revenue |
QC- TES(JV) |
| 605 |
744408 |
Periodic Maintenance work (PMPRoad Major) byProviding DBS-Wearing Course at (Overly) Ch.20+866 (Old Muksudpur) to Ch. 24+266 (Gerakhola) and Ch.28+231 (Sibgati) to Ch. 33+831 (Mazra) of BhangaBhatiapara-Mollahat-Noapara (N805) Road underGopalgonj Road Division during the year 2022-2023 |
2022-2023 |
Gopalgonj Zone |
Gopalganj Division |
Revenue |
Orient Trading &Builders Ltd. |
| 606 |
736951 |
PMPwork for Repair of Scouring atDownstream ofDeudoria Bridge, Oriondo Bridge, Korra Bridge, Batla Bridge and Double VentCulvert for Protective Bridge,Culvert and Road embankment of Itna-Mithamain-Austagram Road under Kishoreganj Road Division During the year 2022-2023. |
2022-2023 |
Mymensingh Zone |
Kishoreganj Division |
Revenue |
Hassan Techno Builders Ltd.- National Development Engineers Ltd.- Sagar Info Builders Ltd. JV |
| 607 |
735439 |
Periodic Maintenance Programme PMP(Bridge/Culvert) for Re-Construction of 06 Nos R.C.CBoxCulvert atCh 4+690 km (Size: 1x5.00mx5.00mx10.25m),Ch 4+830 km (Size: 1x5.00mx5.00mx10.25m),Ch 5+290 km (Size: 2x5.00mx5.00mx10.25m) ,Ch 10+250 km (Size: 2x5.00mx5.00mx10.25m),Ch 10+580 km (Size: 2x5.00mx5.00mx10.25m),Ch 11+390 km (Size:
2x6.00mx6.00mx10.25m), With Earth work,ConcreteGuide Post,Road Marking, Traffic Sign, Sign Post of Kotalipara-RadhaganjPirerbari-Dakshin Dashar Road (Z-8035) underGopalganj Road Division during the year 2022-2023. |
2022-2023 |
Gopalgonj Circle |
Gopalganj Division |
Revenue |
National Development Engineers Ltd-Hassan Techno Builders Ltd. JV |
| 608 |
727592 |
Periodic Maintenance Programme (Roads) providing widening work at ch.0+000 to Ch.12+260 of Bhanga(Pukuria)-Sadorpur Road (Z-8401) under Road Division,Faridpur during the year 2022-23. |
2022-2023 |
Faridpur Circle |
Faridpur Division |
Revenue |
MHA-MSRJV |
| 609 |
729193 |
Construction of 28.780 (1x27.44 m) long P.CGirder Bridge ( Kashimpur Bridge-2) at 16th km (CH.15+510) on Companiganj- Nabinagar Road (Z-1206) under Cumilla Road Division during the
year 2022-2023. |
2022-2023 |
Cumilla Circle |
Cumilla Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd.-Hassan Techno Builders Ltd. (JV) |
| 610 |
729506 |
Construction of 28.780(1x27.44 m) long P.CGirder Bridge ( Kashimpur Bridge) at 15th km (CH.14+880) on Companiganj- Nabinagar Road (Z-1206) under Cumilla Road Division during the year 2022-2023. |
2022-2023 |
Cumilla Circle |
Cumilla Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd.-Hassan Techno Builders Ltd. (JV) |
| 611 |
728161 |
Periodic Maintenance work Providing DBS-Base Course and DBSTatCh.150+532 to Ch. 163+972 ofDhaka(Mirpur)-Uthuli-Paturia-Natakhola-Kashinathpur-Bogra-Rangpur-Beldhanga-Banglabandha Road (N-5) under Sirajgonj Road Division during the year 2022-2023. |
2022-2023 |
Rajshahi Zone |
Sirajgonj Division |
Revenue |
Turna Enterprise (Pvt.) Ltd. |
| 612 |
747066 |
Construction of 40.974m long P.CGirder Baridge at 7th km(JomadderBari) (Ch.6+630) ofRajapur-Naikathi-Bekutia-Pirojpur Road (Z-8702) Through PMPunder Jhalokati Road Division during the Year 2022-2023. |
2022-2023 |
Barisal Circle |
Jhalokati Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. And M/SKamrul & Brothers (JV) |
| 613 |
746689 |
Construction of 37.920m. (1x36.580m) Long P.CGirder Dak BunglowBridge at 12th (Ch. 11+239m) Km on Debirchar-Nazirpur-Lalmohon-Mongolsikder-Tazumuddin Road (Z-8913) under Road Division, Bhola during the year 2022-23 |
2022-2023 |
Barisal Circle |
Bhola Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 614 |
737678 |
Periodic Maintenance Programme for Construction of 22.68m long (1x21.34m) R.C.C.Girder Matikata Bridge at 16th km. (Ch. 15+005m) ofNetrokona - Madon - Khaliajuri Road. |
2022-2023 |
Mymensingh Circle |
Netrokona Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 615 |
738483 |
Earthwork,Construction/ Strengthening, Surfacing,Rigid Pavment, Widening &ReConstruction of 2 No RCCBoxCulvert, 1 No.Under Pass, 1 No.of Intersection, etc at 0+000 to 18+250 Km of MandaNiamatpur-Sibpur-Porsha (Z-6852) Road Under Road Division Naogaon During the Year 2022-2023.(WP-10 |
2022-2023 |
Rajshahi Circle |
Naogaon Division |
Development |
Toma Construction &Co. Limited - M/S. M.A. ENGINEERING(JV) |
| 616 |
723220 |
Rehabilitation ofNational Highway(N1) from Unchiprang (Ch.431+494) to Teknaf (Ch.462+254) ofCoxs Bazar-TeknafRoad under Coxs Bazar Road Division during the year 2022-2023 (PW-03). |
2022-2023 |
chottogram Zone |
Cox's Bazar Division |
Development |
MAX INFRASTRUCTURE Ltd. |
| 617 |
750521 |
Earth work, Widening, Strengthening, Surfacing,Rigid Pavement,Drain,Culvert &
Protective work from chainage 0+000 to 9+000 Km of Mohadevpur-Saraigachi-Porsha Road (Z-5456) under Road Division Naogaon, during the year 2022-2023.( WP: 12) |
2022-2023 |
Rajshahi Circle |
Naogaon Division |
Development |
Toma Construction &Co. Limited - MAZaher Limited (JV) |
| 618 |
738925 |
Construction of 47.072m (1x45.732m) Long PCGirder Bridge (Jamtali Bridge) at 18th KM(Ch:17km+162.5m) including diversion road &approach road of Khagrachari-Dighinala-Baghaihat-SajekRoad
(Z-1603) under Khagrachari Road Division during the year 2022-2023. |
2022-2023 |
Rangamati Circle |
Khagrachari Division |
Revenue |
S. Ananta Bikash Tripura |
| 619 |
739156 |
Construction of 31.828 (1x30.488m) Long P.C.Girder Bridge over Naikhongchari khal (BGBBridge) at 165th KM(Ch: 164+997.00m) of Bandarban-Chimbuk-Thanchi-AlikadamNaikhongchari-Gundum Raod (Z-1811)under Bandarban Road Division during the year 2022-2023. |
2022-2023 |
Rangamati Circle |
Bandarban Division |
Revenue |
Mr.U.T.Mong |
| 620 |
739123 |
Construction of 25.74m (1x24.40m) Long P.C.Girder Bridge (KattoliPara Bridge) at 4th KM(Ch: 3km+122.80km) of Aziznagar-Gazalia-Lama Raod (Z-1007) under Bandarban Road Division during the year 2022-2023. |
2022-2023 |
Rangamati Circle |
Bandarban Division |
Revenue |
S. Ananta Bikash Tripura |
| 621 |
755718 |
Construction of 50.12m (1x48.78m) long P.CGirder Bridge ( Yancha Bridge) at 12th km (Ch. 11km+276m) ofChiringya ( Faishakhali) Lama- Alikadam Road ( Z-1005) under Bandarban Road Division,
during the year 2022-2023. |
2022-2023 |
Rangamati Circle |
Bandarban Division |
Revenue |
Rimi Nirman Ltd.-Mr.UTMong JV. |
| 622 |
757100 |
Construction ofUnderpass from Jatio Sangsad Bhaban Plaza to Residence of Perliament Members Across Manik Mia Avenue under Dhaka Road Division,Dhaka during the year 2022-2023 (PMPMajor
Bridge/Culvert). |
2022-2023 |
Dhaka Zone |
Dhaka Division |
Revenue |
Concrete &Steel Technologies Ltd.- ABAID MONSURCONSTRUCTIONS |
| 623 |
750356 |
Widening ,Strengthening and DBS-Wearing Course Work From Ch. 162+681 to 169+120 km. ofDhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patuakhali Road (N-8) under Barishal Road Division during the year 2022-2023. |
2022-2023 |
Barishal Zone |
Barishal Division |
Revenue |
Md. Mahfug Khan Ltd |
| 624 |
750357 |
Widening, Strengthening &DBS-Wearing Course work from Ch.155+730 (Gariarpar) to Ch. 162+681 (Chowmatha) km ofDhaka (Jatrabari) Mawa-Bhanga-Barishal-Patuakhali Road (N-8) under Road Division Barishal during the year 2022-2023. |
2022-2023 |
Barishal Zone |
Barishal Division |
Revenue |
Md. Mahfug Khan Ltd |
| 625 |
738717 |
Construction of 60.750m (2x12.20m RCCGirder+33.50m PCGirder) Long Bridge (Sonaichari Bridge) at 29th (p) Km (Ch: 28+599km) on Rangamati-Manikchari-Mohalchari-Khagrachari Road (R162) under Road Division Rangamati during the year 2022-2023 |
2022-2023 |
Rangamati Circle |
Rangamati Division |
Revenue |
S.Ananta Bikash Tripura - M/S. Selim &Brothers JV |
| 626 |
729195 |
Construction of Flexible Pavement in Place ofHBB,Rigid Pavement at Bazar Portion and Surfacing byDBS Wearing Course atCh. 186+067KMto Ch- 196+937KMat Bandarban-Chimbuk ThanchiAlikadam-Baisari-Naikhyongchari-Gundum Road(Z-1811) under Bandarban Road Division during the yea |
2022-2023 |
Rangamati Circle |
Bandarban Division |
Revenue |
Hassan Techno Builders Ltd.- M/SSaleh Ahmed-ABAID MONSURCONSTRUCTIONS (JV) |
| 627 |
756281 |
Periodic Maintenance Programme for widening, surfacing with DBST&Rigid Pavementwork from Ch. 0+000m to Ch. 24+300m of Tongi-Kaliganj-Ghorashal-Pachdona Road (R-301) Road under Gazipur Road Division during the year 2022-2023. |
2022-2023 |
Dhaka Zone |
Gazipur Division |
Revenue |
ABAID MONSUR CONSTRUCTIONS-Hassan Techno Builders Ltd.- NATIONAL DEVELOPMENT ENGINEERSLTD.-JV |
| 628 |
755999 |
Construction ofRigid Pavement from ch. 0+000 (approach of dapdapia bridge barishal end) to 1+800 km (Dapdapia old ferryghat Link portion) at 167+100 km ofDhaka(Jatrabari)-Mawa-BhangaBarishal-Patuakhali Road (N-8) under Barishal Road Division during the year 2022-2023 |
2022-2023 |
Barisal Circle |
Barishal Division |
Revenue |
Orient Trading &Builders Ltd. |
| 629 |
743136 |
Periodic Maintenance Programme (PMP-Bridge) on Construction of Super-Structure of 93.02m (30.488m x3) Long P.CGirder Bridge (Kibria Bridge) at 17th km (Ch. 16+750m) over Khoaie River on Shaistaganj-Habiganj-Nabiganj-Sherpur (Aushkandi) Road (R-240) Road under Habiganj Road Division, during the year 2022-2023. |
2022-2023 |
Moulvibazar Circle |
Habiganj Division |
Revenue |
MOZAHARENTERPRISE (PVT.) LTD. |
| 630 |
742625 |
Road Embankment Protection with Steel Guard Rail &Pre-cast Pile at different locations of Itna-Mithamain-Austagram Road under Kishoreganj Road Division during the year 2022-2023. |
2022-2023 |
Mymensingh Zone |
Kishoreganj Division |
Revenue |
Hassan Techno Builders Ltd.- National Development Engineers Ltd.- Sagar Info Builders Ltd. JV |
| 631 |
733152 |
Construction of 31.828m (1 x 30.488m) long
PC Girder Bridge at 11th Km (Ch.10+794, Ahomadabad Bridge) of Jamalganj-Sunamganj Road (R-370) under Periodic Maintenence Programme (PMP-Bridge) under Sunamganj Road Division of Road Circle Sylhet During the Year 2022-2023 |
2022-2023 |
Sylhet Circle |
Sunamganj Division |
Revenue |
M/S Janmabumi Nirmata, Ohiduzzaman Chowdhury & The Nirmitee (JON) JV |
| 632 |
733153 |
Superstructure work of 68.904m (1 x 19.296m
+ 1 x 28.824m + 1 x 19.296m) (RCC & PC Girder) Vombomi Bridge including Approach Road, Diversion Road, Toe Wall, Protective work etc. at 8th Km (gap No.8/2) of PaglaJagannathpur-Raniganj-Aushkandi Road (R-241) under Sunamganj Road Division of Road Circle Sylhet During the Year 2022-2023 |
2022-2023 |
Sylhet Circle |
Sunamganj Division |
Revenue |
M/SJanmabumi Nirmata, Ohiduzzaman Chowdhury& The Nirmitee (JON) JV |
| 633 |
763370 |
Repairing Damaged Pavement under Periodic Maintenance Program (PMP) byProviding
Aggregate Base Type-I,DBSBase Course with DBST&Rigid Pavementwork atCh. 36+321 to 53+321 km ofNaogoanAtrai-Natore (Natore Part) (R-548) Road under Road Division Natore during the year 2022-2023 |
2022-2023 |
Rajshahi Zone |
Natore Division |
Revenue |
Turna Enterprise (Pvt.) Ltd. |
| 634 |
739041 |
Construction of 25.74m (1x24.40m) Long P.C.Girder Bridge (Bridge No.13/4- Kolatol Bridge) at 13th KM(Ch: 12km+942km) of Bandarban-Roeangchari-Ruma Raod (Z-1813) under Bandarban Road Division during the year 2022-2023. |
2022-2023 |
Rangamati Circle |
Bandarban Division |
Revenue |
Mr.U.T.Mong |
| 635 |
773949 |
Periodic Maintenance Program (PMP) providing Dense Bituminous Surfacing- Wearing Course and HBBwork from Ch.115+040Km (Bhurghata) to Ch.119+670Km,Ch.139+730Km to Ch.147+230Km
,Ch.148+390Km to Ch.150+635Km &Ch.151+060Km to 151+465Km (Rahmatpur bridge Approach) ofDhaka (Jatrabari)- Mawa-Bhanga-Barishal-Patuakhali Road (N-8) under Barishal Road Division during the year 2022-2023. |
2022-2023 |
Barishal Zone |
Barishal Division |
Revenue |
Md. Mahfug Khan Ltd |
| 636 |
750520 |
Earth work, Widening, Strengthening, Surfacing,Hard Shoulder,Rigid Pavement,Drain, Culvert &Protective work from chainage 59+057 to 69+000 Km of Bogura-Naogaon-Mohadevpur-Patnitala DhamoirhatJoypurhatRoad (R-545) under Road Division Naogaon, during the year 2022-2023.( WP: 05) |
2022-2023 |
Rajshahi Circle |
Naogaon Division |
Development |
Toma Construction &Co. Limited - MAZaher Limited (JV) |
| 637 |
750395 |
Widening, Strengthening, Surfacing,Rigid Pavement, Intersection &Reconstruction of
2Nos RCCBoxCulvert etc at 7th to 18th km ofNaogaon- Badalgachi- Patnitala- Shapahar- Porsha- Rahanpur Road (R547) under Road Division,Naogaon during the year-2022-2023.(WP: 02 |
2022-2023 |
Rajshahi Circle |
Naogaon Division |
Development |
Toma Construction &Co. Limited - MAZaher Limited (JV) |
| 638 |
779020 |
Construction of 60.150m. (2x12.20m.R.C.C+ 33.54m. P.CGirder) Long Baisari Collage Bridge) at 6th Km. (Ch. 5+941.00m) on Banaripara(Danduat) - Nazirpur Road(Z-7710) Under Barishal Road Division During the year 2022-2023. |
2022-2023 |
Barisal Circle |
Barishal Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 639 |
779021 |
Construction of 25.74 m ( 1x24.40 m) Long P.CGirder Taltola Bridge at 14th km (Ch.13+130m) on Banaripara( Danduhat)- Nazirpur Road ( Z-7710) Under Barishal Road Division during the year 2022-
2023. |
2022-2023 |
Barisal Circle |
Barishal Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 640 |
729822 |
Periodic Maintenance Programme (PMP) Providing DBS-Wearing Course on main carraigeway(7.30) from Ch. 93+312km (Zora Culvert) to Ch. 97+062 km (Faltita) Level correction ofHard Shoulder byDBSBase Course from Ch. 80+062 km (Mollahat) to Ch. 97+062 km (Faltita) & Widening with surfacing from Ch. 109+233 km (Noapara) to Ch. 110+633 km (Katakhali) of Bhanga-Bhatiapara-Mollahat-Fakirhat-Noapara National Highway(N-805) under Road Division, Bagerhat. |
2022-2023 |
Khulna Zone |
Bagerhat Division |
Revenue |
MAZaher Limited |
| 641 |
779019 |
Construction of 22.680m (1x21.34m) Long RCCBridge (Darus Sunnat Madrasha Bridge) at 10th km (Ch 09+827) on Rajapur-Naikathi-Bekutia-Pirojpur Road (Pirojpur portion) (Z-8702) underPirojpur Road Division During the year 2022-2023. |
2022-2023 |
Barisal Circle |
Pirojpur Division |
Revenue |
Muhammad Aminul Haque (Pvt.) Ltd. |
| 642 |
790744 |
Periodic maintenance work for Providing Strengthening at Several Damaged Portions byAggregate Base Type-I With DBS-Base Course, Extra Widening byHBBat differentCurve, Bazar area and Road Junction Point &50mm wearing course from Ch.94+700 (Amgram) to Ch.103+400 (Mostafapur) &Installation of signsignal, K.MPost,Guide post along with other ancillaryworks ofDhaka (Jatrabari)-Mawa-Bhanga-Barisal-Patuakhali National Highway(N-8) under Madaripur Road Division during the year 2022-2023. |
2022-2023 |
Gopalgonj Circle |
Madaripur Division |
Revenue |
MOZAHARENTERPRISE (PVT.) LTD. |
| 643 |
783885 |
Construction ofCurve Widening, Brick MasonryToe-wall,Udrain &Concrete slope Protection and CCBlockwithGeo-Textile at differentChainage of Bhola(Porantalukderhat)-Borhanuddin-LalmohonCharfession-Charmanika Regional Highway(R890) under Road Division, Bhola during the year |
2022-2023 |
Barishal Zone |
Bhola Division |
Development |
Md. Mahfug Khan Ltd-M/S SADIKAAFIASIMI-M/S. Shahid Traders (JV) |
| 644 |
789854 |
DBSwearing course with necessaryRepair and construction ofRigid pavement at 1st km to 10th(P) km of Feni - Parsuram - Belonia Road (Z-1033), under Feni Road division during the year 2022-2023. |
2022-2023 |
Noakhali Circle |
Feni Division |
Revenue |
NATIONAL DEVELOPMENT ENGINEERSLTD. |
| 645 |
768546 |
PMP(Major-Bridge/Culvert) work For 99.770 m Long P.CGirder Bridge (Nagarkanda Bridge) At 11th km (Ch.10km+997.00m) onTalma- Nagarkanda (Z-8404) Road, under Road Division Faridpur During the FY2022-2023. |
2022-2023 |
Gopalgonj Zone |
Faridpur Division |
Revenue |
MOZAHARENTERPRISE (PVT.) LTD. |
| 646 |
773753 |
Construction of 66.830m (3x21.34m RCC) longGK3no Bridge ( PMPMajor-Bridge) at 2nd km (Ch. 1+969.50m) of Ã?ÂBheramara - Daulatpur Road (Z-7411) Under Kushtia Road Division, Kushtia during the year 2022-2023. |
2022-2023 |
Kushtia Circle |
Kushtia Division |
Revenue |
Jahirul Limited |
| 647 |
788447 |
PMP Work for Strengthening, Surfacing byDBS Wearing Course and RCC palisiding Road marking at 11th Km to 19th(p) Km. (Ch.10+000 to 19+000 m) &22nd Km to 26th Km (Ch. 21+000 to 26+000 m) ofDinmonibazar-Moulavibazar-Companirhat-Choto Feni Nadhi Road (Z-1508) Under Noakhali road Division during the year 2022-2023. |
2022-2023 |
Noakhali Circle |
Noakhali Division |
Revenue |
Hassan Techno Builders Ltd.- M/SSaleh Ahmed-ABAID MONSURCONSTRUCTIONS (JV) |
| 648 |
789994 |
Construction ofRigid pavement at 1st km to 2nd(p) km(Ch. 0+000 to 1+360)of Hazrat Shah Amiruddin Paglamia Road (R-149) under Feni Road division during the year 2022-2023. |
2022-2023 |
Noakhali Circle |
Feni Division |
Revenue |
NATIONAL DEVELOPMENT ENGINEERSLTD. |
| 649 |
791194 |
Periodic Maintenance Work for Construction ofRigid Pavement atCh. 28+630 to 28+930 (Burirhat Bazar), &Ch. 35+250 to 35+958 (Bhedargonj Bazar) of Mostafapur-Madaripur-Shariatpur(Monohar Bazar)-Ibrahimpur-Horiana-Chandpur Road (R-860) under Shariatpur Road Division, during the year 2022-2023. |
2022-2023 |
Gopalgonj Circle |
Shariatpur Division |
Revenue |
MOZAHARENTERPRISE (PVT.) LTD. |
| 650 |
734966 |
Construction ofRigid Pavement atCh. 1+500(Londoni road) Londoni Road to 2+000 (Pattantulla),Ch.02+270 (Modina market east) to 2+570 (Modina marketwest) &Ch.5+690 to 6+100 and Overlaywork atCh.4+800 (Kumargang) to 5+690&6+100km (Tukarbazar) Km of Sylhet-Sunamganj Road Under Road Division, Sylhet ofRoad Zone SylhetDuring the year 2022-2023. |
2022-2023 |
Sylhet Zone |
Sylhet Division |
Revenue |
M/S. Md. Jamil Iqbal - Mazid Sons Construction Ltd. JV |